| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹30.6 L+₹5,392 (0.18%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Chandrakant Narayan Gawas L1 | FATO A GAONKAR L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation in all type of strata comprising any of the materials such as soil, silt, clay gravel, moorums of all varities shingles, pebble all type of laterite rock, soft rock, ordinery rock, disintegrated rock, fissured/shattered, decomposed materials, either in full or in parts as the case may be adopting any approved method or methods as may be convinient or permitted inclusive of chiselling, wedging etc. in all conditions such as dry moist, saturated submerged, foul conditions etc. including pumping or bailing out water, shoring and structing providing barricading danger lighting guarding and back filling the excavation earth to the extent required and disposal of excavated stuff in specified area lead up to 50m and with all lifts etc complete and as per specification and drawing and as directed by the engineer inchargar etc all complete | 585 | M3 | 259 ₹1,51,515 Lowest | 265 ₹1,55,025 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 39 | M3 | 1,320 ₹51,480 Lowest | 1,326 ₹51,714 |
| 3.00 | Providing & Laying cement concrete 1:1.5:3 (1 Cement: 1.5 Coarse Sand: 3 Graded Granitic or Basiltic Stone aggrt. 20mm nominal size) excluding cost of centering , shuttering and finishing in:
a) All Works upto plinth level | 412 | M3 | 6,335 ₹26,10,020 Lowest | 6,339 ₹26,11,668 |
| 4.00 | Centering and shuttering including struttings, propping etc. and removal of formworks for:
a) Foundations, footings, bases for columns and mass concrete. | 559 | M2 | 312 ₹1,74,408 Lowest | 312 ₹1,74,408 Lowest |
| 5.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer incharge.
a) 110mm dia | 167 | RM | 371 ₹61,957 Lowest | 371 ₹61,957 Lowest |
| 6.00 | Providing construction of joints with 20mm thick thermocol sheets at specific required interval in retaining wall. | 13 | M2 | 98 ₹1,274 Lowest | 98 ₹1,274 Lowest |
Tender Value
₹34.5 L
EMD Value
₹68,957
Closing Date
25 Nov 2025, 5:30 pmClosed
EEVI, WRD, Bicholim
EEVI, WRD, Bicholim
Construction of protection Wall to the Right Side bank of the river Kalti in Survey No. 2/7 at Ghoteli No. 1 in V.P. Querim Sattari Taluka. (Re-Tender)
2025_WRD_26328_1
WRD/WDVI/PB/F.30/TN e 35/2025-26/698 line 13 Dated 12/11
Open Tender
Civil Works - Water Works
Item Rate
60 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹68,957
23 Jan 2026
14 Nov 2025
26 Nov 2025
14 Nov 2025
25 Nov 2025
14 Nov 2025
Earthwork in excavation in all type of strata comprising any of the materials such as soil, silt, clay gravel, moorums of all varities shingles, pebble all type of laterite rock, soft rock, ordinery rock, disintegrated rock, fissured/shattered, decomposed materials, either in full or in parts as the case may be adopting any approved method or methods as may be convinient or permitted inclusive of chiselling, wedging etc. in all conditions such as dry moist, saturated submerged, foul conditions etc. including pumping or bailing out water, shoring and structing providing barricading danger lighting guarding and back filling the excavation earth to the extent required and disposal of excavated stuff in specified area lead up to 50m and with all lifts etc complete and as per specification and drawing and as directed by the engineer inchargar etc all complete
Providing & Laying cement concrete 1:1.5:3 (1 Cement: 1.5 Coarse Sand: 3 Graded Granitic or Basiltic Stone aggrt. 20mm nominal size) excluding cost of centering , shuttering and finishing in: a) All Works upto plinth level
Centering and shuttering including struttings, propping etc. and removal of formworks for: a) Foundations, footings, bases for columns and mass concrete.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer incharge. a) 110mm dia
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
Tendernotice_2.pdf
PDF • 1.10 MB
BOQ_26765.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .