Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance MADHAVI NAGAR GADAI PURA A B ROAD GWALIOR DIST GWALIOR M P | GWALIOR | MADHYA PRADESH | 474001 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹38.1 L
EMD Value
₹76,223
Closing Date
17 Oct 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SA ASI JAIPUR CIRCLE JAIPUR
Superintending Archaeologist, Archaeological Survey of India, Jaipur Circle, 70/133-140, Patel Marg, Mansarovar, Jaipur-302020
Conservation and Restoration of dome inner and outer portion of Shiv temple at Charchoma Distt. Kota (Complete work)
2023_ASI_773856_1
3/105/JPR/2023-24-W
Open Tender
Civil Works
Works
150 days
Shiv temple at Charchoma Distt. Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹76,223
Yes
7 Nov 2023
29 Sept 2023
18 Oct 2023
29 Sept 2023
17 Oct 2023
29 Sept 2023
29 Sept 2023 - 17 Oct 2023
Amount
Description of items and specification of work to be excuted.
Erection and dismantling scaffolding with wooden ballies and bamboo challies for execution of work including carrying the scaffolding material to working site and back etc complete.
Scrapping the dead/pulverized lime punning by sand paper very carefully & washing the surface after the removal of the punning etc complete.
Removal Taking out the dead weather/ cracked / damaged Plaster of thickness 25-30 mm average of wall very carefully & disposal of the unserviceable material lead up to 100 mts lift upto 5 mts to 8 mts etc complete.
Taking out/removal of dead/sunken/pulverized lime concrete very carefully in flooring area to avoid any damage of structure & disposal of unserviceable material by manually in head load with lead app. 200mtr etc. complete.
Taking out and lowering down & replacement of broken/cracked and missing chajja stones by providing & fixing the 50mm avg. thick including making the grooves & joints and interlocking with S.S. Rod (Nails) anchoring with lime surkhi mortar 1:1:1 as per original etc complete.
Taking out the existing bulged/sunken & cracked loose Ashlar/Veneering 10cm avg thickness stone very carefully without any damage of adjoining structures and stacking the serviceable stone with numbering system at suitable place for reuse and disposal of unserviceable material by head load approx. 100mtr etc complete.
Taking out of existing cracked, decayed & damaged stone flooring very very carefully including shorting out and stacking the serviceable stone at a suitable place for reuse and disposal of unserviceable material lead 50 mtr etc complete.
Replastering of (25 to 30mm) average thick in three coat with lime surkhi mortar 1:1:1 (1 Lime : 1 C.Sand : 1 Surkhi) mixed with traditional adhesive material that is belgiri, gud, gond etc as per design/texture & top of wall & parapet wall etc complete in all respect.
Replastering of Shikhara portion (25 to 30mm) average thickness in three coat with lime surkhi mortar 1:1:1 (1 Lime : 1 Surkhi : 1 C. Sand) mixed with waterproofing compound & traditional adhesive material i.e. Gud, Belgiri, Gond, Jute etc highly moulded and carved with design as per original etc complete in all respect.
Providing & laying 1:2 lime concrete of Roof Terrace & Floor portion with brick aggregate (20 to 40mm) size & 50% of lime mortar 1:1:1 (1 Lime : 1 Surkhi : 1 C.Sand) with binding solution of belgiri, gud, methi & jute and adhesive material beating with bamboo stick first & then with thaphi till the surface is harden to maintain the proper slope & top surface finishing etc complete in all respect.
Random Rubble Stone Masonry of back filling Ashlar/Veener Stone with lime surkhi mortar 1:1:1 (1 Lime : 1 Surkhi : 1 C. Sand) mixed with traditional cohesive material i.e. Belgiri, Gum, Gud in collecting/new stones as per original matching etc complete.
Providing and laying 75 mm thick avg buff colour stone coping (Bansi Pahadpur) in the top of wall (fixed with M.S. Railing) over 50mm thick base of Lime mortar 1:1:1 (1 lime : 1 coarse sand : 1 surkhi) including cutting, chiseling, dressing, molding and fixing etc complete in all respect. (Note-The sample of flag stone will be approved by circle office before execution of the work)
Providing & laying the 6mm thick lime punning with special mortar with lime, gum & marble dust of similar to original & preparing the surface for lime punning complete in all respect.
"Providing & Fixing sand stone (70 to 75) mm Avg (Bijolia Quarry) Flooring of platform rough chiseled stone flooring over 20mm bed of Mortar of 1:1:1 (1 Lime : 1 C.sand : 1 B.Surkhi) joint finished etc. complete"
Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners , stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in charge.
Resetting the heavy stone masonry lower support wall with Ashlar Facing avg thickness (8-10cm) as per original by using the usefull material/stones obtained from Item No. 6 & 30% New fine chiseled dressed stone to match the existing Ashlar Masonry with lime mortar 1:1:1 (1 Lime: 1 Surkhi : 1 C. Sand) & making the holes for interlocking with each other by S.S. Rod etc complete in all respect.
Applying two coat of synthetic enamel paint of approved brand on M.S. Gates, Railing including a coat of primer with scraping of sand paper etc complete.
Disposal of malba/debries & unserviceable materials received from the site during the work to outer area by tractor/trolley including loading/unloading with lead approx. 7 to 8 kms etc complete in all respect. (Note - It is for estimate purpose only actual qty. will be measured and recorded during execution of the work)
Parveen Kumar Contractor
M/s Ashish Enterprises
khandelwal construction company
PAWAN ENTERPRISES
INDRAJ MEENA CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .