Tender Value
Refer Docs
EMD Value
₹18.1 L
Closing Date
4 Sept 2026, 3:00 pm
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less: where V= Advertised value of the tender in crores of Rupees. N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
(a)The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender. (b) (1)In case of tenders for composite works (e.g. works involving more than one distinct component, such as Civil Engineering works, S&T works, Electrical works, OHE works etc. and in the case of major bridges - substructure, superstructure etc.), tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of each component of tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of each component of tender, or (iii)One similar work each costing not less than the amount equal to 60% of advertised value of each component of tender. Note for b(1): Separate completed works of minimum required values shall also be considered for fulfillment of technical eligibility criteria for different components. (b)(2)In such cases, what constitutes a component in a composite work shall be clearly pre-defined with estimated tender cost of it, as part of the tender documents without any ambiguity. (b) (3) To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35% value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a work contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway.
Defination of Similar Work :- Any Track works. (Note: -1. Fabrication of Glued joints should be done by RDSO approved manufacturer as per the extant guidelines on the subject. 2. Ballast supply/formation work will not be considered under this item)
11 conditions · 3 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
General Conditions of the Contract (GCC), 2022 is applicable to this contract.
Non-compliance with any of the conditions set forth therein above is liable to result in the tender being rejected.
It shall not be obligatory on the said authority to accept the lowest tender and no tenderer/tenderers shall demand any explanation for the cause of rejection of his/their tender.
If the tenderers deliberately gives/give wrong information in his/their tender or creates/create circumstances for the acceptance of his/their tender, the Railway reserves the right to reject such tender at any stage.
If the tenderer/s expires after the submission of his/their tender or after the acceptance of his tender, the Rly. shall deem such tender as cancelled. If a partner of a firm expires after the submission of their tender or after the acceptance of their tender, the Railway shall deem such tender as cancelled unless the firm retains its character.
Merta Road - Bikaner CTR(P) - 26.581 TKM by Contractor own PQRS/SQRS/track laying Equipment under ADEN/MTD
138of2026-27~NWR
138of2026-27
Open
Works - General
8 Months
Jodhpur, Rajasthan
₹0
₹18.1 L
14 Aug 2026
14 Aug 2026
21 Aug 2026
36 items across 1 schedule · ₹5,09,93,412.98 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Using Soil Class SQ3 | cum | 4520.00 | 227.72 | 10,29,294.4 |
| 2 | In all conditions and classifications of soil except rock | cum | 4520.00 | 107.39 | 4,85,402.8 |
| 3 | Up to 40 m long rail panel | RM | 4000.00 | 9.8 | 39,200 |
| 4 | Lubrication of Elastic Rail Clips on PSC sleepers with contractor's grease, conforming to Railway's specifications, labour etc. complete as per procedure prescribed in latest edition of IRPWM. | ERC | 17650.00 | 3.72 | 65,658 |
| 5 | Rail section of 52Kg and above | Each | 4094.00 | 127.67 | 5,22,680.98 |
| 6 | Under Traffic Block Conditions | Set | 11.00 | 7,900.25 | 86,902.75 |
| 7 | 1 in 12 Turnout (Under Traffic Block) | Set | 10.00 | 37,253.94 | 3,72,539.4 |
| 8 | 1 in 12 Turnout | Set | 10.00 | 46,110.68 | 4,61,106.8 |
| 9 | 1 in 12 Turnouts | Set | 10.00 | 57,876.21 | 5,78,762.1 |
| 10 | For 60 Kg - 90 UTS Rail | Each | 532.00 | 7,179.68 | 38,19,589.76 |
| 11 | Cess repair/widening work as per RDSO Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction using suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment. | cum | 39900.00 | 309.11 | 1,23,33,489 |
| 12 | For sleeper density of 1660 sleepers per km | TRM | 2000.00 | 299.09 | 5,98,180 |
| 13 | 1 in 12 PSC layout | Set | 10.00 | 15,946.88 | 1,59,468.8 |
| 14 | PSC Sleeper track - Maximum slew up to 50mm | TRM | 5316.00 | 134.34 | 7,14,151.44 |
| 15 | PSC Sleeper track - Maximum slew more than 50mm and up to 100mm | TRM | 5316.00 | 169.39 | 9,00,477.24 |
| 16 | Replacing existing glued joint rail with cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately. | Each | 213.00 | 1,929.81 | 4,11,049.53 |
| 17 | Level crossing with asphalted surface | Sqm | 1330.00 | 406.25 | 5,40,312.5 |
| 18 | Level crossing with CC block surface | Sqm | 1330.00 | 350.76 | 4,66,510.8 |
| 19 | 60 Kg - 110/90 UTS - Outside Track | Each | 425.00 | 219.76 | 93,398 |
| 20 | 60 Kg - 110/90 UTS - On Running Line | Each | 1064.00 | 280.99 | 2,98,973.36 |
| 21 | Outside Track | Each | 2550.00 | 50.01 | 1,27,525.5 |
| 22 | On Running Line | Each | 6380.00 | 67.23 | 4,28,927.4 |
| 23 | I n Wagon where mechanical handling is possible a n d traffic block is not required or in Truck/trailer. | MT | 157.00 | 123.98 | 19,464.86 |
| 24 | For lead up to 500m | MT | 3190.00 | 463.74 | 14,79,330.6 |
| 25 | For lead beyond 500 metre and up to 1 Km | MT | 3190.00 | 675.16 | 21,53,760.4 |
| 26 | I n Wagon where mechanical handling is possible a n d traffic block is not required or in Truck / trailer | MT | 13735.00 | 95.87 | 13,16,774.45 |
| 27 | I n Wagon where mechanical handling is possible a n d traffic block is required. | MT | 230.00 | 155.31 | 35,721.3 |
| 28 | Lead beyond 100 Km and up to 150 Km | MT | 171.00 | 990.6 | 1,69,392.6 |
| 29 | Extra for every Km per MT beyond 150 Km over item no. 172047 | MT-Km | 25650.00 | 3.29 | 84,388.5 |
| 30 | Lead beyond 100 Km and up to 150 Km | MT | 13270.00 | 867.28 | 1,15,08,805.6 |
| 31 | Extra for every Km per MT beyond 150 Km over item no. 172057 | MT-Km | 1990500.00 | 3.29 | 65,48,745 |
| 32 | From Truck / Trailer | MT | 13270.00 | 91.41 | 12,13,010.7 |
| 33 | From Truck / Trailer | MT | 230.00 | 94.08 | 21,638.4 |
| 34 | From Truck / Trailer | MT | 157.00 | 124.13 | 19,488.41 |
| 35 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 1595.00 | 864.02 | 13,78,111.9 |
| 36 | Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for misc. works of handling of material | Hour | 530.00 | 964.49 | 5,11,179.7 |
| Schedule total | ₹5,09,93,412.98 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
FinalSTDWorks12.2.20191.pdf
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.221.pdf
ATTACHMENT
CorrigendumintenderdocumentJU01052023.pdf
ATTACHMENT
ACSno1to6inGCC2022_compressed.pdf
ATTACHMENT
ACS07to10inGCC2022.pdf
ATTACHMENT
ACS1113032026GCC2022.pdf
ATTACHMENT
ClarificationregardingsubmissionofAnnexure-VofGCC.pdf
ATTACHMENT
SeekingclarificationonapplicabilityofGCCCorrectionSlipNo1024-06-20258.pdf
ATTACHMENT
GuidelinesonworkingofcontractorsTLEBoardLetterdt13.07.2026_compressed.pdf GuidelinesonworkingofcontractorsTLE
ATTACHMENT
CTRspecialconditions.pdf
ATTACHMENT
GuidelinesonworkingofcontractorsTLEBoardLetterdt13.07.2026_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].