Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.4 LAdmitted-Finance | -8.92% | ₹8.4 L | L1 | Admitted-Finance |
| 2 | L2₹8.8 L+₹42,853.94 (5.13%)Admitted-Finance AJMER | RAJASTHAN | 305001 | -4.25% | ₹8.8 L+₹42,853.94 (5.13%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Reject |
Tender Value
₹9.2 L
EMD Value
₹18,400
Closing Date
21 Jun 2026, 6:00 pmClosed
MUTHU S
DCF WL MNP KOTA OFFICE
CONSTRUCTION OF TOURIST FACILITY(TOILET/BATHROOM)AT CHOWKI DOULATGANJ IN RANGE BORABAS
2026_FORES_568022_1
NIT-02/2026-27
Open Tender
Civil Works
Percentage
KOTA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
AS PER NIT
₹18,400
Yes
24 Jun 2026
15 Jun 2026
22 Jun 2026
15 Jun 2026
21 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of Toilet | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil. | - | cum | 175 | - |
| 1.02 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | cum | 3,302 | - |
| 1.03 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 1 | cum | 2,838 | ₹2,835.16 |
| 1.04 | Random Rubble stone masonry with hard stone in
superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). | - | cum | 3,479 | - |
| 1.05 | Supplying and Filling in plinth with blown sand under floors including watering ramming consolidating and dressing complete including cost of sand. | - | cum | 450 | - |
| 2 | Random rubble dry stone Kharanja under floor. | - | cum | 932 | - |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). | - | cum | 4,624 | - |
| 4 | 5.2 Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in :
Cement mortar 1 : 6 (1 cement : 6 coarse sand) | 1 | cum | 4,990 | ₹4,985.01 |
| 5 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level for: Suspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | 1 | sqm | 340 | ₹339.66 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.14 MB
BID.pdf
Tender Documents • 2.13 MB
Gschedule.pdf
Other Document • 5.27 MB
Estimate.pdf
Additional Documents • 5.16 MB
BOQ_1010499.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .