Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
17 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Manager (South West Zone)
Labour work of Labour work of Laying water pipe line under councillor shree budget,m.p mla shree budget and other budget at different location of sarkhej ward swz.(ARC TENDER)
363346
12/2026-27 (45)
Open
Civil - All
Works
Ahmedabad
3 documents required · 3 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
5 Nov 2026
5 Nov 2026
5 Nov 2026
17 Nov 2026
5 Nov 2026
120 days
4 Estimated Cost put to tender Rs.10,00,000.00
5 Earnest Money Deposit Rs.10,000.00/-Demand Draft, Pay order, or Cheque Bank
Guarantee (As per finanance circular No 12/ Dt.22/07/2019) in
favour of Municipal Commissioner, Ahmedabad) To be
submitted as prescribed below. Demand Draft or Bank
Guarantee shall be from Nationalized Bank and valid for
6 (A) Security Deposit: 5 % of Tender Amount
(B) Retention 2 % of the value of work done will be deducted from each RA
bill. It will be released along with release of payment of Final
7 Tender fees Rs.900/- Demand Draft / Pay order infavour of Municipal
(Non refundable) Commissioner, Ahmedabad)
8 Submission of EMD and In separate sealed cover each for EMD and Tender Fees along
Tender Fees with Tender as described in the invitation of tender and
submitted to Assistant Manager (South West zone),
Ahmedabad Municipal Corporation, South West Zone, Zonal
Office", near Shelby hospital, opp. karnavati club, s.g. highway,
jodhpur, Ahmedabad.
9 Tenders issue date Tenders from the website
http://amc.nprocure.com&http://nprocure.com shall be down
10 Last date of receivingTenders. Dt. 17/11/2026 up to 18:00Hrs The tenders received after this
date and time will not be entertained under any circumstances.
11 Date of Opening Dt.18/11/2026 at 17:00 Hrs to Assistant Manager "South West
Zone Office", near Shelby hospital, opp. karnavati club, s.g.
highway, jodhpur,Ahmedabad
12 Mode of sending the Tender Document shall be submitted in sealed envelope systems By
Documents RPAD/ Speed post/ Hand Delivery/ Courier in sealed covers as
described in submission of the tender.
13 Terms, Condition, & Specification All general condition of contract of Form B1 condition of
contract shall be applicable.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to reject any or all the tenders
without assigning any reasons thereof.
Contractor's Signature Add. City Engineer
& Stamp (South West Zone)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldhmuJtmœl - œrûtKvrùbÍtul
œrûtK vrùb Ítul ÍtuljytuVem,
fKtoJ<e ¾jc le mtbu, stu^vwh, ybœtJtœ.
œrûtK vrùb Ítul xuLzh ltuxem lk- 12/2026-27 btkytJhe juJtguj ftbtule ÂJd<tu
1. Wvhtuf<xuLzhtusu<u JdobtkbtLghSMx[uNl ^htJ<t ftuLx[tfxh©eytuyChJt.
2. xuLzhlerlg<xuLzhVe<&t R.yub.ze. ck^ fJhbtkWvhltmhltbuÁcÁ/hSMxhyu.ze./MvezvtuMx/
fwhegh&erlg<mbgbtkbtufjJtlthnuNu.
3. ftuLx[tfxh©eytuyuxuLzhlemt&uBGþrlrmvjbtLghSMx[uNlle/ dJobuLxhSMx[uNlleftuve, (xuLzhftuve<&t
yLgvwhtJtmt&u) yawfmtbujfhJtlehnuNuylufJhWvhxuLzhlkch<&t ftuLxufxlkchsYhMvМNtoJJtltu
hnuNu.ck^fJhWvhxuLzhltuxemlkch, xuLzhlkch, ftblwkltb<&t, ftuLx[[tfxhlemkM&tlwkltb<&t
ftuLxufxlkchyJ~gœNtoJJtlthnuNu. suftuLx[tfxh©eytuyuhSMx[uNlheLgwfhtJuj l ntug<u
ftuLx[tfxh©eyuxuLzhChJtlnek.
4. ftuLx[tfxhtuyuxuLzhbtcukflwltb, Ft<t lkch, btRfhlkchylumhltbwMvÐyûthtubtkjFJw.
5. xuLzhVe vu ytuzoh / zebtLzz[tVx&eaqfJJtlehnuNu. œhufxuLzhœeXyjdxuLzhVeChJtlehnuNu.
6. ytuAehfblexuLzhVe, R.yub.ze. fuxuLzhVe, R.yub.ze. ÂJltltxuLzhtuhœct<j (fuLmj) dKtNu.
7. xuLzhmt&uBþfJtbtkytJ<e yluoMxble, xuLzhlehfblt 1% «btKucukfduhLxe / zebtLzz[tVx / vu ytuzoh /
jtufjbtRfhauf&e s MJefthJtbtkytJNu. œhufxuLzhœeXyjdR.yub.ze. ChJtlehnuNu. R.yub.ze.
hfbYt.yuffhtuzmw^eleykœtS<hfbltftbbtxuhtufzt, jtufjbtRfh auf, rzbtLzz[tVx, vu
ytuzohfucukfduhkxeltMJYvbtk<&t Yt.yuffhtuz&eWvhleykœtS<hfbltftbbtxuR.yub.ze.lehfbbtºtrzbtLzz[tVx, vu
ytuzohfuckufduhkxeltMJYvbtkytvJtlehnuNu.
8. cukfduhuLxebtºtybœtJtœNnuhle s MJefthJtbtkytJNu.
9. xuLzhVe<&t R.yub.ze.lehfbltze.ze./ auflevtA¤ ftuLx[tfxh©eyuvtu<tlemkM&tlwkltb<&t
btuctRjlkchyJ~gjFJtltuhnuNu.
10. Nh<e xuLzhtuhœct<j dKtNu.
11. stuxuLzhbtkMvÐWÕjuFfhtgujntug<tuatubtmtlufthKu Ft<tfegMËaltyLJgußgthußgthuftbck^ htFJtLþk&tg<u
mbgluftbleBþÆ<btkbshuytvJtbtkytJNu. vhkðþytyLJguftuECtJJ^thtuytvJtbtkytJNulne. suleltuk^
>hufxuLzhhujuJe.
12. xuuLzhtuftuEvKfthKytÃgtrmJtgMJefthJtfu lrnkMJefthJt<ulemkÃËKom•ttBGþrlrmvjfrbNlh©elehnuNu.
13. xuLzhbtkstu ftuRmwDthtJDthtntug<tu<u ykdu xuLzhCh<t vnujtAuÕjuœJmurlg<JucmtRxy&JtfauheyusYhe<vtmfhelu
s xuLzhbtufjJw.
14. mefgtuhexezevtuÍex/ vVtuboLmduhuLxelehfbYt.yuffhtuzmwDeleykœtS<hfbltftbbtxuhtufzt, jtufjbtRfh auf,
rzbtLz z[tVx, vu ytuzohfucukfduhkxeltMJYvbtk<&t Yt.yuffhtuz&eWvhleykœtS<hfbltftbbtxumefgtuhexezevtuÍex/
vhVtuboLmduhkxelehfbbtºtrzbtLz z[tVx, vu ytuzohfuckufduhkxeltMJYvbtkytvJtlehnuNu.
15. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle
mne mefft fhe mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
16. mœh xuLzhle ytRxbtult CtJtu ltKt Ft<t lt mhfgwjh lk.38, <t.21/11/22 <&t mûtb m•ttle b¤uj bkswhe bwsc
GST rmJtg dKºtebtk juJtbt ytJuj <&t «Jo<btl rlgb bwsc GST awfJJt vtºt &Nu su&e <btb cezomu <u bwsc
dK<he fhe xuLzhtu ChJtlt hnuNu.
17. mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk vJo<btl <btb rlgbtu/mhfgwjhtu jtdw vzNu <ubs JF<tu JF<<h
mw^thtytu vK jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt hnuNu.
18. me.me.yth.yum.btk ltuk^t<e Vrhgtœ Jtuzoltk Esluh MxtV îtht ftuLx[t¾xh/yusLmelu Jtuxmyuv/xujeVtulef btægb&e y&Jt
YcY juFe<btk ytvJbtk ytJNu.mœh Vhhegtœle ftbdehe yum.yuj.yu.le mbg bgtoœtbtk fhJtle hnuNu.
19. ftbdehe vwKo > ctœ <ult Vtuxtud{tV,mxeoVefux ylu ftbdehe vwKo >le òK yum.yuj.yu.mbg bgtoœtbtk Jtuzolt MxtVlu
20. stu ytvlu ytvuj Vhegtœ yum.yuj.yu.mbg bgtotbtk vwKo lne &tg <tu yt mt&u mtbuj ftuÐf bwscle vulÕxele hfb ytvltk
cejbtk&e Jmwj fhJtbtk ytJNu.
21. ytvlu mtukvJtbtk ytJuj me.me.yth.yum.Vhegtœtultu hevtuxo yXJtzef ^tuhKu rlg< Vtubuoxbtk «btKe< fhe Jtuzo ytuVemu hsw
22. ftuLx[t¾xh îtht yhsœthlu Vtul fgto ctœ mœh Vhegtœ yLg Jtuzo fu yLg zevtxobuLx fu y.Bgw.ftu.lt ftgoûtuºtbtk l ytJ<e ntuE
<ule òK Jtuzo MxtVlu <tðftjef fhJtle hnuNu.
Sr. Department Category Problem SLA Penalty per one
No. Problem per day
1 Engineering Water>> Engineering Inadeqate water or low inflow pressure- Eng 240
2 Engineering Water>> Engineering Leakage in pipe Line- Eng 48
3 Engineering Water>> Engineering Water qulity-polluted water -Eng 24
4 Engineering Water>> Engineering No- water-Eng 240
zebtLz z[tVx / auf “BgwÂlÂmvjfÂb§h©e, ybœtJtœ” ltltbltufZtJJtu.
Add. City Engineer
Contractor's Signature
& Stamp (South West Zone)
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl - œrûtK vrùb Ítul Ítulj ytuVem,
MJ. ©e <w»tth œuNbwF CJl, NuÕce ntuMvexj vtmu, fKtoJ<e ¾jc mtbu,
yum.S. ntRJu, stu^vwh, ybœtJtœ-
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle
òK fgto ctœ 24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou
ylu stuFbu ftbdehe fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe
su <u ftb NY fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg<
mbgbgtoœtbtk vwKo fhJtbtk lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth
vulÕxe fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt
Bgw.frb¹lh©elu hnuNu.
4. Mtœh xuLzh yk<do<lt ftb mkjøl y.Bgw.ftu.btk «J<obtl <btb rlgbtu /mhfgwjhtu jtdw vzNu. <ubs JF<tu
JF< <ht mw^thytu vK jtdw vzNu. sule ltu^ jR xuLzh ChJtlt hnuNu.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
SOUTH WEST ZONE
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition
and Regulation Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour
is employed on the site work, the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the
child labour welfare fund. If the employer refuses to deposit then action will be taken for contempt of Supreme Court
Judgement and also will be prosecuted by concerned authority. Because of the breach of any provision of child labour
prohibition and regulation Act 1986 by the Contractor & Municipal Corporation becomes liable to pay any amount then
the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No.
Date 06--02-97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and
the remaining amount is refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow
other govt.rules.
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain
regarding QUANTITIES.
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The
same shall be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly
signed. These shall form a part of tender. The tenderer shall not add or amend the text of any of the documents except
in so far as may be necessary to comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract
documents. The full consideration shall be given to such addendum or corrigendum or correction before submission
tender duly filled in by the contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or
correction published by A.M.C through its website www.egovamc.com. Tenderes shall verify the number of addendum
issued and enclose the same with the tender documents,failing which the tender shall be liable for rejection and no any
complaint in respect to this shall be entertained under any circumstances.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (South West Zone)
bu.Bgwrl.frb§h©e, ybœtJtœ Bgwrl. ftuvtuhuNllt mhfgwjh lk.-81, <t.26.02.2015 bwsc <btb «fthle
fLmx[fNlle yufxeJexebtk bwÏg ftuLx[tfxh,mc ftuLx[tfxhlt su bswhtu ftbdehe fh<t ntug <u <btb bswhtulwk dwsht<
rcÕzekd yuLz y^h fLmx[fNl Jfombtk hSMx[uNl fhtJJwk VhSgt< Au.
DETAILS OF BANK ACCOUT
1 Contractor's name
3 Telephone/ mobile no.
4 Permanent account no. (PAN no.)
5 Name of the bank
6 Branch name and address
11 Contractor/ supplier's
signature and stamp
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
PERCENTAGE RATE TENDER AND CONTRACT FOR WORKSADDITIONAL INSTRUCTIONS TO PERSONS
1. Competency of Tendered: No contract will be awarded except to responsible bidder capable for
performing the class of work completed. Before the award of the contract, any bidder may be
required to show that he has the necessary facilities, experience, ability and financial resources to
perform the work in satisfactory manner within the time stipulated. Contractor may be required to
furnish the department with the statement as to their experience and their financial status.
2. Tenderer will be deemed to have inspected the site and to have satisfied himself as to the nature of
all works, all existing roads water - way and other means of communication and access to and
from the site of work and the building that may be required for temporary purpose in connection
with the construction, completion and maintenance fo the works and must make his own enquiries
as to work yard, sites, depot and dumps and as to the acquisition of such additional sites and areas
as may be necessary for temporary purpose for constructing, completing and maintaining the
3. Payment: - The tenderer must understand clearly the rates quoted are for completed works and include
all cost due to labour, scaffolding plant, supervision, service work, power, royalties and octroi etc. and
include all extras to cover the cost of night work if an when required. No claim for additional payment
beyond the prices or rates quoted will be entertained and the tender will not be entitled subsequently to
make may claim on the ground of misrepresentation or on the ground that he was supplied with
information given by any person (whether the member is the employee of Engineering Department of
Corporation or not). Any failure on his part to obtain all necessary information for the purpose of making
his tender and filling the several prices and rates therein shall not relieve him from any risks or liabilities
arising out o, or consequent upon the submission of the tender.
4. Tender Forms: - the tenderer must fill up every blank in the form of tender and in the schedule and he
must return the documents sent here with.
5. Erasures: - Persons tendering are informed that no erasures of alternations by them in the text of the
documents sent herewith will be allowed and any such erasures or alternations will be disregarded. If
there is any error in writing no over-writing should be done, the wrong words or a figure should be struck
out and the correct one written above or near it in unambiguous way, each correction should be initialed.
CONTRACTORS TO PLEASE READ THIS CAREFULLY
1. The rate for items must be given in words and figures. Amount of each item mustalso be entered in
columns and the tenderer must strike out grand total of theamount.
columns and the tenderer must strike out grand total of theamount.
2. If the tender is taken in favour of the company, a power of attorney in favourofthe person who may have
signed the tender for the company must accompany thetender.
3. Solvency Certificate of a Bank or a Revenue Officer of an amount upto 20% ofthe tendered cost plus the
amount of works on hand still to be executed will haveto be reduced by the Contractor.
4. Challan for earnest money must accompany the tender. Tenderer may pay earnestmoney in the form of
CROSSED Demand Draft in favour of the MunicipalCommissioner of Municipal Corporation,
Ahmedabad. Earnest money in cash or by cheque shall not be accepted.
5. The Contractor shall have to furnish Income Tax Clearance Certificate beforetender is accepted and
intimate assessment number and ward under which isassessed.
6. Copies of certificate as regards previous experience if any must accompany thetender.
7. Declaration showing all works on hand with the Contractor and the value ofworks that remain to be
executed in each case must accompany tender.
8. All pages should be initial
9. The Contractor should initial all corrections, erasures and over writing.
10. Discrepancies and Adjustment of Errors: Any error in quantity or amount in schedule 'B' showing items
of works to be carried out shall be adjusted in accordance with the following rules :
(a) In the event of a discrepancy between description in words and figures quotedby a tenderer in the
'rates' column, the description in words shall prevail.
(b) In the event of an error occurring in the 'amount' column of the schedule'B' showing items of work, as
a result of wrong multiplication of the unit- rate andquantity, the units - rate shall be regarded as firm
and multiplication shallbe amended on the basis of the rates.
(c) All errors in totaling in amount column and in carry forward totals shall be corrected.
(d) Any rounding off of amounts against 'items' or 'totals' shall be ignored.
11. (i) It any please be noted that tender will be considered as invalid especially, ifthe requirements as per
instruction. No. 1 to 10 above is not complied with beforesubmitting the tender. Also please read
carefully the face-sheet and General Rulesand Directions for the guidance of Contractors of this
(ii) Right is reserved to reject any or all tender (s) without assigning any reason(s)thereof.
10A. The tender will be liable to be rejected out tight if the tenderer has filed intender documents by ball
pen instead in ink.
11. In addition to the above the tender will also be liable to be rejected outright if
(i) The tenderer proposes any alternation in the works specified or in the time allowedfor carrying the
work or any condition or correction made in any code or mode ofschedule 'B' or specifications.
(ii) Any of the page / pages of the tender is / are removed or replaced.
(iii) The tenderer does not initial all corrections, additions or pasted slips.
(iv) He makes any erasure in the tender. And
(v) The tenderer or in the case of a firm, each partner or the person holding thepower of attorney there
of does not sign or the signatures is / are not attested bya witness the tender in the space provided for
12. A certificate of registration as approved Contractor should be attached with the tender.
12A. In respect of the tenders from the Co-operative Society, a solvency,certificate of an amount
equal to 20% of the amount of the work put to tenderwill have to be produced along with the tender
or a certificate regarding theborrowing capacity of the society issued by the Legal Assistant,
DirectorateCottage industries will have to be produced along with the tender.
13. (1) The several documents forming the contract are the essential parts of the contract a requirement
occurring in one is as binding as though occurring in all they are intended to be mutually explanatory
and complementary and to described and provide for a complete work.
(2) In the event of any discrepancy, the several documents forming the contract or in any one document
the following order or precedence should apply:
(a) Dimension and quantities: -
(i) Schedule 'B' of the tender form.
(ii) Specification.
On drawing, figured, dimensions, unless obviously, incorrect will be followed in
preference to scaled dimension.
(b) Description:
(i) Schedule 'B' of the tender form.
(ii) Specifications.
In case of defective description or ambiguity, the Engineer-in-Charge shouldissue further instructions
directing in what manner the work is to be carried out, itbeing understood that the best modern practice
is to be followed. TheContractor should forthwith comply with such instructions.
14. The Contractor should take no advantage of any apparent error or omission in drawings or
specifications and the Engineer-in-Charge shall make such corrections and interpretations as necessary
to fulfill the intent of the plants and specification.
Contractor's Signature Add. City Engineer
& Stamp (South West Zone)
Name Of Work :- Laying water pipe line under councillor shree budget,m.p mla shree budget
and other budget at different location of sarkhej ward swz.
*Special condition of contract for Item_(Providing and laying of interlocking grey paver blocks
unishape of high density 60 mm thick...)mentioned in Technical volume.
● Successful bidder of this tender shall have to purchase 50% of total quantity of paver block from
Amdavad Enviro Projects Pvt. Ltd. The paver blocks shall be as per tender BOQ & tender specifications.
Payment of such 50% Quantity shall be made to Amdabad Enviro Projects Pvt.Ltd. directly by
the successful bidder on mutual agreement of rate between successful bidder & Amdabad Enviro
Projects Pvt. Ltd. AMC shall not be responsible for any kind of dispute between Amdabad Enviro
Projects Pvt. Ltd. & successful bidder or this tender. The successful bidder will be paid by AMC as
per tender BOQ item rate + premium.
● The quality, size, shape, compressive strength & other technical parameter of paver Block shall
be as per IS standards & tender specification and shall be completely successful bidder's responsibility.
● If in case of failure of paver Block or if Paver Block are not as per the standards, the same shall be
rejected. Successful bidder shall remove such failed paver blocks immediately form site and fix new
paver blocks as per standards.
● The successful bidder shall produce a certificate /bill from Amdabad Enviro Projects Pvt. Ltd. showing
quantity of Paver Block which should be minimum 50% of total quantity.
1. All the relevant causes mentioned in the Tender which are related to above clauses shall be read as
mentioned in above AMENDMENT.
2. The above Amendment shall be Part of Tender document & s
hall be bound to Contractor and shall be submitted along with other tender documents with duly
signed and stamped.
Seal and signature of the bidder Additional City Engineer
Date :- AHMEDABAD MUNICIPAL CORPORTION
Tender Fee : Rs 900.00 Date of submission : 17.11.2026 Time: :18:00 Hrs
Earnest Money : Rs. 10,000.00 Date of Opening : 18.11.2026 Time: 17:00 Hrs
Contractor’s Name & Address :
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
SOUTH WEST ZONE
AHEMDABAD MUNICIPAL CORPORATION
SOUTH WEST ZONE
Name of work :- Labour work of Laying water pipe line under councillor shree budget,m.p mla shree
budget and other budget at different location of sarkhej ward swz.
Sr.No QTY Description Rate Per Amount
1 Transporting from AMC store and laying spigot and socket DI pipe
line DI-K-9 pipes of various classes with CI/MS specials of following
diametres. Rate include excavation as per requirement in any soil,
refilling after laying pipe, covering and temptation of carting surplus
earth up to any lead and clearing the site. All jts shall be made tight &
leak free etc. comp.
2 5000.0 Labour charges for collecting specials from Municipal stores loading, 24.00 kg
transporting to the site, laying & fixing C.I specials inclusive of all
jointing material such lead, jute and labour
3 54.8 Labour charges for recovering CI specials from old line by heating the 12.50 kg
old joints by gas / any heating device and recovering the fittings in re-
usable condition and loading, carting, unloading them to nearby
Municipal stores.
4 Labour charges for collecting sluice valves with tail pieces from
Municipal stores loading, transporting to the site, installing and jointing
C.I. sluice valves inclusive of all jointing material like lead, jute Bolts,
nuts, washer, Rubber packing etc. comp
5 Labour charge for cutting of existing C.I./D.I / pipeline for making
branch connection & existing C.I./D.I tee, collar and other specials like
topper etc. if required. The item including excavation dewatering of
trenches and pipe line, cutting of existing pipeline, including carting of
pipe & surplus earth. the work is to be completed in stipulated time
limit is to be completed in stipulated time limit without interruption of
regular water supply. The rate include all necessary precautionary
measures to prevent any lane slide in trench and P/F safety grad
board on road slide. The joint should be made water tight and leak
free etc complete as instruction given by engg in charge
6 Labour charges for repairing of lekage CI/Di pipe line for following dia
different places including necessary excavation manually or by
machinery removing mud dewatering cleaning of pipe and leakafe
portion and repairing by inserting lead wool jute tools required for
inserting lead wool hiring charges of excavators Hydra/crane j.c.b
dewatering set fuel operator cost of lead wool etc complete(including
all material but excluding cost of pipel) (GWSSB SOR 21-22
SECTION 1 G I.NO 2)(page no-74)
7 2.0 Providing & laying cement concrete 1:2:4 (1 cement :2 coarse sand : 4 3581.00 cmt
graded stone aggregates 20 mm nominal size) and curing complete
excluding cost of form work.
8 10.0 Excavation for foundation up to 1.5 tm. depth in all type of hard and 60.00 cmt
soft soil including sorting out stacking of useful material & disposing of
excavated stuff up to 50 tm. lead loose or soft soil, girding, lighting,
fencing the trenches', and pits. (depth measured from GL). Etc. comp.
9 Providing and Making hole for House connection on C.I./D.I. or M.S.
with labour cost. instruction of engg. In charge
1.0 2.0" dia on CI/DI Pipe up to300 mm dia. 3000.00 no
10 Extra rate over item of excavation of earth for excavation of asphalt
pavement of following thickness including demolishing the asphalt
carpet,metal,soilingetc.comp. with stacking the material as directed.
5.0 a) upto0.20 meter thickness (By Manual) 80.00 Smt
5.0 b) 0.20 meter to 0.30 meter (By Breaker Machine including cost of 200.00 Smt
operator, fuel, &transportaionetc complete.
3.0 c) 0.30 meter & above (By Breaker Machine including cost of operator, 350.00 Smt
fuel, &transportaionetc complete.
11 3.0 Providing and operation Honda Pump including fuel charges & 600.00 Shift
operator Charges etc... as directed etc. comp. (Shift for Eight Hour)
(For Each Pump Set)
12 30.0 Providing & Supplying JCB Machine on rental basis in case of 535.71 Hour
emergency situation and break down type work & also during
unavoidable condition as per instruction of Engg. In Charge, rate
includes all nece. Shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store. (No payment
should be allowed for non working condition of machinery and for pipe
line excavation and laying work)
13 25.0 Providing & supp. Raod Breaker. instruction of engg. In charge. 600.00 Hour
14 50.0 Exavation for trial pit for location of existing line including excavation of 250.00 No
any depth including refiling watering etc.comp
15 50.0 Labour charges for doing washout of water pipe line at end including 750.00 No
necessary excavation refilling the pri.allowing the water to flow for
minuties twice or thrice as per site condition during supply hour,
dewatering the pir and plugging with existing wooden butch .etc. comp
.as per instrucion
16 10.0 Job work for checking water pressure on exiting line as per instruction 670.00 No
of enggincharge rate including trial pit making hole of 15 mm dia and
errectingupvc pipe up to 1.5 mt height .pressureguege& on
pekingcompationmemoring of setup by appling pukka
butchcompletedasdirected by engg, encharge.
17 Supplying wooden taper bunches from jungle wood (Like limda,
1.0 (A) 15 Mm dia. to 20 MM dia. 15.00 No
1.0 (B) 25 Mm dia. to 37 MM dia. 20.00 No
5.0 (D) 80 mm dia to 100 mm dia line 350.00 No
18 25.0 Conveyance charge of earth, lime, murrum, building rubbish, manual 140.37 cmt
garbage, sludge, excavated rock, fly ash, aggregate of any kind etc.
comp.up to 5.0 Km. lead
19 50.0 Supplying of Lead as per instruction of engg. In charge 150.00 kg
20 10.0 Supplying of jute ( SpunYarn ) as per instruction of engg. In charge 75.00 kg.
21 1.0 Supplying of Iron Nut Bolt as per instruction of engg. In charge 90.00 kg
22 1.0 Supplying of Rubber Gasket as per instruction of engg. In charge 80.00 kg
23 50.0 Supplying of MS Plate as per instruction of engg. In charge 75.00 kg
24 50.0 Supplying of MS Ring Flange as per instruction of engg. In charge 140.00 kg
25 10.0 Providing , Supplying and using size 15 to 50 mm dia. Pvc mm Pipe 375.00 No
line Up To 1 Mtr.Length.WithMatirials like Pipe, Coupler, Union,
Elbow, TEE, End-Cap, Band, F.T, M.T, Tailpiece, Reducer, M-Seal,
Solution, Excavation per day per ward including Labor and Fitter
ToPreventLeakageetc.As per instuction of Engineer
incharge.Excavation. including Labor and Fitter.
26 5.0 Providing , Supplying and using Of up to 50 mm To 75 mm dia.Pve 425.00 No
Pipe line For Braking Connection Up to 1Mtr Length WithMatirials like
Pipe, Coupler, Union, Elbow, TEE, End-Cap, Band F.T, M.T,
Tailpiece, Reducer, M-Seal, Solution, Excavation per day per ward
including Labor and Fitter To Prevent Leakage etc.As per instuction of
Engineer incharge. Excavation. including Labor and Fitter.
27 Providing, supplying and fixing check nut for sluice valve.
C.I,G.M,M.S or Brass. instruction of engg. In charge
28 Providing , supplying and fixing spindle for Sluicevalve. C.I./
M.S./G.M. or Brass instruction of engg. In charge
29 Supplying, labour for excavation of all types of soil at any depth
including excavation of asphalt pavement of any thickness, demolition
of brick work in CM of any proportion including stacking of serviceable
materials and disposal of unserviceable material etc. comp. as
50.0 Mazdoor(male) at day/night(r&bsor 2023-24,sr.no.1051,codeno.L022) 493.00 no.
50.0 Mazdoor(Female) at day/night(r&bsor 2023- 450.00 no.
24,sr.no.1050,codeno.L021)
24.0 Fitter/makadam/supervisor at day/ night(r&bsor 2023- 640.00 no.
24,sr.no.1043,codeno.L014)
30 20.0 Providing & supplying & Laying diff. dia. Sluice Valves Glen dory 385.00 No
leakage repairing the excavation in any type of soil, refilling, necessary
nuts, bolts etc complete as directed by Engg. in charge.
31 1.0 Hiring and operating the 20 kv 3 phase Electric Generator for 2800.00 Shift
operating desalting machinery and lighting and other requirements
with arranging diesel to run the D.G. set Do As Directed 8 hrs shift (No
payment should be allowed for non working condition of machinery)
32 5.0 Barricading the entire break down or excavated area on rental basis 90.00 Rmt.
using wooden ballies / M.S. angles at max. 2.00 metercentre to centre,
C.G.I. Sheet, reflective paint / Board outside to avoid accident & for
smooth traffic diversion & movement including cautionary board etc.
Item also includes for making temporary sufficient nos of lighting
arrangement throughout the work with necessary required
arrangement. The same shall be removed after completion of work.
(Only for break down work from start to complete)
33 1.0 Supplying Potable Water Tanker Attached with Motorpump to be filled 450.00 Trip
from near byPrivete Vendor Borwell station to AMC. with 30 meter
Delivery Pipe. The tanker should be supplied as & where reuired&
when order placed by Engineer In - Charge The rate includes the fuel
charge, driver's charge etc.complete.
(in words also)
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (South West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. Contractor shall produce the relevant registration certificate of AMC / State Govt /Central Govt.
2. Contractor shall register the work to labour commissioner as per labour act.
3. Contractor shall not sub-let the work without permission of the authority
4. Contractor should have sufficient skilled and unskilled laborers so that he shall start work at
different sites simultaneously. Contractor's having labour force available during festivals shall
only apply. Contractor can not stop the work due to on availably of labour force. In case progress
is delayed, contractor shall be penalized 0.1% of Tender amount per day for work done after time
limit, maximum up to 10% for remaining work.
5. Bitumen rate difference will be paid as per tender conditions, if applicable.
6. Advance payment / machinery advance will not be paid.
7. Payment of running bill will be made as per recent A.M.C. policy in force.
8. No extra payment will be made due to increase of central / state Govt. Taxes. Exluding GST as
per As per circular no 38 Date 21.11.2022of finance department of Ahmedabad Municipal
9. If the work is not completed within time limit the penalty will be recovered from immediate bills
of contractors.
10. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then
contractor shall not claim for any extra rate for non execution of such item, partly/fully.
11. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved"
by the Engineer-in-charge.
12. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
13. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points, or
aspects in the relevant Indian Standards shall be referred to.
14. All measurements and computations, unless otherwise specified, shall be carried out nearest to
the following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
15. The distance, which constitutes lead, shall be determined along the shortest practical route and
not necessarily the route actually taken. The decision of the Engineer-in-charge in this regard
shall be taken as final.
16. Where no lead is specified, it shall mean "all leads"
17. Lift shall be measured from plinth level.
18. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
19. Reference to specifications of materials as made in the detailed specification of the items of
work is in the form of a designation containing the number of the specification of the material
and prefix 'M' e.g. 'M-5'.
20. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or materials
used in the work found defective at a later date.
21. The contract rate of the item of work shall be for the work completed in all respects.
22. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
23. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stone at site of work in a systematic manner. Materials shall be stored in such a manner
as to prevent damage, deterioration or intrusion of foreign matter and to-ensure the
preservation of their quality and fitness for the work.
24. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work within 24 hours.
25. No materials shall be stored prior to, during and after execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
26. All works shall be carried out in workmanlike manners per the best techniques for the particular
27. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient
numbers and in good working condition on the site of the work.
28. The mode, procedure and manner of execution shall be such that it does not cause damage or
over loading of the various components of the structure during execution or after completion of
29. All necessary safety measures and precaution (including those laid down in the various relevant
Indian Standards) shall be taken to ensure the safety of men, materials and machinery on the
works as also of the work itself.
30. The testing charges of all materials shall be borne by the Contractor unless recovery at one
percent towards testing charges is separately made.
31. Time limit is to be considered as per given LOI of different approved estimate of workIn failure
complete of work in Specify time limit liquideddamages fordealy close will be applicable .
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of One Hundred Twenty Calendar days
(120) from opening of price bids.
SECURITY DEPOSIT
Within 10 days of receipt of Acceptance from the Corporation, the successful tender shall furnish
to the Corporation Security Deposit of 5% (five percent) of the contract price cheque or Bank
Guarantee, pay order, or demand draft of Nationalized Banks and Schedule Banks only.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
& STAMP (South West Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be 12 Month Excluding monsoon after the order to start the works. Progress of
work should be in proportion to time limit.
The contractor shall be remain responsible for Workmen’s compensation if any accident. The
contractor shall arrange for barricading at night and arrangement of Pagi at night to direct the traffic. He shall
be responsible for any damage to public. If any incident happen, during the execution of work. In case of
dispute for unseen or overlooked items the decision of the Dy. City Engineer shall be final. The contractor
shall have to give site clean of all rubbish during the work and at the time of completion of work and hand
over the site with final finishing of the work as directed. All the rejected materials shall be removed from site
within 24 hours by contractor at this risk and cost. Debris shall have to cart daily from site.
If any extra item crops up during the progress of work the same shall be carried out by the contractor and he
shall be paid at the rate fixed by Add.C.E. as per the rate analysis based on latest SOR or if item is not
available in SOR than based on current market rates. In case of extra item decision of Add. City Engg. shall
remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the design of the propose work
the contractor shall carry out the same at his quoted rates without charges any extra and the contractor will
have to carry out the works and he will be paid at the rate quoted by him. No claim for extra rate for
subsequent changes in site and design is entertained.
Octroi exemption passes shall not be given for any materials required for the work. Contractor will be fully
responsible for compliance of the various provisions under contract Act. 1970 and the Rules framed the to
The tender for the work shall remain open for a period (120) days from the date of opening of the tenders for
this work and that the tenderer shall not be allowed to withdraw on modify the offer on his own during the
period. If any tenderer withdraw or makes any modifications or addition in the terms and conditions of his
tender not acceptable to the Municipal Corporation the Municipal Corporation shall without prejudice to any
right or remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
If the work is not carried out within the specified time limit. from the date of order to start the work the
penalty of Rs.- ( As per Form - B1) per day of delay shall be recovered from the immediate bills payable to the
contractor. Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be rejected.
iii) In case of tender downloaded from website, tender fee & EMD should be submitted in form of demand
draft or in cash.
iv) Condition of Form - B1 Standard Specification of material & code of practice will be applicable. Form B1
can be is available in website. Specification shall be as per ' R& B Dept. - Govt. of Gujarat booklets of
Building Works & and Road Works Specifications published by Gujarat Book Depot, Sector-21.
CONTRACTOR'S SIGNATURE ADDL.CITY ENGINEER
South West Zone)
Name of work:- Labour work of Laying water pipe line under councillor shree budget,m.p
mla shree budget and other budget at different location of sarkhej ward
DECLARATION FORM
1. I/We hereby declare that I/We have visited the and fully acquainted myself /ourselves with the local
regarding materials, labour and other factors pertaining tothe work before submitting this tender.
2. I/We hereby declare that I/We have carefully studied the conditions of contract,specification and
other tender documents of this work and agree to executethe same accordingly.
Signature of the Contractor
GENERAL RULES AND DIRECTION FOR THE GUIDANCE OFCONTRACTORS:
1. All works proposed to be executed by contract shall be notified in a form ofinvitation to tender
pasted on a board hung up in the Addl. City Engineer and signed bytheAddl. City Engineer.This
form will state the work to be carried out, as well as the date for submittingand opening tenders and
the time allowed for carrying out the work, alsothe amount of earnest money to be deposited with
the tender and the amountof the security deposit to be paid by the successful tenderer and the
percentage, ifany, to be ducted form bills, it will also state whether a refund of quarry fees,royalties,
octroi dues and ground-rent will he granted, copies of thespecifications designs and drawings and
estimated rates, scheduled rates andany other documents required in connection with also be
open for inspectionby Contractors at the office of the Addl. City Engineer during office hours.Where
the works are proposed to be executed according to thespecifications recommended by a
Contractor and approved by a competentauthority on behalf of the Municipal Corporation such
specification with designsand drawings shall form part of the accepted tender.
2. In the event of the tender being submitted by a firm, it must be signed on hisbehalf by a person
holding a power-of-attorney authorising him to do so.
3. Receipts for payments made on account of any work, when executed by firm,shall also be signed
by all the partners, except where the Contractors are describedin their tender as a firm, in which
case the receipt shall be signed in the name ofthe firm by one of the partners or by some other
person having authority to giveeffectual receipt for the firm.
4. Any person who submits a tender, shall fill up the usual printed form includingthe 'column' total
according to estimated quantities, stating at what rate heis willing to undertake each item of the
work, Tenders which purpose anyalteration in the works specified in the said form of invitation to
tender or inthe time allowed for carrying out the work or which contain any otherconditions of any
sort, will liable to rejection.No single tender include more than one work, but Contractors who wish
totender for two or more works, shall submit a separate tender for each. Tenders. shall have the
name and the number of the work (to which they refer) writtenoutside the envelope.
5. The Addl. City Engineer or his duly authorized Assistant shall open tenders in thepresence of any
intending Contractors who have submitted tenders or theirrepresentatives who may be present at
the time and he will enter the amountsof the several tenders in a comparative statement in a
suitable form. In the eventof a tender being accepted, the Contractor, shall thereupon for
thepurpose of identification, sign copies of the specifications and other documentsmentioned in this
tender in the event of a tender being accepted the contractor,shall thereupon for the purpose of
indification, sign copies of thespecifications and other documents mentioned in this tender in the
event of atender being rejected, the Municipal Commissioner shall authorise the officerconcerned
to refund the amount of the earnest money deposited to theContractor making the tender on his
giving a receipt for the return of the money.
6. The officer competent the dispose of the tenders shall have the right ofrejecting all or any of the
7. No receipt for any payment alleged to have been made by a Contractor in regardto any matter
relating to this tender or the contract shall be valid and bindingon Municipal Corporation unless it is
signed by the Addl. City Engineer.
8. The memorandum of work to be tendered for any schedule of materials tothe supplied by the
Municipal Corporation and their rates shall be filled inand completed by the office of the Addl. City
Engineer before the tender form is issued.If a form issued to an intending tenders has not been so
filled in andcompleted, he shall request the said office to have this done before he completesand
delivers his tender.
9. All works shall be measured not be standard measure and according to the rulesand customs of
the Municipal Corporation without reference to any local custom.
10. Under no circumstances shall any Contractor be entitled to claim enhanced ratesfor any item in this
11. Every Contractor shall, unless exempted in writing by the Addl. City Engineer concerned, produce
along with this tender, a solvency certificate of his financialstability from the collector of the District
within which he resides or a Bank's hiscertificate. If he fails to produce such a certificate his tender
will not beconsidered.
12. All corrections and additions or pasted slips should be initialed.
13. All measurement of work will be taken according to the usual method in use inthe Municipal
Corporation and as per I.S. code for general practice and noproposals to adopt alternative methods
will be accepted. The Addl. City Engineer'sdecision as to what is 'the usual method in use in the
Municipal Corporation' willbe final.
14. The Contractor shall have to attach to his tender, Income-Tax Clearancecertificate to be obtained
from the Income-Tax Officer.
15. The Contractor will have to construct a shed for a storing controlled and valuablematerials issued
to him under schedule A' of the agreement at work-site havingdouble locking arrangement. The
materials will then be taken for use in thepresence of the Departmental person. No. Material will be
allowed to be removedform the site of work.
16. No foreign exchange will be released by the Department for the purpose of plantand machinery
required for the execution of the work contracted for.
17. Controlled materials (Essentially Certificate)
(i) As regards controlled materials, the MunicipalCorporation will help toarrange for the permit
as far as possible and help the Contractor insecuring the same. All incidental charges met
with in procuringthese materials shall be borne by the Contractor himself. Though
theMunicipal Corporation will help to arrange for the permit as far aspossible and help the
Contractor in obtaining materials, it shall notaccept any responsibility for any delay or loss
on account of delaycaused to the contractor while obtaining the same.
(ii) The contractor shall submit to.Addl. City Engineer on close of everycalendar month, the
monthly returns in the prescribed forms as to thereceipts and actual use of the controlled
materials during the month.
(iii) The Contractor shall permit the Addl. City Engineer or his representativesto inspect the
stock of the controlled materials stored by him at anytime whenever the Addl. City
Engineer or his representative(s) so desier(s).
18. The tender for the work shall remain open for a period of (120 days) from thedate of opening of the
tenders for this work and the tenderer shall not beallowed to withdraw of modify the offer on his
own during this period. Ifany tenderer withdraws or marks any modifications or additions in the
termsand conditions of his tender, not acceptable to the MunicipalCorporation, then Municipal
Corporation shall, without prejudice to any rightor remedy, be at liberty to forfeit in full the said
19. The Contractor shall employ only such labour that shall produce a validcertificate of having been
vaccinated against small - pox within a period of lastthree years.
TENDER FOR WORKS.
I/We hereby tender for the execution forthe * In Figures as well in words.
Municipal Corporation of Ahmedabad(herein
before and herein after referred toas
'Corporation') of the work specified inthe under
written memorandum within thetime specified in
such memorandum at *
…………………………………... Percent below /
above the estimated rates specifiedschedule 'B'
(memorandum showing itemof works to be
carried out) and inaccordance in all respects with
thespecifications, designs, drawings
andinstructions in writing referred to in thistender
and in Clause 13 of the annexedconditions of
contract and agree thatwhen materials for the
work are providedby Corporation, such materials
and therates to be paid for them shall be
asprovided in schedule 'A' hereto.
(a) General Description.Repairing water pipeline (a) If several sub works are included theshould be
leakages work,handling pollutions and other detailed in a separate list. Theamount of earnest
maintenance work at different places of Vejalpur Ward money to bedeposited shall be in accordance
in South West Zone. withinstruction no.
(b) Estimate Cost: Rs.10,00,000.00
(c) Earnest Money: 1% of the estimated amount
of tendered work. Rs.10,0000.00
(D) SECURITY DEPOSIT
(i) 5% of the contract value cost paid in cash if the contract value is less than Rs. 5000/-
(ii) (a) 1% of the estimated cost paid as earnest money along with the tender.
(b) Security Deposit is equal to 5% of the sectioned tender cost in form DD or BankGuarantee.
(iii) Bank Guarantee from a Nationalized Bank or Bank approved by the MunicipalCorporation for
an amount equal to 5% of sectioned tender cost
Note – 1. All work shall be carried out as per Public Works Department Handbook andother specifications
of Ahmedabad Municipal Corporation or as directed.
Note – 2. Rates quoted include clearance of site (prior of commencement of work and atits close) in all
respects and hold good for work under all condition, site moistureweatheretc
Contractor's Signature Add. City Engineer
& Stamp (South West Zone)
SPECIFICATIONS OF MATERIALS
This section gives detail specifications for mainly used materials, for other materials refer Building
Specifications. For materials relevant specification of Building Specification shall apply.
TECHNICALSPECIFICATIONS
Name of Work : Labour work of Laying water pipe line under councillor shree
budget,m.p mla shree budget and other budget at different location of
sarkhej ward swz.
Item No : 1 Transporting from A.M.C. store and laying spigot & socket D.I. pipe line including
jointing material with tyton joint. Rate include excavation as per requirement in any
soil, refilling after laying pipe line, watering and temptation & carting surpus earth
up to any lead & clearing the site. All joint shall be made water tight and leak free
Water pipeline (DI)
(A) 100 mm dia DI Pipe
(B) 150 mm dia DI Pipe
(C) 200 mm dia DI Pipe
(D) 250 mm dia DI Pipe
(E) 300 mm dia DI Pipe
The work shall be carried out as per the relevant specifications & directions of Engineer-in-
charge. Contractor has to make all safety precaution during laying of pipeline.
Mode of Measurement
The mode of measurement & payment will be on Rmt. basis.
Item No :2 Labour charges for collecting specials from Municipal stores loading, transporting to the
site, laying & fixing C.I specials inclusive of all jointing material such lead, jute and
This Specification covers the requirements for collecting from Municipal Stores or contractor’s
stack yard transportation of cast to work sites lying jointing and field testing of cast iron pipes
and fittings for the water distribution Network.
APPLICABLE CODES:
Various operations such as transport to work sites lowering in trenches laying jointing and field
testing of cast iron pipes and fittings shall comply with all currently applicable standards. In all
cases the latest revision of the standards shall be referred to. If requirements of this
specification conflict with the requirements of the standards this specification shall grove.
(a) IS: 638 Specification for sheet rubber jointing and rubber inserting jointing.
(b) IS: 782 Specification for caulking lead.
(c) IS: 1538 Specification for cast ion fittings for Pressure pipes for water gas and sewage.
(d) IS: 3114 Code of practice for laying of cast-iron.
(e) IS: 3400 Methods of test for vulcanized rubber (Parts to 20)
(f) IS: 5382 Specification for rubber sealing ring for Gas mains water and sewers.
(g) IS: 6587 Specification for spun hemp yarn.
CARTING AND HANDLING:
Cast iron pipes fittings (specials) and valves with tail pieces shall be transported from the
Municipal Stores or contractor’s stack yard to the work sites at places along the alignment of
pipeline as directed by Owner /Engineer. The Contractor shall be responsible for the safety of
pipes fitting and vales with tail pieces in transit loading/unloading. Every care shall be exercised
in handling pipes and fittings to avoid damage. While unloading the pipes and fittings shall with
steadying ropes of by any other means. Padding shall be provided between coated pipes fittings
and skids to avoid damage to the coating Suitable gape between pipes should be lift at intervals
in order to permit access from one side to the other. In case of spigot socket pipes care should
be taken regarding orientations pipes while unloading. As far as possible pipes shall be ulna
added on one side of the stretch only. The pipes shall be checked for any visible damage (such
as broken edges cracking or spelling of pipe) while undo adding and shall be sorted out for
reclamation any pipe which shows sufficient damage to preclude it from being used shall be
discarded shall be prohibited. Necessary warning boards and lamps should be provided in front
and side of pipes to avoid any accident. Pipes should be stacked with sufficient packing to
prevent rolling of the same. Contractor will be fully responsible for any accident due to pipes or
other materials stacked on site of yard. Contractor will be fully responsible for any legal
formalities arising due to such accident and all legal charges there of shall be paid by contractor
of will be recovered from his running bill of the same or other AMC works.
Each stack of pipes shall contain only pipes of same class and size, with consignment or batch
number marked on it with particulars of supplies wherever possible storage shall be done on
film level and clan ground and wedges shall be provided at the bottom layer to keep the stack
stable. The stack shall be in pyramid shape or the laid lengthwise and crosswise in altimeter
layers. The pyramid stack shall be made for smaller diameter pipes for conserving space in
storing them. The height of the stock shall not exceed 1.5m. Fitting and sluice valves with tail
pieces shall be stacked under cover and separated from pipes. Rubber rings shall be stored in
clean cool store away from windows boiler electrical equipment and petrol oils or other
chemicals particularly in the field where the rubber nods are being used it is desirable that they
are left out on the ground in the sun or overmuch under heavy frost of snow conditions.
LAYING - GENERAL
The Contractor shall visit the before tendering and get himself acquainted site condition and the
regulations regarding the laying of pipes in congested areas heavy traffics areas etc. The
successful bidder shall take the necessary permission and clearance of all the authorities like
dip ardent of ads traffic water supply and the drainage electricity broad telephone comp any etc.
Wherever necessary.
Road reinstatement shall not be included in back filling unless specified.
To protect person from injury and to avoid damage to property adequate barricades construction
signs red lanterns and guards as required shall be placed and mainlined during the progress of
the construction work and unit it is safe for the traffics to use the roadways. The relevant Indian
standards and the rules and regulations of the local authorities in regarded to safety provisions
shall be observed.
General lighting for works site, warning lights, sign boards, fencing etc. shall be provided by
contractor at his own cost.
Suitable fencing shall be provided along the sides of trenches and pits. The post of the fencing
shall be of timber securely fixed in the ground not more then 3m.apart and they shall be less
than 75 mm in diameter of less than 1.2 m above the surface of the ground. There shall be two
rails. One near the top of the post and the other about 450 mm. above the ground and each
shall be from 50mmto 70mm in diameter and sufficiently long to run from post to post which they
shall be bound with strong rope. The method of projecting rails beyond the posts and tying them
together where they meet will not be allowed on any account. All along the edges of the
excavated trenches a bank of earth about 1.2. m high shall be formed as required by the
Owner/Engineer for further protection. The above work shall not be paid for separately and the
contractor shall take into account the costs of such works and quote accordingly.
Whole work shall do within 24 hrs. By parts or whole work so that water supply from AMC shall
not be disturbed.
The excavation in the foundation shall be carried out in true and level and shall have the width
and depth as required and as directed. The Contractor shall provide necessary slopes to a safe
angle or steps as required or directed at his own cost No extra payment shall be made for such
precautionary measures taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely as directed by removing excess soil and watering as required.
No earth filling will be allowed for bringing it to level if by mistake or any other reason excavation
is made deeper or wider than as directed. The extra depth or width shall be made up with
concrete of the same proportion as specified for the foundation concrete at the cost of the
contractor. The excavation up to any required depth shall be carried out under this item as
required and directed by engineer in charge.
Surface Excavation for Road Work:
Excavation exceeding 1.5 mm in width and 10 sq mm on plan but not exceeding 30 cm in depth
in all kinds of soil which are specified shall be as treated as surface excavation.
Excavation in trenches for service lines- Water supply and Drainage:
Excavation in trenches shall be carried out in any material encountered on the site to enable the
service lines to be laid to the lines and levels shown and as directed. Excavation shall be made
with adequate and stable side slopes or shoring strutting if necessary. The contractor shall
provide all measures to protect adjoining properties service limes etc. The contractor shall take
necessary action to keep excavation free from water.
Trenches shall be wide enough to provide sufficient space for joining and inspection. The trench
bed shall be trimmed and rammed with sprinkling of sand or murmur so that the pipes when laid
to the required levels and gradients shall be no the bottom fully supported along the entire
length of the pipe. The trench shall be deepened and widened locally to receive the sockets and
to permit the joint to be made and inspected.
Before excavation is started rails shall be erected at convenient places and at all changes of
direction and gradients at a definite and as far as practicable uniform height above the proposed
invert level of the pipes the center lime being clearly marked on each horizontal rail. The depth
of excavation and level of the pipe invert shall be checked by means of benching road of
appropriate lengths.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used for filling the trenches and plinth or
leveling the ground in layers including ramming and watering etc. complete. The Contractor
shall remove the balance of the excavated from the site of work to a place as directed within a
lead unto 50mm and for all lift.
Filing of Trenches:
As soon as the work in foundation has been completed and measured the sides of foundation
shall be cleared of all dedans brick bats mortar dropping etc. and filled with earth in layers not
exceeding 15 cm each layer shall be adequately watered rammed well and consolidated before
the succeeding layer is laid. The earth shall be rammed with iron rammers where feasible and
with the butt ends in layer of crowbars where rammer cannot be used. The plinth shall be
similarly filled with earth in layers not exceeding 15 cm adequately watered and consolidated by
ramming with iron or wooden rammers. When filling reaches finished level the surface shall be
flooded with water for at least 24 hours and allowed to dry and then rammed and consolidated.
The finished level of filing shall be kept to shape and gradient intended to receive any floor
finish. The excavated stuff of the selected type only shall be allowed to be used for filling the
trenches and plinths. Under no circumstances black cotton soil shall be used for filling the
FILLING MATERIALS:
Filling materials may be either excavated stuff of selected materials brought from outside.
Excavated stuff or selected earth to be used shall be cleared of all rubbish large size stones
brick bats etc. complete and big clods shall be broken down to a size of 50 mm or less. The
selected soil and or murmur or any other materials shall be got approved before filling.
Refilling shall be done in a systematic manner by the contractor before refilling starts, the
contractor shall get checked the trenches ready for refilling.
The space between foundation masonry concrete pipe line and the sides of excavation and/or
bottom of found at ion shall be refilled to the original surface or up to plinth level with earth or
selected materials in layers of 15 cm to 20 cm each well watered and rammed.
Each layer shall be watered and compacted with heavy rammer before the upper layer is laid till
the final level is reached to form a thoroughly compacted base.
Refilling on top of pipe shall be carried out carefully with selected soft stuff out of the excavated
stuff. The refilling shall be raised about 5 cams. For subsequent settlements.
The contractor shall be responsible for any settlement during passage of time of during
monsoon and the same shall be refilled with stuff brought from the out side if necessary.
The process of refilling brunches in plinth watering ramming shall be carried out in such a way
as not to danger to pipe line for foundation footing plinth well etc. already laid or built up.
If watering is not done by contractor with its own arrange meant watering charges at 20% of this
item rate shall be deducted from the bill against this item.
The rubber ring shall be stored in a cool dark dry and dust free environment The storage shall
not be exposed to direct sunlight or any heat radiating appliance. The rings shall not be allowed
to come in contact with any fuels and shall be stored free of tension.
Rubber rings shall be clearly labeled in bundles to indicate the type of ring. The size of pipes for
which they are to be used the manufacturer’s name or trademark and the month and the year of
The rings shall comply with IS 5382 regarding their material finish tolerance in dimension and
physical requirement.
The rubber rings shall be such that they shall not show any signs of deterioration for any reason
during the contract period plus the defects liability period, Entire expenses associated with
correcting defects in this regard including replacement of rubber rings shall be fully borne by the
In jointing cast iron spigot and socket pipes and fitting with tycoon flexible joints the contractor
shall take into account the manufacturer’s recommendations as to the methods and equipment
to be used in assembling the joints. In particular the contractor shall ensure that the spigot end
of the pipe to be jointed is smooth and has been properly chamfered that the rubber ring as per
IS 5382 is correctly positioned in the socket and that the two pipes are accurately in line, before
the joint is maid. The rubber rings and any recommended lubricant shall be obtained only
through the pipe supplier or as directed by the Engineer.
Note: Under special circumstances the Engineer-in-charge may decide the quantities of spun
yarn depending upon the site conditions. The quantity of different diameters of C.L. pipes and
fittings shall be as follows:
Note: The quantities of lead given are provisional and a variation of 20 percent is permissible
Lead shall be heated in a melting pot kept in easy reach of the joint to be poured so that the
molten metal will not be chilled in being carried from the melting pot to the joint and shall be
brought to a proper temperature so that when stirred it will show a rapid change of color. Before
pouring all scum shall be removed. Each joint shall be made with one continuous pour filling of
the entire joint space with solid lead. Spongy or imperfectly filled joints shall be bunt out and
The joint runner shall fit snugly against the face of the socket and the outside of the pipe shall
be dammed with clay to from a pouring lip to provide for filling the joint flush with the face and to
the top of the socket.
The jointed is done by first caulking in spun yam, then filling the remainder of the joint space by
running in molten lead, taking care that no dross enters the joint and then thoroughly caulking
the lead. The spun yam shall be used to center the spigot in the socket and to prevent the flow
of molten lead into the bore of the pipe.
After the lead has been run into the joint the lead shall be thoroughly caulked. Caulking of joints
shall be done after a convenient length of the pipes has been laid and leaded. The leading ring
shall first be removed and any lead outside the socket shall be removed with a flat chisel and
then joint caulked removed with a flat chisel and then the joint caulked around three times with
caulking tools of increasing thickness and hammer of 2 kg. Weight Lead run joints shall be
preferably finished 3 mm behind the socket face. The joints shall not be covered till the pipe line
has been tested under specified hydrostatic test pressure, though the rest of the pipe line
should be covered up to prevent expansion and contraction due to variation in temperature.
Filling available excavated earth (excluding rock) in trenches plinth sides of foundation etc. in
layers not exceeding 20 cams.In depth consolidating each deposited layer by ramming and
The refilling will generally refer to refilling of pipe line trenches, foundation trenches up to plinth
level or ground level with excavated stuff selected soil brought from outside.
Clearing or Trenches or Ground:
The excavated trenches for foundation or ground over which filling is to be done shall be
cleared off all grass loose stones rubbish of all kinds brick bats as well as tress roots etc.
They shall be well watered before stuff is laid.
The work shall be carried out as per therelevantIS specifications & directions of Engineer-in -
Mode of Measurement & Payment
The mode of measurement & payment will be on Kg basis
Item No : 3 Labour charges for recovering CI specials from old line by heating the old joints by gas /
any heating device and recovering the fittings in re-usable condition and loading,
carting, unloading them to nearby Municipal stores.
Labour charges for recovering CI specials from old line by heating the old joints by gas / any
heating device and recovering the fittings in re-usable condition and loading, carting, unloading
them to nearby Municipal stores.
Mode of Measurement & Payment
The mode of measurement & payment will be on Kg basis
Item No : 4 Labour charges for collecting sluice valves with tail pieces from Municipal stores
loading, transporting to the site, installing and jointing C.I. sluice valves inclusive of all
jointing material like lead, jute Bolts, nuts, washer, Rubber packing etc. comp.
Labour charges for collecting sluice valves with tail pieces from Municipal stores loading,
transporting to the site, installing and jointing C.I. sluice valves inclusive of all jointing material
like lead, jute Bolts, nuts, washer, Rubber packing etc. comp.The work shall be carried out as
per therelevant IS specifications & directions of Engineer-in charge.
Mode of Measurement & Payment
The mode of measurement & payment will be on No basis
Item No : 5 Labour charge for cutting of existing C.I./D.I / pipeline for making branch connection &
existing C.I./D.I tee, collar and other specials like topper etc. if required. The item
including excavation dewatering of trenches and pipe line, cutting of existing pipeline,
including carting of pipe & surplus earth.the work is to be completed in stipulated time
limit is to be completed in stipulated time limit without interruption of regular water
supply. The rateinclude all necessary precautionary measures to prevent any lane slide
in trench and P/F safety grad board on road slide. The joint should be made water tight
and leak free etc. complete as instruction given by engg.in charge.
The existing DI / CI pipeline shall be cut by adequate tools so that main pipeline may not get
damaged. The rate also includes bailing out the water from the pipeline till work is completed.
Work is to be carried out within a stipulated time period during day or night as per the
instructions of Engineer-in-charge. The agency should provide all required equipment’s at site of
work for satisfactory completion of work within stipulated time period.The work shall be carried
out as per therelevant IS specifications & directions of Engineer-in charge.
Mode of Measurement
The mode of measurement & payment will be on No. basis.
Item No :6 Labour Charges for repairing the joint leakage in the existing C.I./DI Pipe line with
specials. The rate is including required materials such as jute and lead etc, necessary
excavation in any type of soil, Refilling, necessary thrust blocks etc. comp. as per
instruction of engg. in charge.(Joint reparied under this item should
not be paid in next four months under normal condition)
Labour Charges for repairing the joint leakage in the existing C.I./DI Pipe line with specials. The
rate is including required materials such as jute and lead etc, necessary excavation in any type
of soil, Refilling, necessary thrust blocks etc. comp. as per instruction of engg. in charge.(Joint
reparied under this item should
not be paid in next four months under normal condition)
APPLICABLE CODES:
Various operations such as transport to work sites lowering in trenches laying jointing and field
testing of cast iron pipes and fittings shall comply with all currently applicable standards. In all
cases the latest revision of the standards shall be referred to. If requirements of this
specification conflict with the requirements of the standards this specification shall grove.
(a) IS: 638 Specification for sheet rubber jointing and rubber inserting jointing.
(b) IS: 782 Specification for caulking lead.
(c) IS: 1538 Specification for cast ion fittings for Pressure pipes for water gas and sewage.
(d) IS: 3114 Code of practice for laying of cast-iron.
(e) IS: 3400 Methods of test for vulcanized rubber (Parts to 20)
(f) IS: 5382 Specification for rubber sealing ring for Gas mains water and sewers.
(g) IS: 6587 Specification for spun hemp yarn.
CARTING AND HANDLING:
Cast iron pipes fittings (specials) and valves with tail pieces shall be transported from the
Municipal Stores or contractor’s stack yard to the work sites at places along the alignment of
pipeline as directed by Owner /Engineer. The Contractor shall be responsible for the safety of
pipes fitting and vales with tail pieces in transit loading/unloading. Every care shall be exercised
in handling pipes and fittings to avoid damage. While unloading the pipes and fittings shall with
steadying ropes of by any other means. Padding shall be provided between coated pipes fittings
and skids to avoid damage to the coating Suitable gape between pipes should be lift at intervals
in order to permit access from one side to the other. In case of spigot socket pipes care should
be taken regarding orientations pipes while unloading. As far as possible pipes shall be ulna
added on one side of the stretch only. The pipes shall be checked for any visible damage (such
as broken edges cracking or spelling of pipe) while undo adding and shall be sorted out for
reclamation any pipe which shows sufficient damage to preclude it from being used shall be
discarded shall be prohibited. Necessary warning boards and lamps should be provided in front
and side of pipes to avoid any accident. Pipes should be stacked with sufficient packing to
prevent rolling of the same. Contractor will be fully responsible for any accident due to pipes or
other materials stacked on site of yard. Contractor will be fully responsible for any legal
formalities arising due to such accident and all legal charges there of shall be paid by contractor
of will be recovered from his running bill of the same or other AMC works.
Each stack of pipes shall contain only pipes of same class and size, with consignment or batch
number marked on it with particulars of supplies wherever possible storage shall be done on
film level and clan ground and wedges shall be provided at the bottom layer to keep the stack
stable. The stack shall be in pyramid shape or the laid lengthwise and crosswise in altimeter
layers. The pyramid stack shall be made for smaller diameter pipes for conserving space in
storing them. The height of the stock shall not exceed 1.5m. Fitting and sluice valves with tail
pieces shall be stacked under cover and separated from pipes. Rubber rings shall be stored in
clean cool store away from windows boiler electrical equipment and petrol oils or other
chemicals particularly in the field where the rubber nods are being used it is desirable that they
are left out on the ground in the sun or overmuch under heavy frost of snow conditions.
LAYING - GENERAL
The Contractor shall visit the before tendering and get himself acquainted site condition and the
regulations regarding the laying of pipes in congested areas heavy traffics areas etc. The
successful bidder shall take the necessary permission and clearance of all the authorities like
dip ardent of ads traffic water supply and the drainage electricity broad telephone comp any etc.
Wherever necessary.
Road reinstatement shall not be included in back filling unless specified.
To protect person from injury and to avoid damage to property adequate barricades construction
signs red lanterns and guards as required shall be placed and mainlined during the progress of
the construction work and unit it is safe for the traffics to use the roadways. The relevant Indian
standards and the rules and regulations of the local authorities in regarded to safety provisions
shall be observed.
General lighting for works site, warning lights, sign boards, fencing etc. shall be provided by
contractor at his own cost.
Suitable fencing shall be provided along the sides of trenches and pits. The post of the fencing
shall be of timber securely fixed in the ground not more then 3m.apart and they shall be less
than 75 mm in diameter of less than 1.2 m above the surface of the ground. There shall be two
rails. One near the top of the post and the other about 450 mm. above the ground and each
shall be from 50mmto 70mm in diameter and sufficiently long to run from post to post which they
shall be bound with strong rope. The method of projecting rails beyond the posts and tying them
together where they meet will not be allowed on any account. All along the edges of the
excavated trenches a bank of earth about 1.2. m high shall be formed as required by the
Owner/Engineer for further protection. The above work shall not be paid for separately and the
contractor shall take into account the costs of such works and quote accordingly.
Whole work shall do within 24 hrs. By parts or whole work so that water supply from AMC shall
not be disturbed.
The excavation in the foundation shall be carried out in true and level and shall have the width
and depth as required and as directed. The Contractor shall provide necessary slopes to a safe
angle or steps as required or directed at his own cost No extra payment shall be made for such
precautionary measures taken. The bottom of the excavated area shall be leveled both
longitudinally and transversely as directed by removing excess soil and watering as required.
No earth filling will be allowed for bringing it to level if by mistake or any other reason excavation
is made deeper or wider than as directed. The extra depth or width shall be made up with
concrete of the same proportion as specified for the foundation concrete at the cost of the
contractor. The excavation up to any required depth shall be carried out under this item as
required and directed by engineer in charge.
Surface Excavation for Road Work:
Excavation exceeding 1.5 mm in width and 10 sq mm on plan but not exceeding 30 cm in depth
in all kinds of soil which are specified shall be as treated as surface excavation.
Excavation in trenches for service lines- Water supply and Drainage:
Excavation in trenches shall be carried out in any material encountered on the site to enable the
service lines to be laid to the lines and levels shown and as directed. Excavation shall be made
with adequate and stable side slopes or shoring strutting if necessary. The contractor shall
provide all measures to protect adjoining properties service limes etc. The contractor shall take
necessary action to keep excavation free from water.
Trenches shall be wide enough to provide sufficient space for joining and inspection. The trench
bed shall be trimmed and rammed with sprinkling of sand or murmur so that the pipes when laid
to the required levels and gradients shall be no the bottom fully supported along the entire
length of the pipe. The trench shall be deepened and widened locally to receive the sockets and
to permit the joint to be made and inspected.
Before excavation is started rails shall be erected at convenient places and at all changes of
direction and gradients at a definite and as far as practicable uniform height above the proposed
invert level of the pipes the center lime being clearly marked on each horizontal rail. The depth
of excavation and level of the pipe invert shall be checked by means of benching road of
appropriate lengths.
Disposal of the Excavated Stuff:
The excavated stuff of the selected type shall be used for filling the trenches and plinth or
leveling the ground in layers including ramming and watering etc. complete. The Contractor
shall remove the balance of the excavated from the site of work to a place as directed within a
lead unto 50mm and for all lift.
Filing of Trenches:
As soon as the work in foundation has been completed and measured the sides of foundation
shall be cleared of all dedans brick bats mortar dropping etc. and filled with earth in layers not
exceeding 15 cm each layer shall be adequately watered rammed well and consolidated before
the succeeding layer is laid. The earth shall be rammed with iron rammers where feasible and
with the butt ends in layer of crowbars where rammer cannot be used. The plinth shall be
similarly filled with earth in layers not exceeding 15 cm adequately watered and consolidated by
ramming with iron or wooden rammers. When filling reaches finished level the surface shall be
flooded with water for at least 24 hours and allowed to dry and then rammed and consolidated.
The finished level of filing shall be kept to shape and gradient intended to receive any floor
finish. The excavated stuff of the selected type only shall be allowed to be used for filling the
trenches and plinths. Under no circumstances black cotton soil shall be used for filling the
FILLING MATERIALS:
Filling materials may be either excavated stuff of selected materials brought from outside.
Excavated stuff or selected earth to be used shall be cleared of all rubbish large size stones
brick bats etc. complete and big clods shall be broken down to a size of 50 mm or less. The
selected soil and or murmur or any other materials shall be got approved before filling.
Refilling shall be done in a systematic manner by the contractor before refilling starts, the
contractor shall get checked the trenches ready for refilling.
The space between foundation masonry concrete pipe line and the sides of excavation and/or
bottom of found at ion shall be refilled to the original surface or up to plinth level with earth or
selected materials in layers of 15 cm to 20 cm each well watered and rammed.
Each layer shall be watered and compacted with heavy rammer before the upper layer is laid till
the final level is reached to form a thoroughly compacted base.
Refilling on top of pipe shall be carried out carefully with selected soft stuff out of the excavated
stuff. The refilling shall be raised about 5 cams. For subsequent settlements.
The contractor shall be responsible for any settlement during passage of time of during
monsoon and the same shall be refilled with stuff brought from the out side if necessary.
The process of refilling brunches in plinth watering ramming shall be carried out in such a way
as not to danger to pipe line for foundation footing plinth well etc. already laid or built up.
If watering is not done by contractor with its own arrange meant watering charges at 20% of this
item rate shall be deducted from the bill against this item.
The rubber ring shall be stored in a cool dark dry and dust free environment The storage shall
not be exposed to direct sunlight or any heat radiating appliance. The rings shall not be allowed
to come in contact with any fuels and shall be stored free of tension.
Rubber rings shall be clearly labeled in bundles to indicate the type of ring. The size of pipes for
which they are to be used the manufacturer’s name or trademark and the month and the year of
The rings shall comply with IS 5382 regarding their material finish tolerance in dimension and
physical requirement.
The rubber rings shall be such that they shall not show any signs of deterioration for any reason
during the contract period plus the defects liability period, Entire expenses associated with
correcting defects in this regard including replacement of rubber rings shall be fully borne by the
In jointing cast iron spigot and socket pipes and fitting with tycoon flexible joints the contractor
shall take into account the manufacturer’s recommendations as to the methods and equipment
to be used in assembling the joints. In particular the contractor shall ensure that the spigot end
of the pipe to be jointed is smooth and has been properly chamfered that the rubber ring as per
IS 5382 is correctly positioned in the socket and that the two pipes are accurately in line, before
the joint is maid. The rubber rings and any recommended lubricant shall be obtained only
through the pipe supplier or as directed by the Engineer.
Note: Under special circumstances the Engineer-in-charge may decide the quantities of spun
yarn depending upon the site conditions. The quantity of different diameters of C.L. pipes and
fittings shall be as follows:
Note: The quantities of lead given are provisional and a variation of 20 percent is permissible
Lead shall be heated in a melting pot kept in easy reach of the joint to be poured so that the
molten metal will not be chilled in being carried from the melting pot to the joint and shall be
brought to a proper temperature so that when stirred it will show a rapid change of color. Before
pouring all scum shall be removed. Each joint shall be made with one continuous pour filling of
the entire joint space with solid lead. Spongy or imperfectly filled joints shall be bunt out and
The joint runner shall fit snugly against the face of the socket and the outside of the pipe shall
be dammed with clay to from a pouring lip to provide for filling the joint flush with the face and to
the top of the socket.
The jointed is done by first caulking in spun yam, then filling the remainder of the joint space by
running in molten lead, taking care that no dross enters the joint and then thoroughly caulking
the lead. The spun yam shall be used to center the spigot in the socket and to prevent the flow
of molten lead into the bore of the pipe.
After the lead has been run into the joint the lead shall be thoroughly caulked. Caulking of joints
shall be done after a convenient length of the pipes has been laid and leaded. The leading ring
shall first be removed and any lead outside the socket shall be removed with a flat chisel and
then joint caulked removed with a flat chisel and then the joint caulked around three times with
caulking tools of increasing thickness and hammer of 2 kg. Weight Lead run joints shall be
preferably finished 3 mm behind the socket face. The joints shall not be covered till the pipe line
has been tested under specified hydrostatic test pressure, though the rest of the pipe line
should be covered up to prevent expansion and contraction due to variation in temperature.
Filling available excavated earth (excluding rock) in trenches plinth sides of foundation etc. in
layers not exceeding 20 cams.In depth consolidating each deposited layer by ramming and
The refilling will generally refer to refilling of pipe line trenches, foundation trenches up to plinth
level or ground level with excavated stuff selected soil brought from outside.
Clearing or Trenches or Ground:
The excavated trenches for foundation or ground over which filling is to be done shall be
cleared off all grass loose stones rubbish of all kinds brick bats as well as tress roots etc.
They shall be well watered before stuff is laid.
The work shall be carried out as per therelevant IS specifications & directions of Engineer-in -
Mode of Measurement & Payment
The mode of measurement & payment will be on no. basis
Item No :7 Providing and laying cement concrete work 1:2:4 (1-Cement : 2-Coarse sand :4-graded
stone aggregates 20mm nominal size) and curing complete excluding cost of form work
and reinforcement for reinforced concrete work in (B) Slabs, landing, shelves, Balconis,
Lintels, Beams, Girder sand Cantilever up to floor two level.
Providing and laying cement concrete work 1:2:4 (1-Cement : 2-Coarse sand :4-graded stone
aggregates 20mm nominal size) and curing complete excluding cost of form work and
reinforcement for reinforced concrete work in (B) Slabs, landing, shelves, Balconis, Lintels,
Beams, Girder sand Cantilever up to floor two level.
Item No :8 Excavation for foundation upto 1.5 mt. depth including sorting out and stacking of useful
materials and disposing of the excavated stuff upto 50meter lead.(A)Loose or soft soil
Excavation for foundation upto 1.5 mt. depth including sorting out and stacking of useful
materials and disposing of the excavated stuff upto 50meter lead.(A)Loose or soft soil
Mode of Measurement & Payment
The mode of measurement & payment will be on No basis
Item No :09 Providing and Making hole for House connection on C.I./D.I. or M.S. with labour cost.
Instruction of engg. In charge
Providing and Making hole for House connection on C.I./D.I. or M.S. with labour cost.
Instruction of engg. In charge
Mode of Measurement & Payment
The mode of measurement & payment will be on Hour basis
Item No : 10 Extra rate over item of excavation of earth for excavation of asphalt pavement of
thickness upto 0.20 meter including demolishing the asphalt carpet, metal, soiling
etc.comp. with stacking the material as directed.
Extra rate over item of excavation of earth for excavation of asphalt pavement of thickness upto
0.20 meter including demolishing the asphalt carpet, metal, soiling etc.comp. with stacking the
material as directed..
Item No : 11 Providing and operating Honda Pump including fuel charges & operator Charges etc...
as directed etc. comp. (Shift for Eight Hour) (For Each Pump Set)
Providing and operating Honda Pump including fuel charges & operator Charges etc... as
directed etc. comp. (Shift for Eight Hour) (For Each Pump Set)
Mode of Measurement & Payment
The mode of measurement & payment will be on No basis
Item No : 12 Providing & Supplying JCB Machine on rental basis in case of emergency situation and
break down type work & also during unavoidable condition as per instruction of Engg. In
Charge, rate includes all nece. Shifting, fuel and operating charges and stacking of
useful & non-useful materials separately up to store. (No payment should be allowed for
non working condition of machinery and for pipe line excavation and laying work)
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break
down type work & also during unavoidable condition as per instruction of Engg. In Charge, rate
includes all nece. Shifting, fuel and operating charges and stacking of useful & non-useful
materials separately up to store. (No payment should be allowed for non working condition of
machinery and for pipe line excavation and laying work)
Mode of Measurement & Payment
The mode of measurement & payment will be on Hour basis
Item No : 13 Providing & Operating Road Breaker as per instructions given by engg. In charge.
Providing & Operating Road Breaker as per instructions given by engg. In charge.
Mode of Measurement & Payment
The mode of measurement & payment will be on Hour basis
Item No : 14 Excavation for trial pit for location of existing line including excavation of any depth
including refilling, watering etc.comp
Excavation for trial pit for location of existing line including excavation of any depth including
refilling, watering etc.comp
Mode of measurement:
The mode of measurement & payment will be on No basis
Item No : 15 Labour charges for doing washout of water pipe line at end including necessary
excavation of pit,allowing the water to flow for 15 minutes twice or thrice as per site
condition during supply hour, dewatering the pit and plugging with existing wooden
butch and refilling the pit .etc. comp .as per instruction
Labour charges for doing washout of water pipe line at end including necessary excavation of
pit,allowing the water to flow for 15 minutes twice or thrice as per site condition during supply
hour, dewatering the pit and plugging with existing wooden butch and refilling the pit .etc. comp
.as per instruction
Mode of Measurement & Payment
The mode of measurement & payment will be on No basis
Item No :16 Job work for checking water pressure on exiting line as per instruction of enggincharge.
Rate includesexcavation of trial pit, making hole of 15 mm dia, fixingUPVC pipe up to
mt height, fixing pressuregauge. After gauging ,fixing pukka butchfollowed by pecking &
compacting the filled up soil etc completed asdirected by engg,in charge.
Job work for checking water pressure on exiting line as per instruction of enggincharge. Rate
includesexcavation of trial pit, making hole of 15 mm dia, fixingUPVC pipe up to 1.5 mt height,
fixing pressuregauge. After gauging ,fixing pukka butchfollowed by pecking & compacting the
filled up soil etc completed asdirected by engg,in charge.
Mode of Measurement & Payment
The mode of measurement & payment will be on No basis
Item No :17 Supplying wooden taper butches from jungle wood (Like limda, ambo) Etc.comp.
Supplying wooden taper butches from jungle wood (Like limda, ambo) Etc.comp.
(A) 15 Mm dia. to 20 MM dia.
(B) 25 Mm dia. to 37 MM dia.
(D) 80 mm dia to 100 mm dia line
Mode of Measurement & Payment
The mode of measurement & payment will be on No basis.
Item No :18 Conveyance charge of earth, lime, murrum, building rubbish, manual garbage, sludge,
excavated rock, fly ash, aggregate of any kind etc. comp.up to 5.0 Km. lead
Conveyance charge of earth, lime, murrum, building rubbish, manual garbage, sludge,
excavated rock, fly ash, aggregate of any kind etc. comp.up to 5.0 Km. lead
Mode of Measurement & Payment
The mode of measurement & payment will be on cmt basis.
Item No :19 Supplying of Lead as per instruction of engg. In charge
Supplying of Lead as per instruction of engg. In charge
Mode of Measurement & Payment
The mode of measurement & payment will be on kg basis
Item No : 20 Supplying of jute (Spun Yarn) as per instruction of engg. In charge
Supplying of jute (Spun Yarn) as per instruction of engg. In charge
Mode of Measurement & Payment
The mode of measurement & payment will be on kg basis
Item No :21 Supplying of Iron Nut Bolt as per instruction of engg. In charge
Supplying of Iron Nut Bolt as per instruction of engg. In charge
Mode of Measurement & Payment
The mode of measurement & payment will be on Kg basis
Item No : 22 Supplying of Rubber Gasket as per instruction of engg. In charge
Supplying of Rubber Gasket as per instruction of engg. In charge
Mode of Measurement & Payment
The mode of measurement & payment will be on Kg basis
Item No :23 Supplying of MS Plate as per instruction of engg. In charge
Supplying of MS Plate as per instruction of engg. In charge
Mode of Measurement & Payment
The mode of measurement & payment will be on kg basis
Item No :24 Supplying of MS Ring Flange as per instruction of engg. In charge
Supplying of MS Ring Flange as per instruction of engg. In charge
Mode of Measurement & Payment
The mode of measurement & payment will be on kg basis
Item No :25 Providing , Supplying and using size 15 to 50 mm dia. PVC mm Pipe line Up To 1 Mtr.
Length With Materials like Pipe, Coupler, Union, Elbow, TEE, End-Cap, Band, F.T, M.T,
Tailpiece, Reducer, M-Seal, Solution, Excavation per day per ward including Labor and
Fitter to Prevent Leakage etc. and fixing with existing PVC/DI/CI Line. As per instruction
of Engineer incharge. Excavation including Labor and Fitter.
Providing , Supplying and using size 15 to 50 mm dia. PVC mm Pipe line Up To 1 Mtr. Length
With Materials like Pipe, Coupler, Union, Elbow, TEE, End-Cap, Band, F.T, M.T, Tailpiece,
Reducer, M-Seal, Solution, Excavation per day per ward including Labor and Fitter to Prevent
Leakage etc. and fixing with existing PVC/DI/CI Line. As per instruction of Engineer incharge.
Excavation including Labor and Fitter.
Mode of Measurement & Payment
The mode of measurement & payment will be on No. basis
Item No : 26 Providing , Supplying and using Of up to 50 mm To 75 mm dia.PVC Pipe line For
Braking Connection Up to 1Mtr Length With Materials like Pipe, Coupler, Union, Elbow,
TEE, End-Cap, Band F.T, M.T, Tailpiece, Reducer, M-Seal, Solution, Excavation per day
per ward including Labor and Fitter To Prevent Leakage etc.As per instruction of
Engineer incharge. Excavation. Including Labor and Fitter.
Providing , Supplying and using size 15 to 50 mm dia. PVC mm Pipe line Up To 1 Mtr. Length
With Materials like Pipe, Coupler, Union, Elbow, TEE, End-Cap, Band, F.T, M.T, Tailpiece,
Reducer, M-Seal, Solution, Excavation per day per ward including Labor and Fitter to Prevent
Leakage etc. and fixing with existing PVC/DI/CI Line. As per instruction of Engineer incharge.
Excavation including Labor and Fitter.
Mode of Measurement & Payment
Payment shall be as per no.
Item No :27 Providing, supplying and fixing check nut for sluice valve. C.I./ M.S./G.M. or Brass.
Instruction of engg. In charge
Providing, supplying and fixing check nut for sluice valve. C.I./ M.S./G.M. or Brass. Instruction
of engg. In charge
Mode of Measurement & Payment
Payment shall be as per no.
Item No :28 Providing, supplying and fixing spindle for Sluicevalve. C.I./ M.S./G.M. or Brass
instruction of engg. In charge
Providing, supplying and fixing spindle for Sluicevalve. C.I./ M.S./G.M. or Brass instruction of
engg. In charge
Mode of Measurement & Payment
Payment shall be as per no.
Item No :29 Supplying, labour for excavation of all types of soil at any depth including excavation of
asphalt pavement of any thickness, demolition of brick work in CM of any proportion
including stacking of serviceable materials and disposal of unserviceable material etc.
comp. as directed.
Supplying, labour for excavation of all types of soil at any depth including excavation of asphalt
pavement of any thickness, demolition of brick work in CM of any proportion including stacking
of serviceable materials and disposal of unserviceable material etc. comp. as directed.
Unskilled Labours / Mazdoor at day /night
Fitter/Mason/Gas operator at day / Night
Makadam/ Supervisor at day / Night
Mode of Measurement & Payment
Payment shall be as per no.
Item No :30 Providing & supplying & Laying diff. dia. Sluice Valves Glendory leakage repairing the
excavation in any type of soil, refilling, necessary nuts, bolts etc complete as directed by
Engg. in charge.
Providing & supplying & Laying diff. dia. Sluice Valves Glendory leakage repairing the
excavation in any type of soil, refilling, necessary nuts, bolts etc complete as directed by Engg.
Mode of Measurement & Payment
Payment shall be as per no.
Item No :31 Hiring and operating the 20 kv 3 phase Electric Generator for operating desalting
machinery and lighting and other requirements with arranging diesel to run the D.G. set
Do As Directed 8 hrs shift (No payment should be allowed for non working condition of
Hiring and operating the 20 kv 3 phase Electric Generator for operating desalting machinery
and lighting and other requirements with arranging diesel to run the D.G. set Do As Directed
hrs shift (No payment should be allowed for non working condition of machinery)
Mode of Measurement & Payment
Payment shall be as per no.
Item No :32 Barricading the entire break down or excavated area on rental basis using wooden
ballies / M.S.angles at max. 2.00 metercentre to centre, C.G.I. Sheet, reflective paint /
Board outside to avoid accident & for smooth traffic diversion & movement including
cautionary board etc. Item also includes for making temporary sufficient nos of lighting
arrangement throughout the work with necessary required arrangement. ..The same
shall be removed after completion of work. (Only for break down work from start to
Barricading the entire break down or excavated area on rental basis using wooden ballies /
M.S.angles at max. 2.00 metercentre to centre, C.G.I. Sheet, reflective paint / Board outside to
avoid accident & for smooth traffic diversion & movement including cautionary board etc. Item
also includes for making temporary sufficient nos of lighting arrangement throughout the work
with necessary required arrangement. ..The same shall be removed after completion of work.
(Only for break down work from start to complete)
Mode of Measurement & Payment
Payment shall be as per no.
Contractor's Signature Add. City Engineer
& Stamp (South West Zone)
Tender No :45 Tender Notice No :12/2026-27
PRICE QUOTATION SHEET
Earnest Money Rs. : 10,000.00 Date of Submission of Tender (Hard Copy) : Dt.18/11/2026,Time : 16:00 Hrs.
Tender Fee Rs. : 900.00 Date of Opening of Tender : Dt. 18/11/2026, Time : 17:00 Hrs.
Tender Class : E 2 or Above
Name of Work Labour work of Laying water pipe line under councillor shree budget,m.p mla shree budget and
other budget at different location of sarkhej ward swz.
Estimated Tender Amount Rs. 10,00,000.00/-
I / We am / are willing to carry out work at _______________________________ % above / below* percent (should be written in figuresand
words) of the estimated cost, as mentioned above. Amount of my / our tender works out for Rs.
Note : * Please strike out above or below, whichever is not
Contractor's Signature Add. City Engineer
& Stamp (South West Zone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tender_compressed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .