Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.4 L+₹20,207.04 (4.86%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.8 L+₹65,294.84 (15.7%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹6.3 L+₹2.1 L (51.7%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical | - | Rejected-Technical NIT no. and S no. of work not mention ON CDR |
Tender Value
₹7 L
EMD Value
₹14,000
Closing Date
10 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW DIVISION RAJOURI
OFFICE OF EXECUTIVE ENGINEER REW DIVISION RAJOURI
PLZ REFER NIT
2026_RDPR_330203_4
e-NIT No. 148 REW Rajouri of 2026 Dated 02-11-2026 (2nd Call)
Open Tender
Civil Works
Percentage
RAJOURI
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
REVENUE HEAD
₹14,000
14 Nov 2026
5 Nov 2026
11 Nov 2026
5 Nov 2026
10 Nov 2026
5 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shaft ,wells, cesspits and the like not exceeding 10 sqm on plan, in 80% AKS , 20% HR | 43.28 | Cum | 444.69 | ₹19,246.18 |
| 2 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m | 366 | Cum | 91.75 | ₹33,580.5 |
| 3 | Providing and laying in position cement concrete of M5 grade including curing but excluding the cost of centring and shuttering. All work upto plinth level. | 6.12 | Cum | 4,826.5 | ₹29,538.18 |
| 4 | Providing and laying in position cement concrete of M10 grade with Boulders including curing but excluding the cost of centring and shuttering. For Cement Concrete 70% | 45.23 | Cum | 5,733.6 | ₹2,59,330.73 |
| 5 | Providing and laying in position cement concrete of M10 grade with Boulders including curing but excluding the cost of centring and shuttering. For Boulders 30% | 19.39 | Cum | 716 | ₹13,883.24 |
| 6 | Providing and Laying RCC in M20 Grade including curing but excluding the cost of centring and shuttering. | 3.29 | Cum | 9,821.85 | ₹32,313.89 |
| 7 | Steel Reinforcement for RCC Work | 361.35 | kg | 123.2 | ₹44,518.32 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations & Abutments | 123.07 | Sqm | 286.35 | ₹35,241.09 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for Suspended floor | 5.76 | Sqm | 718.2 | ₹4,136.83 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work For Edges | 3.05 | Sqm | 1,145.1 | ₹3,492.55 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.48 MB
BOQ_1120745.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .