| 1 | L1₹32.9 LAccepted-AOC SHOP NO 06 FIRST FLOOR OPP CHAMUNDA HOTEL AT BOKHIRA DIST PORBANDAR GUJARAT 360 579 | PORBANDAR | GUJARAT | 360579 | L1 | Accepted-AOC BEING L1 | |
| 2 | L2₹34.3 L+₹75,522 (2.25%)Rejected-Finance 3 SHITALNATH FLATE 1 NR KHANPUR JAIN TEMPLE OPP BANK OF INDIA SHAHPUR AHMEDABAD GUJARAT 380001 | AHMADABAD | GUJARAT | 380001 | L2 | Rejected-Finance BEING L2 | |
| 3 | L3₹35.6 L+₹2.1 L (6.16%)Rejected-Finance HQ CE SC PUNE | PUNE | MAHARASHTRA | 410301 | L3 | Rejected-Finance BEING L3 | |
| 4 | L4₹35.8 L+₹2.3 L (7.00%)Rejected-Finance HARSH INFRASTRUCTURE NEAR DWARKADISH PETROLEUM NANDANA DEVBHOOMI DWARKA JAMNAGAR GUJARAT 361315 | DEVBHUMI DWARKA | GUJARAT | 361315 | L4 | Rejected-Finance BEING L4 | |
| 5 | L5₹36.5 L+₹3.0 L (9.06%)Rejected-Finance KUCHHADI VADI VISTAR PORBANDAR GUJARAT 360579 | PORBANDAR | GUJARAT | 360579 | L5 | Rejected-Finance BEING L5 |
Tender Value
₹32.8 L
EMD Value
₹65,700
Closing Date
17 Jun 2025, 6:00 pmClosed
GE (I) CG PORBANDAR
GE (I) CG PORBANDAR OPP BIRLA FACTORY PORBANDAR
PROVISION OF FOOTPATH, PAVEMENT QUALITY CONCRETE (PQC), RCC CULVERT AND 02 Nos TOUGHENED GLASS DOORS AT CGDHQ-15 OKHA UNDER GE I CG PORBANDAR
2025_MES_710539_1
8085A/E8
Open Tender
Civil Works
Item Rate
180 days
OKHA
As per NIT
8 documents required · 8 mandatory
₹500
GE I CG PORBANDAR
₹65,700
Yes
28 Jul 2025
27 May 2025
19 Jun 2025
27 May 2025
17 Jun 2025
11 Jun 2025
Amount
SCHEDULE 'A' B/R ITEMS
Excavating in trenches, not exceeding 1.5 Metre wide and not exceeding 1.5 Metre in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. not exceeding 10 Sqm on plan and not exceeding 1.5 Metre in depth and getting out in soft/loose soil, complete all as specified and directed by Engineer-in-charge.
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exceeding 25 cm, Complete all as specified and directed by Engineer-in-Charge.
Removing excavated material not exceeding 50 Metre and depositing where directed at a level not exceeding 1.5 Metre above the starting point, Complete all as specified and directed by Engineer-in-Charge.
Material & Labour for PCC 1:4:8 type D-2 using 40mm graded stone aggregate as in foundation filling and mass concrete, complete all as specified and directed by Engineer-in-charge.
Material & Labour for providing Pre-cast cement concrete type C-1, 1:3:6 (20mm graded aggregate) block masonry with solid blocks, exc. 10cm in width and setting in cement mortar 1 :6, complete all as specified and directed by Engineer-in-charge.
Material & Labour for rendering on fair faces of brick work or concrete surface of wall 15mm thick in Cement Mortar 1:4 and to be finished even and smooth without using extra cement, complete all as specified and directed by Engineer-in-charge.
Material & Labour for PCC 1:2:4 type B-2 using 40mm graded stone aggregate as in surface channels of drains, complete all as specified and directed by Engineer-in-charge.
Material & Labour for Reinforced concrete pipes OD dia 450mm, class NP-2, laid and jointed complete with collars, complete all as specified and directed by Engineer-in-charge.
Material & Labour for Mild steel CRS TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips, Complete all as specified and directed by Engineer-in-Charge.
Formwork to edges of concrete flats, treads, breaks in floors, window cills, concrete railings, openings in concrete walls, floor and roofs not exceeding 20 cm wide and sides of RCC/ PCC bands in walls, horizontal or sloping and similar work exceeding 10cm but not exceeding 20cm wide rough finished, complete all as specified and directed by Engineer-in-charge.
Material & Labour for RCC (Nominal Mix type B-1, 1:2:4 (Using 20mm graded stone aggregate) as in Slabs supported on walls, beams and columns in floors, roofs, landings, balconies, canopies, deck slabs and in shelves and the like, complete all as specified and directed by Engineer-in-charge.
Material & Labour for Precast RCC 1:2:4 type B-1 using 20mm graded stone aggregate as in manhole cover slabs, of any thickness, size or shape including necessary form work, set and jointed in cement mortar (1:4) , complete all as specified and directed by Engineer-in-charge.
Material & Labour for Surface dressing not exceeding 15 cm deep and getting out in soft/loose soil, complete all as specified and directed by Engineer-in-charge.
Material & Labour for Hard-core of broken stone or boulders of gauge not exceeding 63mm, deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface, complete all as specified and directed by Engineer-in-charge.
Material & Labour for cement concrete 100mm thick, type D-2, 1:4:8 (40mm graded aggregate) as in floor as in sub base for laying floor finishes, complete all as specified and directed by Engineer-in-charge.
Material & Labour for Sand filling under floors or in foundations including watering and consolidation, complete all as specified and directed by Engineer-in-charge.
Material & Labour for M-40 grade 80mm thick machine pressed precast concrete interlocking paver block any shape and size with grey cement and pigment confirming to IS 15658-2006, complete all as specified and directed by Engineer-in-charge.
Demolition of cement concrete un-reinforced in ground floor and paving not exceeding 15cm thick (below or above ground level), complete all as specified and directed by Engineer-in-charge.
Material & labour for Providing and Laying Dry lean Concrete (DLC) 150mm thick of aggregate gradation as per Table-1 of SP 49:2014 having 7 day average compressive strength not less than 7 MPa Minimum cement content not less than 140 Kg/Cum. DLC mixed in Batching Plant, transported to site and laid by electronic sensor paver including spreading and compacting usign high amplitude tamping bars of paver (initial compaction) further by double drum smooth wheeled vibratory rollers with 80-100 KN static weight to achieve minimum dry density not less than 98% of maximum Dry Density, necessary finishing etc complete all as specified and tolerances to be as per Table 900-1 of MoRTH specifications Road and Bridge work 2013, Complete all as specified and directed by Engineer-in-Charge.
Material & Labour for 10mm thick sand cushion with clean river sand duly clear of residual, organic and deleterious materials spread evenly to uniform thickness laid over DLC layer as specified and directed. (No additionaI amount to be paid for overlap), Complete all as specified and directed by Engineer-in-Charge.
Supplying and laying 400 micron thick HDPE sheet (Virgin Quality) water proof, wrinkle free without puncture having minimum weight 390 gm/Sqm over tack coat/sand cushion as specified in the design with overlap between adjacent strips and at transverse joints as minimum 300mm, Complete all as specified and directed by Engineer-in-Charge.
Material & Labour for Pavement quality concrete (PQC) of minimum 28 days field Flexural strength of 45Kg/ Sqcm or 4 .5 Mpa, aggregate gradation as per Table 3 of IRC 15-2017, coarse aggregate of clean, hard strong, dense, non-porous and durable pieces of crushed stone or gravel, fine aggregates of clean natural sand or crushed stone sand or combination of both using minimum 415 kg/cum of cement with non -circular virgin synthetic fibre of 12-18mm length, specific gravity 1.34 to 1 .39, UV stable, alkali resistant, with equivalent dia 15-40 micron, minimum melting temperature as 240 °C and minimum tensile strength of 300 Mpa and at the rate as specified by the manufacturer. PQC laid, spread and compacted with slip-form paver of minimum 7 .50 Metre width, including curing and tining by Texturing cum Curing Machine. Required surface texturing to be done as specified in Clause - 10. 1. 14 and Table~ 9 of IRC' 15-2017, Complete all as specified and directed by Engineer-in-Charge.
Material & Labour for Forming 25mm width expansion joint in concrete slab for full depth of PQC. Early entry saw and subsequent cutting by using diamond bit cutter of appropriate size. straight and smooth edges. Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil, vegetation and other debris. The join then filled with pre-molded 25mm thick compressible polyethylene closed cell type filler board as specified thereafter application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell, medium density, crossed linked polyethylene foam backup rod of 30mm dia, over filler board and filled with polyurethane based sealant complying with BS 5212, BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) of+/- 30% having minimum 10 year performance guarantee applying masked tape on the edges of joints and removing the masking tape after filling of sealant as per the method specified by the manufacture, Complete all as specified and directed by Engineer-in-Charge.
Material & Labour for Forming dummy/contraction joint with an initial saw cut of 3mm soon after the concrete has set, upto a depth of 1/3rd to 1 /4th the thickness of the slab widening the first saw cut to 6mm and 24mm deep by using diamond bit cutter of appropriate size straight and smooth edges Joint cleaned thoroughly with application of compressed air. Joint shall be made dry, vacuum cleaned and free of dirt, oil vegetation and other debris. Application of two coats of primer with thin brush by forward and backward movement at an interval of 30 minutes before placing the backup rod and pouring the sealant. Placing of closed cell, medium density, crossed linked polyethylene foam backup rod of 8mm dia application of bond breaker tape on top of back up rod for complete width of the joint and filled with polyurethane based sealant complying with BS 521, BS 4254 and EN-141875-2003 with minimum movement accommodation factor (MAF) OF +/- 30% having minimum 10 year performance guarantee applying masked tape on the edges of joints and removing the masking tape after filling of sealant as per the method specified by the manufacturer, Complete all as specified and directed by Engineer-in-Charge.
Supply only polyester triangular fibres as secondary reinforcement in all types of concrete and mortars, Complete all as specified and directed by Engineer-in-Charge.
Excavation over area in hard/dense soil not exceeding 1.50 Metre depth and getting out, complete all as specified and directed by Engineer-in-charge.
Material & Labour for Providing Plain Cement concrete type C-2, 1:3:6 (using 40mm graded stone aggregate) as in foundations, filling and mass concrete PCC in foundation, complete all as specified and directed by Engineer-in-charge.
Formwork to face of wall, Retaining wall and similar work including attached pillasters buttress etc vertical or to batter for rough finished surfaces of concrete, complete all as specified and directed by Engineer-in-charge.
Formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; rough finished flat surfaces not exceeding 200mm thick (Horizontal or sloping), complete all as specified and directed by Engineer-in-charge.
Material & Labour for RCC type B-1 (1:2:4) 20mm graded aggregate in walls or retaining walls, any thickness, size or shape including pilasters, buttresses columns, pillars, boundary pillars and posts (including caps and bases), complete all as specified and directed by Engineer-in-charge.
Material & Labour for Framed work such as grills, gratings, etc. with ends of bars shouldered and/or riveted, or forged into spikes; framed guard bars; barred iron doors ladders; framed balusters; walk ways; railings; framework of water tanks and similar work conforming to Fe.290. Gde-E-165, portions framed and hung as gates, including pintle hinges, stops, hand-made sliding bolts, etc., complete all as specified and directed by Engineer-in-charge.
Material & Labour for preparation surfaces of any description over 10cm width or girth not otherwise described two coat synthetic enamel paint over a coat red oxide, complete all as specified and directed by Engineer-in-charge.
Demolition of brick work or stone/boulder masonry built in cement mortar including all quoins, arches, pillars etc., complete all as specified and directed by Engineer-in-Charge.
Material & Labour for Rendering 10mm thick in Cement Mortar 1:6 on fair faces of brick work or concrete surfaces, finished even and smooth without using extra cement, complete all as specified and directed by Engineer-in-Charge.
Material & Labour for 3mm thick wall care putty in layers and making even and smooth of wall surfaces, complete all as specified and directed by Engineer-in-Charge.
Material & Labour for complete removal of existing treatment by washing down and smoothing old/new walls surfaces including scrapping and applying two coats of oil bound distemper over a coat of primer as per manufacture instruction with smooth roller finish, complete all as specified and directed by Engineer-in-Charge. (Note: - after painting, cleaning of all floors, glass & furniture by own arrangement).
Formwork to rough finished flat sides and soffits of floor or roof beams, beam haunchings, girders, bressummers, lintels, cantilevers, shelves including Supports, overhangs, etc. also splays between floors and beams, etc., complete all as specified and directed by Engineer-in-Charge.
Material & Labour for Providing cement concrete type B-1, 1 : 2 : 4 (using 20mm graded stone aggregate) as in lintels upto 1.5m clear span, cills, steps; seismic and other similar bands, plinth courses, string courses, lacing courses, parapets and railings upto 60 cm in height, copings, kneelers, apex stones, bed plates, the like including weathering, slightly rounded or chamfered angles and throating, complete all as specified and directed by Engineer-in-Charge.
Material & Labour for 12mm thick toughened one way sheet glass exceeding 0.50 sqm in each pane in required sizes, secured in aluminium frame with rubber gasket, joined / sealed with silicon, complete all as specified and directed by Engineer-in-Charge.
Supply & Fixing Stainless steel fancy type glass door handle 250mm long, complete all as specified and directed by Engineer-in-Charge. (Make : Enox or equivalent)
Supply & Fixing Stainless steel turn knob lock for 8 to 12mm thick sheet glass, complete all as specified and directed by Engineer-in-Charge. (Make : Enox or equivalent)
Supply & Fixing Heavy duty suitable for more than 120.00 Kg double action floor spring hydraulically regulated made up of minimum 1.25mm thick aluminium alloy sheet foundation box, main body with stainless steel cover, governing pivot made of brass, other parts made of mild steel heavy duty and fixed including cutting of floor and making good in Cement Mortar 1 : 3, complete all as specified and directed by Engineer-in-Charge.
shree chamunda enterprise (BID ID -3322842)
K B N TRADERS (BID ID -3325821)
Harsh Infrastructure (BID ID -3326025)
JAY BHARAT METAL SUPPLIERS (BID ID -3323723)
JAMNAGAR ELECTRIC AND MACHINERY CO (BID ID -3325672)
BABUBHAI BHIMABHAI PANDAVADRA (BID ID -3323754)
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .