Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 LAccepted-AOC | ₹10.8 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹13.2 L+₹2.4 L (22.5%)Rejected-AOC | ₹13.2 L+₹2.4 L (22.5%) | L2 | Rejected-AOC L2 Bidder |
| 3 | L3₹13.6 L+₹2.9 L (26.8%)Rejected-AOC | ₹13.6 L+₹2.9 L (26.8%) | L3 | Rejected-AOC L3 Bidder |
| Sl No | Description | Qty | Unit | Electro Tech Engineers L1 | G S Electrical Works L2 | Mohindra Electrical Engineer L3 |
|---|---|---|---|---|---|---|
| 1.01 | Arranging & Providing of 315 Kw HT Motor rotor copper bars. | 1 | Job | 3,39,900 ₹3,39,900 Lowest | 4,10,000 ₹4,10,000 | 4,00,000 ₹4,00,000 |
| 1.02 | Arranging & Providing of 315 Kw HT Motor rotor both site copper end rings | 1 | Set | 2,09,980 ₹2,09,980 Lowest | 2,70,000 ₹2,70,000 | 2,90,000 ₹2,90,000 |
| 1.03 | Dismantling of Rotor core Replacement Staggering of HT Rotor Core (including material labour, brazing, balancing, and testing) (including material labour, stamping lock ring , dummy stamping ring, outer lock ring) | 1 | Job | 2,25,450 ₹2,25,450 Lowest | 2,65,000 ₹2,65,000 | 2,79,000 ₹2,79,000 |
| 1.04 | Transportation of 1 No. HT motors from DCRTPP to Firm Workshop and back | 1 | Job | 14,850 ₹14,850 Lowest | 20,000 ₹20,000 | 21,000 ₹21,000 |
| 1.05 | Transit Insurance from DCRTPP to Firm Workshop and back | 1 | Nos | 2,400 ₹2,400 Lowest | 3,200 ₹3,200 | 3,200 ₹3,200 |
| 1.06 | Dynamic Balancing of Rotor and Fan of Motor | 1 | Nos | 43,600 ₹43,600 Lowest | 48,000 ₹48,000 | 65,000 ₹65,000 |
| 1.07 | Providing New External cooling fan | 1 | Nos | 54,470 ₹54,470 Lowest | 65,000 ₹65,000 | 71,000 ₹71,000 |
| 1.08 | Providing and fitting new RTDs for DE and NDE bearing | 2 | Nos | 10,650 ₹21,300 Lowest | 18,000 ₹36,000 | 13,500 ₹27,000 |
Tender Value
Refer Docs
EMD Value
₹22,130
Closing Date
22 Dec 2025, 12:00 pmClosed
SARVJEET KUMAR
CE DCRTPP Yamuna Nagar
Repair of rotor of HT Motor of TAC (315 kW, 6.6kV, 1490 RPM,
2025_HBC_490116_1
2025C2597820 F340 4C16 9190 911A77907DC5711PGC
Open Tender
Electrical Works
Works
168 days
RATTANPURA
As per NIT
2 documents required · 2 mandatory
₹1,180
₹22,130
Yes
14 Mar 2026
13 Dec 2025
24 Dec 2025
13 Dec 2025
22 Dec 2025
13 Dec 2025
13 Dec 2025 - 17 Dec 2025
Arranging & Providing of 315 Kw HT Motor rotor copper bars.
Arranging & Providing of 315 Kw HT Motor rotor both site copper end rings
Dismantling of Rotor core Replacement Staggering of HT Rotor Core (including material labour, brazing, balancing, and testing) (including material labour, stamping lock ring , dummy stamping ring, outer lock ring)
Transportation of 1 No. HT motors from DCRTPP to Firm Workshop and back
Transit Insurance from DCRTPP to Firm Workshop and back
Dynamic Balancing of Rotor and Fan of Motor
Providing New External cooling fan
Providing and fitting new RTDs for DE and NDE bearing
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_568352.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .