| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹56.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹56.9 L+₹55,871.37 (0.99%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹57.0 L+₹65,033.87 (1.15%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹63.4 L+₹7.0 L (12.5%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹65.0 L+₹8.6 L (15.3%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | LALIT CONTRACTOR L8 | M/S RAKESH CHHABRA CONTRACTOR L4 | BKINC PROJECTS PRIVATE LIMITED L5 | RAJPAL SINGH CONTRACTOR L7 | MY BROTHERS CONSTRUCTION L3 | KESHAV PANERU CONTRACTOR L2 | M/S GAUHAR ALI CONSTRUCTION L1 | M/s MS Construction, Rudrapur L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation for Structures
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil Upto 3 m depth | 12.24 | Cum | 428.5 ₹5,244.84 | 400 ₹4,896 | 250 ₹3,060 | 428 ₹5,238.72 | 150 ₹1,836 Lowest | 200 ₹2,448 | 274.84 ₹3,364.04 | 428.5 ₹5,244.84 |
| 2.00 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:4 cement mortar | 88.2 | Cum | 6,454.5 ₹5,69,286.9 | 2,500 ₹2,20,500 Lowest | 4,000 ₹3,52,800 | 6,455 ₹5,69,331 | 4,500 ₹3,96,900 | 4,000 ₹3,52,800 | 3,800 ₹3,35,160 | 6,454.5 ₹5,69,286.9 |
| 3.00 | Providing concrete for plain/ reinforced concrete inopen foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6 | 4.9 | Cum | 6,281.3 ₹30,778.37 | 6,000 ₹29,400 | 5,500 ₹26,950 | 6,282 ₹30,781.8 | 4,500 ₹22,050 | 4,000 ₹19,600 | 3,800 ₹18,620 Lowest | 6,281.3 ₹30,778.37 |
| 4.00 | WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.By Mechanical Means | 933.76 | Cum | 2,334.3 ₹21,79,675.97 | 750 ₹7,00,320 Lowest | 850 ₹7,93,696 | 2,334 ₹21,79,395.84 | 1,000 ₹9,33,760 | 1,000 ₹9,33,760 | 1,306 ₹12,19,490.56 | 2,334.3 ₹21,79,675.97 |
| 5.00 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.By Mechanical Means | 933.76 | Cum | 2,404.4 ₹22,45,132.54 | 2,200 ₹20,54,272 | 850 ₹7,93,696 Lowest | 2,405 ₹22,45,692.8 | 1,000 ₹9,33,760 | 1,050 ₹9,80,448 | 1,305 ₹12,18,556.8 | 2,404.4 ₹22,45,132.54 |
| 6.00 | Edging with 2nd Class Bricks, Laid Dry Length wise including excavation, refilling, consolidation, with a hand packing and spreading nearly surplus earth within a lead of 50 metres | 6,640 | Rm | 42 ₹2,78,880 | 30 ₹1,99,200 | 35 ₹2,32,400 | 42 ₹2,78,880 | 30 ₹1,99,200 | 25 ₹1,66,000 Lowest | 26.94 ₹1,78,881.6 | 42 ₹2,78,880 |
| 7.00 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 12.25 | Cum | 53 ₹649.25 | 35 ₹428.75 | 500 ₹6,125 | 54 ₹661.5 | 51 ₹624.75 | 21 ₹257.25 Lowest | 33.99 ₹416.38 | 53 ₹649.25 |
| 8.00 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, reading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto1000 m as per Technical Specification Clause 303.1 | 983.75 | Cum | 397.2 ₹3,90,745.5 | 20 ₹19,675 Lowest | 150 ₹1,47,562.5 | 397 ₹3,90,548.75 | 150 ₹1,47,562.5 | 150 ₹1,47,562.5 | 240 ₹2,36,100 | 397.2 ₹3,90,745.5 |
| 9.00 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.. | 12,450 | Sqm | 14 ₹1,74,300 | 14 ₹1,74,300 | 24 ₹2,98,800 | 14 ₹1,74,300 | 13.4 ₹1,66,830 | 13.4 ₹1,66,830 | 10 ₹1,24,500 Lowest | 13.4 ₹1,66,830 |
| 10.00 | 20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause 508.2 .. | 12,450 | Sqm | 163.1 ₹20,30,595 | 164 ₹20,41,800 | 243.8 ₹30,35,310 | 163 ₹20,29,350 | 163 ₹20,29,350 | 163.1 ₹20,30,595 | 135 ₹16,80,750 Lowest | 163 ₹20,29,350 |
Tender Value
₹87.9 L
EMD Value
₹1.8 L
Closing Date
25 Sept 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer P. D. P.W.D. Rudrapur
Reconstruction of the Road from Gram Balramnagar to Khempur under Honble Chief Minister Announcement No. 103-2026 in Gadarpur Assembly Constituency of District Udham Singh Nagar.
2026_pwd_100356_1
2227/3AC Date 08.09.2026(6)
Open Tender
Civil Works - Roads
Item Rate
270 days
Gadarpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Engineer P. D. P.W.D. Rudrapur
₹1.8 L
28 Sept 2026
19 Sept 2026
26 Sept 2026
19 Sept 2026
25 Sept 2026
19 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Ordinary soil Upto 3 m depth | 12.24 | Cum | - | - |
| 2 | Brick masonry work in cement mortar in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 600, 1202 & 1203 Brick masonry in 1:4 cement mortar | 88.2 | Cum | - | - |
| 3 | Providing concrete for plain/ reinforced concrete inopen foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6 | 4.9 | Cum | - | - |
| 4 | WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.By Mechanical Means | 933.76 | Cum | - | - |
| 5 | WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness,hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405.By Mechanical Means | 933.76 | Cum | - | - |
| 6 | Edging with 2nd Class Bricks, Laid Dry Length wise including excavation, refilling, consolidation, with a hand packing and spreading nearly surplus earth within a lead of 50 metres | 6,640 | Rm | - | - |
| 7 | Construction of Embankment with Material Obtained from Roadway Cutting Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 | 12.25 | Cum | - | - |
| 8 | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, reading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto1000 m as per Technical Specification Clause 303.1 | 983.75 | Cum | - | - |
| 9 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.. | 12,450 | Sqm | - | - |
| 10 | 20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical Specification Clause 508.2 .. | 12,450 | Sqm | - | - |
stage.html
html • 0.03 MB
finance_118306.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_118306.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .