| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC V P O DUTTNAGAR TEHSIL RAMPUR DISTT SHIMLA H P | RAMPUR | SHIMLA | HIMACHAL PRADESH | ₹4.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.9 L+₹54,510.07 (12.4%)Rejected-Finance VILL BAROTA JATTAN P O BERI RAJDIYA TEHSIL SADAR DISTT BILASPUR HP | ₹4.9 L+₹54,510.07 (12.4%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.1 L+₹67,650.88 (15.4%)Rejected-Finance CHOBATA STREET MANDI DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | ₹5.1 L+₹67,650.88 (15.4%) | L3 | Rejected-Finance L3 |
| 4 | L4₹5.1 L+₹75,438.04 (17.2%)Rejected-Finance VILL BHANTREHED PO BAROTI SUB TEH DEHAR MANDI HP 175030 | MANDI | HIMACHAL PRADESH | 175030 | ₹5.1 L+₹75,438.04 (17.2%) | L4 | Rejected-Finance L4 |
| 5 | L5₹5.2 L+₹79,818.31 (18.2%)Rejected-Finance C O GK POWER TECH ENTERPRISES VILL DOKRU PO ROHAL TEHSIL JHANDUTTA DISTT BILASPUR H P | ₹5.2 L+₹79,818.31 (18.2%) | L5 | Rejected-Finance L5 |
Tender Value
₹4.9 L
EMD Value
₹4,867
Closing Date
30 Jun 2026, 11:00 amClosed
Sr. Executive Engineer
Sr. Executive Engineer, Electrical Division , HPSEBL, Bilaspur.
Tender for cleaning jungle, cutting looping of trees underneath the existing 11kV HT line and uprooting of rank vegetation around the lines in (E) Section Beri ESD No.I Bilaspur. Ch.to. R/M of HT line during the year 2026-27.
2026_HPSEB_137224_1
13/2026-27
Open Tender
Miscellaneous Works
Percentage
120 days
ED Bilaspur
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
₹4,867
6 Jul 2026
22 Jun 2026
30 Jun 2026
22 Jun 2026
30 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.02 | 33Kv ckt Beri Section :- | - | - | - | - |
| 1.03 | Cutting and looping of trees, bushes, tree branches, and saplings underneath the existing HT line within a corridor of 1.5 m on either side of the line, including uprooting and removal of rank vegetation, grass, and brushwood. The work shall also include cleaning and vegetation clearance around Distribution Sub-Stations at various locations under Electrical Sub-Division No. I, HPSEBL, Bilaspur, and maintaining the area in good condition as directed by the Engineer-in-Charge, Electrical Section Beri, complete in all respects. job of cutting is to be executive for two times during award period i.e. (1) cutting shall be completed by 20 July 2026 (2) cutting shall be completed by 30 Oct. 2026. Total 33 KV H.T. line area for Two Time Cutting =9986 x 2= 19972 | 19,972 | Per Sq. mtr. | 7.27 | ₹1,45,196.44 |
| 1.04 | 11Kv Beri Section Barmana feeder:- | - | - | - | - |
| 1.05 | Cutting and looping of trees, bushes, tree branches, and saplings underneath the existing HT line within a corridor of 1.5 m on either side of the line, including uprooting and removal of rank vegetation, grass, and brushwood. The work shall also include cleaning and vegetation clearance around Distribution Sub-Stations at various locations under Electrical Sub-Division No. I, HPSEBL, Bilaspur, and maintaining the area in good condition as directed by the Engineer-in-Charge, Electrical Section Beri, complete in all respects. job of cutting is to be executive for two times during award period i.e. (1) cutting shall be completed by 20 July 2026 (2) cutting shall be completed by 30 Oct. 2026. Total 11 KV H.T. line area for Two Time Cutting =11674 x 2= 23348 | 23,348 | Per Sq. mtr. | 7.27 | ₹1,69,739.96 |
| 1.06 | 11Kv Beri Section Beri Feeder:- | - | - | - | - |
| 1.07 | Cutting and looping of trees, bushes, tree branches, and saplings underneath the existing HT line within a corridor of 1.5 m on either side of the line, including uprooting and removal of rank vegetation, grass, and brushwood. The work shall also include cleaning and vegetation clearance around Distribution Sub-Stations at various locations under Electrical Sub-Division No. I, HPSEBL, Bilaspur, and maintaining the area in good condition as directed by the Engineer-in-Charge, Electrical Section Beri, complete in all respects. job of cutting is to be executive for two times during award period i.e. (1) cutting shall be completed by 20 July 2026 (2) cutting shall be completed by 30 Oct. 2026. Total 11 KV H.T. line area for Two Time Cutting =11813 x 2= 23626 | 23,626 | Per Sq. mtr. | 7.27 | ₹1,71,761.02 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_203082.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_203082.xls
BOQ • 0.28 MB
Bid13.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .