Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹10.0 L
EMD Value
₹10,000
Closing Date
17 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Add. City Engineer,North Zone
Supplying Bore Operator and Valve Operator in Existing Available Bore in Sarspur Rakhiyal Ward of North Zone.(ARC)
363297
E Tender Notice No. 13 / 2026-27 Tender No. 19
Open
Civil Works
Works
Ahmedabad
4 documents required · 4 mandatory
₹900
Municipal Commissioner, Ahmedabad
₹10,000
5 Nov 2026
5 Nov 2026
5 Nov 2026
17 Nov 2026
5 Nov 2026
120 days
Sr. Department No. of Total Amount
Dt.18.11.2026 Up to 5.00 pm hrs in O/o Asst. Manager (North Zone). The technical bid shall
be opened on Dt.19.11.2026 at 11.00 am hrs. Any change / correction / corrigendum in
respect of above work shall be placed on line. Contractors are requested to see the website
before 24 hours of submission of their tender.
Assistant Manager (North zone), Ahmedabad Municipal Corporation
North Zone Office Building, Memco-Naroda road, Ahmedabad
Deputy Municipal Commissioner
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
"Rajiv Gandhi Bhavan", Memco - Naroda Raod, Ahmedabad-25.
MEMORANDUM OF WORK
Municipal Commissioner invites online e-tenders from interested contractors for
Supplying Bore Operator and Valve Operator in Existing Available Bore in Sarspur Rakhiyal
Ward of North Zone.(ARC)
1 Name of work Supplying Bore Operator and Valve Operator in Existing
Available Bore in Sarspur Rakhiyal Ward of North
2 Time Limit 12 MONTHS
3 Tender Validity Period 90 Days from the date of opening of the tender
For Perticular Estimate Work order will be given for particular work & it should
be completed within stipulated time limit mentioned in
work order. Any kind of delay in work, penalty will be
4 Eligibility Criteria Register class "E2" in Only AMC register No any other
state Govt. or institutions Register are Allowe.
5 Estimated Cost put to Rs.998350/-
6 Tender fees Rs.900/--Demand Draft in favour of Municipal
(Non refundable) Commissioner, Ahmedabad)
7 Earnest Money Deposit Rs.10000.00 (Demand Draft in favor of Municipal
Commissioner, AHMEDABAD/) To be submitted as
prescribed in 8.0 below. Demand Draft shall be from
Nationalized Bank / Scheduled Bank and valid for -180-
days.(As per AMC finance dept. circular No-5 Dt.5/5/07
& F.D. Circular No. 29 Dt. 7/08/2010) & attached
ANNEXURE - 1 Finance dept. circular No - 21 Dt.19/06/20
8 Submission of EMD and In separate sealed cover each for EMD and Tender Fees
Tender Fees along with Tender as described in the invitation of tender
and submitted to Assistant Manager (NORTH zone)
Rajiv Gandhi Bhavan, Memco-Naroda Road,
Ahmedabad To be Submitted Physically As per N.I.T
9 Date of Opening of Technical Bid will be opened online as per N.I.T. in the
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
office of Assistant Manager (North Zone), Rajiv Gandhi
Bhavan, Memco – Naroda Road, Ahmedabad Municipal
Corporation, Ahmedabad
10 Security Deposit 5% of the Sanctioned Tender Amount in form of
Demand Draft.(As per Annexure-I)
11 Mode of sending the Price bid should be submitted by online e-tender only
Tender Documents and Technical bid should be submitted physically also in
sealed envelope systems By RPAD/Speed post/ Hand
Delivery in sealed covers in Duplicate (One Original &
One Duplicate) Each part shall be separately duly sign &
seal by contractor.
12 liquidated damages 0.1% of contract price per day from the date of delay.
Maximum limit of liquidated damages for delay in
completion of work will be 10% of the Contract Price
rounded of to the neared thousand.
13 Deduction of Retention Retention
Money from each RA 1. @ 2% of the value of work done will be deducted
Bill from each RA bill. It will be released along with release
of payment of Final Bill.
14 Place of Arbitration Ahmedabad
15 Language of Arbitration English
16 Amount to be deducted Welfare cess as per act 1996 @ 1 % of bill amount
from each bill for labour
welfare fund (non-
17 Time Permitted to start Whenever a work is allotted by Engineering Staff
parts of Work whether minor or major part there of any amount, the
contractor shall be bound to start the works within
hours so intimation of work. Communication done
telephonically via SMS, via WhatsApp and through
letter/E-mail shall be considered legal and binding for
the same. Failure of comply to start the works in
hours of intimation as above by contractor the contractor
shall be levied penalty of (1)Rs.1000/- per day (for
tenders amounting upto Rs.10Lakhs), (2)Rs.2500 per
day (for tenders amounting above Rs.10 Lakhs and upto
Rs.30 Lakhs), (3)Rs.5000 per day (for all tenders
amounting above Rs.30 Lakhs). Three times failures by
contractor shall make contractor responsible to be black
listed unless and otherwise justified properly in
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
writing/binding within 15 days of last notice of penalty.
18 GST GST will be paid extra by AMC/Authority at prevailing
rate to the Contractor.
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to
reject any or all the tenders without assigning any reasons there of.
(1) vhevºt lk-28 <&t ltKktFt<t vhevºt lk 32 <t.7/7/2017 îtht <t.1/7/2017 vAe cnth vtzJtbt
ytJuj/ytJlth xuLzhbt (bxehegÕm + juch mÃjtg mt&u) G.S.T lt ltuxeVefuNl bwsc G.S.T sgt
jtdw vz<tu ntug ðgt mœhnw ftblt cezhu G.S.T ltuxeVefuNl bwscle yuÃjefucujexe ægtlbt htFe
xuLzhlwk cezekd fhJtlw hnuNu.
(2) ftuLx[t¾xhu fboathe CrJ»g rl^e mkdXl yk<do< vtu{rJzLz Vkz hSMx[uNlle lfj hsw fhJtle
hnuNu.yLg&t <ulu fthKu ftuRvK «¹l WœTCJu <tu <ule sJtcœthe ftuLx[t¾xhle ntuJt ctc<u ftuLx[tfxhu
ltuxtuhtRÍ Yt.100/- MxuBv vuvh Wvh ctknu^he hsw fhJtle hnuNu.
(3) ftuLx[t¾xhu btlleg bwÏgbkkºte yu«uLxem gtuslt ctc<u bnuhctl Bgwrlrmvj frbNlh
mtnuc©elt mhfgwjh lkk-41 <t-09-11-2021 bwsc The Apprentices act,1961 ylÔgu
<uytulwk Employes ltufheœt<t <hefu hSMx[[uNl VhSgt< fhtJe <uytulwk hSMx[[uNlle ftuve hsw fhJtle
Seal and Signature of the Bidder Addi. City Engineer
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Finance dept. circular No – 10 Dt.05/08/2024
Seal and Signature of the Bidder Addi. City Engineer
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
Invitation for Bid (IFB)
1. The AHMEDABAD MUNICIPAL CORPORATION,( here in after called “the Employer”)
invites sealed Tender document from reputed and qualified bidders for the construction of Works
detailed in the Table below:-
Sr. Name of Works Approximate Earnest Money Completion
No. value of works Deposit (Rs.) Period
1 Supplying Bore Operator and Rs.998350.00 Rs.10000.00 12 MONTHS
Valve Operator in Existing
Available Bore in Sarspur
Rakhiyal Ward of North
2. Interested bidders shall download the tender documents from AMC’s website
www.amc.nprocure.com/ www.nprocure.com.
3. Tender (a complete set of bidding document) fee shall be As per N.I.T in the form of Demand
Draft from any Nationalized Bank in favor of MUNICIPAL COMMISSIONER, Ahmedabad,
payable at Ahmedabad, which shall be non refundable. The Details of Tender fees shall be
submit with scan copy at the time of Quoting price bid of the tender and Physically to be
submitted along with technical bid Vol.-1 with other enclosure.
4. All bids must be accompanied by Earnest Money Deposit of the amount specified for the Works
in the above Table payable at Ahmedabad and drawn in favor of MUNICIPAL
COMMISSIONER, Ahmedabad, payable at Ahmedabad,. Earnest Money Deposit will have to
be specified in Clause 2 of Financial Condition.
5. Physical submission must be delivered to Asst. Manager (Admin) North Zone, Rajiv Gandhi
Bhavan, Memco – Naroda Road, Ahmedabad As per N.I.T
6. The Bids will be opened on As per N.I.T at the office of Addi..City Engineer (N/Z) , 1st Floor,
Rajiv Gandhi Bhavan, Ahmedabad Municipal Corporation, Memco-Naroda road, Ahmedabad-
25. in the presence of bidders or their representatives who choose to attend. In the event of the
specified date of bid submission/opening being declared a holiday for the Employer, the bids
shall be received /opened on the next working day at the same place and the same time.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
TERMS & CONDITIONS
( A ) INSTRUCTIONS TO BIDDERS (ITB)
( B ) GENERAL TERMS & CONDITIONS
( C ) FINACIAL TERMS & CONDITIONS
( D ) MAIN CONDITION / FETURES OF THE WORK
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( A ) INSTRUCTIONS TO BIDDERS (ITB)
1. Procedure for Submission of Tender
a).The Bidder should quote the price bid in e- tender form before last date of online submission as per
N.I.T and all other details as asked in the tender.
b).The bidder shall submit the following Tender documents physically in hard copy in two separate
envelope (marked as “original” and other marked as “Duplicate”) in schedule time by RPAD/
Speed Post/ Hand Delivery in duplicate. This envelope shall be sealed in an outer envelope. The
Bid envelopes shall be marked as follows:-
Tender Document Vol.
Registration certificate of class
Power of Attorney
Personal Details
Enclosures as asked in tender
Technical specifications duly sign by contractor.
c).The envelope shall be addressed to the Employer at the following address:
Assistant Manager, North Zone,
1st Floor, Rajiv Gandhi Bhavan,
Memco-Norada Road,
d).Bear the following identification:
“TO BE OPENED ONLY IN PRESENCE OF THE EVALUATION COMMITTEE”
e). Indicate the name and address of the bidder.
If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
f).All information has to be typed or hand written legibly. All pages of the Bid have to be initialed
g).ALL INFORMATION HAS TO BE SUBMITTED IN THE PRESCRIBED FORMAT ONLY.
Projects for which incomplete information has been provided will not be considered for
evaluation. The Bidder may attach separate sheets if so required. However, the final bound
document submitted, has to be submitted in vertical A4 size (210 mm X 297 mm) except Form
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2. Assessment of Submission
2.1The Employer will open the physically submitted document of all the bids received for the
package (except those received late) containing the sealed Tender volume and other enclosures
then announce the names of bidders in the presence of bidders or their representatives who
choose to attend on the date and time mentioned in the IFB. In the event of specified date of bid
opening being declared as a holiday for the Employer, the Tender will be opened at the
appointed time and location on the next working day.
2.2 In Physical submission, Bidders detailed and tender fee, E.M.D. shall be opened first. The
Employer at the opening will announce bidder’s names, , the presence/or absence of EMD, the
amount and validity of EMD furnished with each bid, is valid registration and such other
details, as the Employer may consider appropriate.
2.3 The Employer will determine whether the bid is accompanied by the required EMD.
2.4 If the EMD furnished does not conform to the amount and validity period as specified in the
Invitation for Bid and has not been furnished in the form, the bid shall be rejected by the
Employer as non-responsive and the Tender volume will be returned to the bidder.
2.5 Subject to confirmation of the EMD by the issuing bank, the Tender volume accompanied with
valid EMD will be taken up for further evaluation. In case, the Bank does not confirm the EMD,
the bid shall be rejected as non-responsive and no further evaluation carried out.
2.6 The tender volume will further be examined to determine whether the bid has been properly
signed, meets the eligibility and qualification criteria, has the required available bid capacity, is
accompanied by the requisite certificates, undertaking and other relevant information specified
in the bid documents and is substantially responsive to the requirement of the bidding
documents and provides any clarification for ascertaining the correctness of the
information/details.
2.7 The Employer shall prepare besides the record of bid opening, minutes of the Bid opening,
including the information disclosed to those present in accordance with Sub Clause 3.2 thereof.
2.8 The bidders or their representatives who are present shall sign attendance sheet evidencing their
2.9 If the Tender volume is not substantially responsive, it will be rejected by the Employer and
will not subsequently be made responsive by correction or modification or withdrawal of the
nonconforming deviation or reservation.
3. Evaluation and Comparison of Tender volume
The Employer will evaluate and compare only those Tender volumes which are determined to
be substantially responsive in accordance with Clause 2 and qualified for award of Contract in
accordance with Clause 5(General Terms and Condition).
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
4. Procedure for Tender Opening
Received copies of tender in physical form with in schedule time, will be open on schedule date
and time. In the event of specified date of bid opening being declared bidders who qualify the
criteria then bidder bid will be considered for opening of price bid.(Following clause no. 5 of
5.1 The Employer will award the Contract to the bidder whose bid has been determined to be
substantially responsive to the bidding documents and who has offered the lowest Evaluated
Bid Price, provided that such bidder has been determined to be (i) eligible in accordance with
the provisions of Clause 3(General Terms and Condition); and (ii) qualified in accordance with
the provisions of Clause 5(General Terms and Condition).
6. Notification of Award
6.1 Prior to expiration of the period of bid validity prescribed by the Employer, the Employer will
notify the successful bidder by cable/fax and confirmed by registered letter that his bid has been
accepted. This letter shall name the sum which the Employer will pay the Contractor in
consideration of the execution, completion and maintenance of the Works by the Contractor as
prescribed by the Contract.
6.2 The notification of award will constitute the formation of the Contract.
7. As per City Engineer Circular (WRM) no. 6 2011/12 DT: 24/06/2011. A successful Bidder
has to deposit security deposit in Demand Draft with in 15 days after receiving letter of
Indent. Time limit of work will commence from the date of issue of work order.
8. Clarification of Bids
8.1 To assist in the examination, evaluation and comparison of bids, the Employer may, at his
discretion, ask any bidder for authentication the correctness of the information/details furnished
by him in his bid. Such request by the Employer and the response by bidder shall be in writing
or by cable/fax.
8.2 Subject to above clause, no bidders shall contact the Employer on any matter relating to his bid
from the time of bid opening to the time contract is awarded.
8.3 Any effort by the bidder to influence the Employer in the Employer’s bid evaluation, bid
comparison or contract award decisions may result in the rejection of his bid.
9.1 Information relating to the examination, clarification, evaluation and comparison of bids and
recommendations for the award of a contract shall not be disclosed to bidders or any other
persons not officially concerned with such process until the award to the successful bidder has
been announced. Any effort by a bidder to influence the Employer's processing of bids or award
decisions may result in the rejection of his bid.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
10.1 The bidder is advised to visit and examine the Site of Works and its surroundings and obtain
for itself on its own responsibility all information that may be necessary for preparing the bid
and entering into a contract for construction of the Works. The costs of visiting the Site shall be
at the bidder’s own expense.
10.2 The bidder and any of its personnel or agents will be granted permission by the Employer to
enter its premises and lands for the purpose of such inspection, but only upon the express
condition that the bidder, its personnel and agents, will release and indemnify the Employer
and its personnel and agents from and against all liability in respect thereof and will be
responsible for death or personal injury, loss of or damage to property and any other loss,
damage, costs and expenses incurred as a result of the inspection.
Seal and Signature of the Bidder Addi.. City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( B ) GENERAL TERMS & CONDITIONS
1. Scope of Bid
1.1 The Ahmedabad Municipal Corporation hereinafter called "the Employer" invites Tender
document for the construction of works (as defined in these documents, hereinafter referred to as
"the Works") detailed in the table given in the IFB.
1.2 The Works consist of:
“Supplying Bore Operator and Valve Operator in Existing Available Bore in Sarspur
Rakhiyal Ward of North Zone.(ARC)
2. Source of Funds
2.1 The expenditure on these Works will be met by AHMEDABAD MUNICIPAL
3. Eligible Bidders
3.1 This invitation for bids is open to bidders who has necessary bid capacity and who meet the
following requirements:
The bidders shall have a registration with State PWD, and/or CPWD for Required class and
or equivalent with specialization in road works. If contractor is not registered with AMC in
the relevant class, on award of contract he shall be required to register himself with AMC
within 3 month's time.
A bidder shall not be under a declaration of ineligibility for corrupt or fraudulent practice.
Bidders shall provide such evidence of their continued eligibility satisfactory to the Employer, as
the Employer shall reasonably request.
4. Eligible Material, Equipment and Services
4.1 At the Employer's request, the bidder having offered the lowest evaluated financial bid may be
required to provide evidence of the origin of materials, equipment, and services to the satisfaction
of the Employer.
4.2 For purposes of Sub Clause 4.1, "origin" means the place where the materials are mined, grown,
produced or manufactured; similarly for equipments and from where the services are provided.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
General information
All individual firms must complete the information in this form. Nationality information shall be
provided for all owner(s) or applicant(s) that are partnership or individually owned firms.
1 Name of firm:
2 Head office address:
3 Local office address (if any):
4 Telephone/ Contact:
5 E-mail address:
6 Place of incorporation/registration:
7 Year of incorporation/registration:
Additional information regarding litigation, debarment, arbitration, etc.
5.3 Disqualification
Even though the Bidders may meet the above criteria, they are subject to be disqualified for any of
the following reasons:
a) Misleading or false representation in the forms, statements and attachments submitted and
included in document.
b) Record of poor performance such as abandoning the work, rescinding of contract for which the
reasons are attributable to the non-performance of the contractor, consistent history of litigation
awarded against the applicant or financial failure due to bankruptcy.
c) Has been identified by the Employer as poor performer in implementation of ongoing AMC
5.4 Debarment/Black listing
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s) for their
misleading or false representations in the forms statements etc. for the period to be decided by the
6. One Bid per Bidder
6.1 Each bidder shall submit only one bid per contract package either by himself or as a partner in a
joint venture. A bidder who submits or participates in more than one bid for a contract package will
be disqualified.
7. Bidding Documents
The bidder is expected to examine carefully the contents of all the above bid documents. Failures to
comply with the requirements of bid documents will be at the bidder's own risk. Pursuant to Clause
16, bids which are not substantially responsive to the requirements of the bidding documents will be
8. Language of Bid
The bid, and all correspondence and documents related to the bid exchanged between the bidder
and the Employer shall be written in the English language. Supporting documents and printed
literature furnished by the bidder may be in another language provided they are accompanied by an
accurate translation of the relevant passages in the English language, in which case, for purposes of
interpretation of the bid, the English translation shall prevail.
9.1. Unless stated otherwise in the bidding documents, the Contract shall be for the whole works as
described in bidding documents, based on the percentage rate amount in the Bill of Quantities
submitted online by the bidder.
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in
9.2. The bidder shall fill (in e-tender) in percentage rate above or below and total amount (both in
figures and words) for overall items of the Works provided in the Bill of Quantities
9.3. All duties, taxes (excluding GST), and other levies payable by the contractor under the
contract, or for any other cause shall be included in the rates, prices and total Bid Price
submitted by the Bidder, except otherwise stated in the Bid document. Any change in prevailing
taxes and duties at the time of bid due date, shall be paid/deducted at actual as per
Employer/Authority/AMC Account department decide. If Employer will not compensate as per
Any change in prevailing taxes and duties and other levies then payable by the contractor under
the contract and any other reasons.
9.4. The percentage rate and bid price quoted by the bidder shall be fixed up to the completion of
work and shall not be subject to adjustment on any account, except where expressly specified,
otherwise, in the contract.
10. Bid Validity
10.1 Bids shall remain valid as per Instruction to Bidders (ITB) after that deadline date for bid
submission specified in Clause. The Employer as non-responsive shall reject a bid valid for a
shorter period.
10.2 In exceptional circumstances, prior to expiry of the original bid validity period, the Employer
may request the bidders to extend the period of validity for a specified additional period. The
request and the responses thereto shall be made in writing or by fax. A bidder may refuse the
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
request without forfeiting his bid security. A bidder agreeing to the request will not be
required or permitted to modify his bid but will be required to extend the validity of his Bid
Security for the period of the extension, and in compliance with Clause 2 ( Financial Terms
& Conditions) in all respects.
11. Format and Signing of Bid
11.1 The bidder shall prepare two copies of the documents comprising the bid as described in
Instructions to Bidders.
11.2 The bid shall be typed or written in indelible ink and shall be signed by a person or persons
duly authorized to sign on behalf of the bidder.
11.3 The bid shall contain no alterations, omissions or additions, except those to comply with
instructions issued by the Employer, or as necessary to correct errors made by the bidder, in
which case the person or persons signing the bid shall initial all such corrections.
11.4 All witnesses and sureties shall be persons of status and probity and their full names,
Occupations and addresses shall be printed below their signatures.
12. Deadline for Submission of Bids
Bids must be received by the Employer at the address specified above not later than the time and
date specified in the IFB.
Any bid received by the Employer after the deadline for submission of bids will be returned
unopened to the bidder.
14. Signing of Agreement
At the same time that the Employer notifies the successful bidder that his bid has been accepted, the
Employer will direct him to submit the Performance Security and attend the Employer's office on a
date determined by the Employer for signing the Form of Agreement.
15. The selection process will lay high emphasis on the ability and competency of contractors to do
high quality work within the given time schedule.
16. The onus of providing, all necessary company / project related information, in appropriate
manner and medium, so as to demonstrate the competency of the bidder and to allow proper
evaluation, will rest entirely on the Bidder.
17. All clause shall be operative from the date of issue of work order and up to the expiry of
original and extended time limit.
18. Legal Condition:-
Corrupt or Fraudulent Practices
The Employer will reject a proposal for award if he determines that the Bidder recommended
for award has engaged in corrupt or fraudulent practices in competing for the contract in
question. The Employer will declare the firm ineligible, either indefinitely or for a stated period
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
of time, to be awarded a contract by AHMEDABAD MUNICIPAL CORPORATION if it at
any time determines that the firm has engaged in corrupt or fraudulent practices in competing
for the contract, or during execution.
“corrupt practice” means behavior on the part of officials in the public or private
sectors by which they improperly and unlawfully enrich themselves and/or those close
to them, or induce others to do so, by misusing the position in which they are placed,
and it includes the offering, giving, receiving, or soliciting of anything of value to
influence the action of any such official in the procurement process or in contract
“fraudulent practice” means a misrepresentation of facts in order to influence a
Procurement process or the execution of a contract to the detriment of the Borrower,
and includes collusive practice among bidders (prior to or after bid submission)
designed to establish bid prices at artificial non-competitive levels and to deprive the
Borrower of the benefits of free and open competition.
Municipal Commissioner reserves the rights to reduce/increase the scope of work and contract
without assigning any reason thereof.
If Ahmedabad Municipal Corporation is convinced that the Bidder has resorted to material
misrepresentation or provided fraudulent information / statement, the said Bidder will be liable
for disqualification / rejection at any stage.
Proof for fulfillment of eligibility criteria should be submitted along with Tender volume. If the
Tender volume is submitted without valid documents and without proof of eligibility criteria it
will be rejected.
Those who do not meet with the eligibility criteria need not submit the Tender document.
Tenders, which do not fulfill all or any of condition or are submitted incomplete in any respect
or are conditional tenders, will be rejected.
Contractor shall be responsible to obey all Labour Laws, Environmental and Safety Laws.(the
existing laws as well as framed from time to time). Any penalties laid due to violation of such
laws shall be directly deducted from the contractor's outstanding.
All necessary safety measures and precaution (including those laid down in the various relevant Indian
Standards) shall be taken to ensure the safety of men, materials and machinery on the works as also of
the work itself.
19. Administrative Conditions:-
Safety and Signage
Contractor has to arrange for the complete safety of the persons working for project, users of the
road i.e. public and vehicles also. All the arrangements of traffic drums, metal / fiber cones,
traffic blinkers, traffic signs as per design, safety tapes etc. to be arranged at site. Necessary
florescent marking on traffic signs to be provided so that it should be visible at night. During
night working hours safety in charge personnel shall be provided with florescent jackets.
The Contractor has to make all the necessary arrangements for making all the temporary
diversions for proper working at site including traffic signages, safety cones, traffic
blinkers, barricading tapes, red and green flags etc for making easy smooth and safe
conditions for the traffic. The Contractor shall and must provide above at his own cost.
Liaison with local authority for electrical connections for the AMC
The contractor is responsible for liaison with local authority for change in supply connection or
new connection on behalf of AMC. It includes filling the necessary application to power Supply
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Company, follow up and getting the supply, filling the necessary test reports to the power
supply company. All official fees including security deposits and other expenses shall be of
initially paid by the contractor.
Contractor shall not sub-let the work without permission of the authority.
Seal and Signature of the Bidder Addi.. City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
TERMS & CONDITION
( C ) FINACIAL CONDITION
1. Cost and Currencies of Bidding
The bidder shall bear all costs associated with the preparation and submission of his bid and the
Employer will in no case be responsible or liable for those costs.
Currencies of Bid and Payment
The rates and the prices shall be quoted by the bidder entirely in Indian Rupees
All payments including advances, if any, shall be made in Indian Rupees.
2. Earnest Money Deposit :-
2.1 Contractor shall have to deposit Earnest Money deposit with tender.
2.2 Bank guarantees (and other instruments having fixed validity) issued as surety for the bid shall
be valid for 28 days beyond the validity of the bid.
2.3 The EMD of the unsuccessful bidders, except for L1, L2 and L3 bidders, will be returned as
promptly as possible as but not later than 28 days after the expiration of the period of bid validity.
2.4 The EMD of the successful bidder, along with second and third lowest tenders, will be returned
when the bidder has furnished the required performance security and signed
2.5 Earnest Money Deposit may be forfeited
a) if the bidder withdraws his bid during the period of bid validity;
b) in the case of a successful bidder, if the bidder fails within the specified time limit to
i) furnish the required Performance Security or
ii) sign the Agreement.
3. (A) Security Deposit :-
Within 15 (Fifteen) days of the date of receipt of the Letter of Acceptance, the successful
bidder shall deliver to the Employer, a Initial Security Deposit in the form of a Bank
Guarantee for an amount equivalent to 5% (five percent) of the Contract Price.
(B) Retention :-
a).Retention @ 2% of the value of work done will be deducted from each RA bill. It will be
released along with release of payment of Final Bill.
4. Approved Bank: - As per AMC Finance dept. circular No - 21 Dt.19/06/20
5. No advance for machinery or materials will be given.
6. Mobilization advance will not be given.
7. Quantities in B.O.Q. may vary up to permissible limits as per prevailing norms of AMC and
contractor shall not claim any extra rate for the same.
8. No rate difference will be paid for due to any increase in rate of any item due to any reason what so ever.
9. No price escalation / advance payment / machinery advance will be paid.
10. Payment of running bill will be made as per recent A.M.C. policy in force.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
11. No extra payment will be made due to increase of central / state Govt. Taxes.
12. If the work is not completed within time limit the penalty will be recovered from immediate bills of
13. If the material i.e. MH cover C.C block etc. supplied from Municipal Corporation store then contractor
shall not claim for any extra rate for non execution of such item, partly/fully.
14. The contract rate of the item of work shall be for the work completed in all respects.
15. The testing charges of all materials shall be borne by the Contractor unless recovery at one percent
towards testing charges is separately made.
16. In case of extra item, rate shall be finalized as per prevailing norms and condition of AMC
and payment shall be made accordingly.
17. Tax, Duties on Materials
All charge on account of Octroi, excise duties, terminal tax, GST/sales tax and Govt. duties/tax
etc. on material procured for the works from any source shall be borne by the contractor. No(P)
or “C” or “D” form shall be supplied by the AMC for this purpose. GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
18. If the contractor fails to execute the said works within prescribed time limit, the said work
will be carried out at the risk and cost by other contractors with 15 % supervision charges as
may be decided by the Addi. City Engineer (North Zone).
19. Water, Electricity Contractor shall have to make his own arrangements for water and
electricity for the purpose of construction work at site at his own expense.
Special Clause:
As per construction works welfare cess Act – 1996 non-refundable one percent of tender
amount shall be deducted against works welfare cess.
Seal and Signature of the Bidder Addi.. City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
Tender form B-1
FORM B-1 OF GUJARAT STATE ROADS AND BUILDING DEPARTMENT /
WATER RESOURCES DEPARTMENT may be referred.(only English version)
Note binding on the contractors
01. The terms and conditions of contract mentioned in the Clause no 1 to 77 of Form B-1 of
Gujarat State Road and Building Department / Water Resources Department shall be
applicable. Binding on the contractors unless specifically mentioned about it hereunder in
clause no.15 to
02. Please read “Ahmedabad Municipal Corporation “instead of “Government / Government of
Gujarat “wherever written.
03. Please read “ Ahmedabad Municipal Corporation “ instead of “ Government of Gujarat State
Public Works Department/Public Works Department/ Government “ wherever written.
04. Please read “City Engineer" instead of “Superintending Engineer “or Executive Engineer
wherever written.
05. “Ahmedabad Municipal Corporation “herein called as “AMC “
06. “Governor for the state of Gujarat “shall be read as “Municipal Commissioner / Ahmedabad
Municipal Corporation”
07. The contents / details / information mentioned in the relevant point under the heading
08. The contents / details / information mentioned in the relevant point under the heading
“NOTICE INVITING TENDERS” may be read as under-
Point No 1 may be read as: Tenders are invited by Municipal Commissioner ,AMC for the work of
Supplying Bore Operator and Valve Operator in Existing Available Bore in
Sarspur Rakhiyal Ward of North Zone.(ARC)
. OF AHMEDABAD CITY Point No.3 : The class of contractor shall be as per
Memorandum of Works in Brief.
The Cl. No. 14.2, 21, 38, 60, 69, 73, 74, 75 shall be read as deleted.
09. The contents / details / information mentioned in the relevant point under the heading
“ADDITIONAL INSTRUCTIONS TO PERSONS TENDERING” shall be read as
Point No .2.1 may be read as per the details mentioned in the tender notice
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
10. DECLARATION FORM & DECLARATION CERTIFICATE if given separately in
Tender Document and it shall be applicable.
11. TENDER FOR WORKS to be read as given in tender documents / Tender Form.
12. MEMORANDUM to be read as per the details given in tender notice
13. The contents / details / information mentioned in the following CLAUSE under the
heading “TERMS AND CONDITION OF CONTRACT” shall be read as under-
Clause 1: Security Deposit: to be read as per the details given separately
elsewhere in the tender documents.
Clause 2: Liquidated Damages for delay: to be read as per the details given
separately elsewhere in the tender documents.
Seal and Signature of the Bidder Addi.. City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL TECHNICAL CONDITION
1. Contractor shall register the work to labour commissioner as per labour act.
2. Contractor shall not sub-let the work without permission of the authority.
3. In the specifications, "as directed"/"Approved" shall be taken to mean, "as directed"/approved" by
the Engineer-in-charge.
4. Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to mean
as a reference to the latest edition of the same in force on the date of agreement.
5. In "Mode of Measurement" in the specifications wherever a dispute arises in the absence of specific
mention of a particular point or aspect, the provisions on these particular points, or aspects in the
relevant Indian Standards shall be referred to.
6. All measurements and computations, unless otherwise specified, shall be carried out nearest to the
following limits:
(i) Length, width and depth (height)------- 0.01 Meter.
(ii) Areas -----0.01 Sq. Mt.
(iii) Cubic Contents ------0.01 Cu.Mt.
7. The distance, which constitutes lead, shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall be
taken as final.
8. Where no lead is specified, it shall mean "all leads"
9. Lift shall be measured from plinth level.
10. Definite particulars covered in the items of work, through not mentioned or elucidated in it,
specifications shall be deemed to be included there in.
11. Reference to specifications of materials as made in the detailed specification o f the items of work is
in the form of a designation containing the number of the specification of the material and prefix 'M'
12. Approval to the samples of various materials given by the Engineer-in-charge shall not absolve the
contractor from the responsibility of replacing defective material brought on site or materials used in
the work found defective at a later date.
13. No collection of materials shall be made before it is got approved from the Engineer-in-charge.
14. Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stone at site of work in a systematic manner. Materials shall be stored in such a manner as to
prevent damage, deterioration or intrusion of foreign matter and to-ensure the preservation of their
quality and fitness for the work.
15. Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from the
site of work within 24 hours.
16. No materials shall be stored prior to, during and after execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
17. All works shall be carried out in workmanlike manners per the best techniques for the particular
18. All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
19. The mode, procedure and manner of execution shall be such that it does not cause damage or over
loading of the various components of the structure during execution or after completion of the
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
INSTRUCTION TO TENDERERS
TENDER VALIDITY PERIOD:
The tender shall be kept valid for acceptance for a period of Ninety Calendar days (90)
from opening of price bids.
SECURITY DEPOSIT
Within 15 days of receipt of Intent from the Corporation, the successful tender shall furnish to the
Corporation Security Deposit of 5% (five percent) of the contract price cheque or Bank Guarantee, pay
order, or demand draft of Nationalized Banks and Schedule Banks approved by AMC only.
Seal and Signature of the Bidder Addi.. City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
GENERAL CONDITION
1. After sanction of tender a Letter of Intent shall be issued to contractor and in response to
that letter, contractor shall have to arrange for Security Deposit within 15 days. If S.D is
given within 10days of issuance of Letter of Intent, time limit shall be counted from that
date. If S.D is given after 15 days of issuance of letter of intent, contractor shall be penalized
as per prevailing norms and condition of AMC and shall be deducted from contractor’s bill. In
this case time limit shall start latest by the 10th day of letter of intent, Security Deposit of
5% of tender amount shall be deposited by pay order, demand draft, cheque of nationalized
bank /scheduled bank by pay order, demand draft, cheque of nationalized bank/scheduled
bank only. Contractor shall have to sign contract paper with AMC.
2. In case of earnest money cheque bounce back, contractor’s tender shall treated as cancelled
and the contractor shall not be given any tender, offer, quotation work in AMC for one year.
3. Conditional tender shall not be accepted.
4. Tender validity period is 90 days from the date of opening of tender.
5. Muni. Commissioner shall have right to accept, reject the tender as well as the rate at which
tender to be accepted and awarded.
6. Specification of tender items shall be as per PWD manual in general/AMC’s norms and B-1
form conditions shall be applicable. In case of controversy, Add.C.E’s decision shall be
7. Work shall be allotted as per contractors registration class.
8. Contractor shall have to work in such a system that there shall be no damage to any service
line of electric, telephone, gas, any type of service cable ,drainage or water lines etc. In case
of damage to service line, the whole responsibility of accident shall be on contractor’s
shoulder. It will be responsibility of contractor to safe guard the labours against any accident
or damage of lives. In case of police complain, Contractor shall be held responsible for
negligence. In case of soil /land collapse, contractor shall be held responsible for not
supporting the soil suffering with strutting, shuttering Contractor shall safeguard the labour
before allowing the labour to enter in excavated or other site. In case of accident to labours,
contractor shall be held responsible for police complain against him. AMC’s staff shall be
responsible for any accident at the site of the work.
9. Contractor shall take insurance of his all labour. and supervisory staff
10. Only registered contractor shall quote the tender , If the contractor is registered with
government then they shall have to apply to registration in AMC within 90 days from the
date of work order.
11. AMC’S general condition and Form -B-1 shall be binding to the contractor B-1 Form is put
up on AMC’s web site.
12. Payment of running bill , final bill shall be as per policy of AMC in force at time of payment
13. Any time of litigation shall be in court of Ahmedabad city jurisdiction only.
14. As per site conditions/requirement of site, there shall be increase or decrease in tender item
quantities. In such case contractor is bind to execute. Excess and saving in quantity to the
extent of prevailing norms of the AMC. In case of decrease in any tender item quantity,
contractor shall not ask for compensation.
15. If any construction material brought to site by contractor , is not as per specification, or any
inferior quality material brought to site, then such rejected material shall be removed from
the site within 24 hours, otherwise AMC can throw away such material at any place and
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
recover the amount for such removal work from contractor bill. In this case contractor
shall not be entitled for compensation.
16. Cost of testing of material shall be done by the contractor. He shall provide vehicle for
taking material/staff from site to testing laboratory/ manufacturing site and contractor shall
be bear the cost of transportation of staff and material.
17. Contractor shall work as per labour Act. Contractor shall not be given any payment if
labour act rules are not followed or insurance of labour is not taken for work
18. All type of taxes(e.g. sales tax, surcharge, vat etc) to be by the contractor.
19. In case of cancellation/rejection of tender, contractor shall not be entitled for any
compensation Or right
20. During execution of work, contractor shall take safety measures like protection by ropes,
drums, danger sign boards, plastic strips, bamboos, wooden poles etc as per requirement &
instruction of Engg.- in- charge. In case of accident due to lack of protection, contractor
shall responsible for police complains, compensation etc AMC staff shall not be held
responsible for contractors negligency.
21. If instructed by AMC officials, contractor shall have to keep daily progress register and get
is signed by Ass. city Engineer. Contractor shall maintain record of daily No. of labours,
employed, work done, rectification work carried out by contractor after Eng.-in-charge
inspection & the compliance of the same. If such rectification work is not done by
contractor within 24 days the contractor shall be finned Rs. 250/- day of delay & shall be
recovered from the contractors bill.
22. Contractor is not entitled for any type of compensation or right for the cancellation of tender
or tender items by any means.
23. If work is not completed within specified time limit penalty shall be recovered from bills as
per tender condition.
24. Deduction from bills shall be done as per rules prevailing or the rules which shall come in
to force, by State or Central Govt.
25. 1% amount shall be deducted for labour welfare fund as per state Govt order.
26. All above conditions shall over rule the conditions given in Form B-1
27. Befor quoting tender, contractor shall have to take complete information of the work after
seeing site and from the concerned Asst. Engineer or Asst. city engineer.
28. In case of the bank detail are not given then EMD return procedure shall be delayed.
29. Before quoting the tender contractor should know that, he has seen the site & understood the
item of works, site conditions. He should be in a position to provide labours at the time of
festivals like Holi, Diwali, Navratri, Marriage season, rainy season or any other time of the
year Contractor can not say that he has no labours due to festivals.
I have read all above conditions carefully and ready to work as per above conditions.
Seal and Signature of the Bidder Addi.. City Engineer
Date: (North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
TECHNICAL SPECIFICATIONS
Name Of Work :- Supplying Bore Operator and Valve Operator in Existing Available
Bore in Sarspur Rakhiyal Ward of North Zone.(ARC)
DETAILS SPECIFICATION OF MATERIAL
Item No. 1 Bore operating as per instrunction by enginer incharge including
clorination, maintain of log book and regular stager water supply from bore diff
8 hrs shift & timing at every society including operating valves of different
societies by stegered system supply at diff.diff.places in ward. Finance circuler
Bore operating as per instrunction by enginer incharge including clorination,
maintain of log book and regular stager water supply from bore diff 8 hrs shift
& timing at every society including operating valves of different societies by
stegered system supply at diff.diff.places in ward. Finance circuler no:-01 dt:-
1.1 Water shall not be salty or brackish and shall be clean reasonably clear and free from
objectionable quantities of silt and tract of oil and injurious alkalis, salts, organic mater and
other deleterious materials which will either weaken the mortar or concrete or cause
efflorescence of attach the steel in R.C.C. Container for transport, storage and handling of
water shall be clean. Water shall conform to the standards specified in I.S. 456-1978.
1.2 If required by the Engineer-in-charge it shall be tested by comparison with distilled water.
Comparison shall be made by means of standard cement tests for soundness, time of setting
and mortar strength as specified in I.S. 269-1976. Any indication of unsoundness, change in
time of setting of 30 minutes either more or decrease of more than 10 percent in strength of
mortar prepared with water sample when compared with the results obtained with
mortar prepared with distilled water shall be sufficient cause for rejection of water
1.3 Water for curing mortar, concrete or masonry should not be too acidic and also not too
alkaline. It shall be free of elements which significantly affect the hydration reaction or
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
otherwise interfere with the hardening of mortar or concrete during curing or those which
produce objectionable stains or other unsightly deposits on concrete or mortar surfaces.
1.4 Hard and bitter water shall not be used for curing.
1.5 Potable water will be generally found suitable for curing mortar for preparing or concrete.
2.1 Cement shall be Sulphate Resistant Cement conforming to IS : 12330, Ordinary portland
cement as per I.S. 269-1976 or Portland slag cement as per I.S.455-1976.
2.2 Testing of Cement : It should be specifically noted that the cement brought by the
contractor at site of work shall be used after the same is tested at the approved laboratory
as per the direction of the Engineer-in-charge. Such approved laboratory may be located at
Ahmedabad. All the charges for transport and testing of the samples shall have to be borne
by the contractor. The frequency of testing of such materials shall be in accordance to the
relevant Indian standard as directed by the Engineer-in-charge.
3.1 Sand shall be natural sand, clean, well graded, hard strong, durable and gritty particles free
from injurious of dust, clay, kankar nodules, soft or flaky particles shale, alkali salts,
organic matter, loam, mica or other deleterious substances and shall be got approved from
the Engineer-in-charge. The sand shall not contain more than 8 percent of silt as determined
by field test. If necessary the sand shall be washed to make it clean.
3.2 COARSE SAND :
The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed 3.0. The
sieve analysis of coarse shall be as under :
I. S. Sieve Percentage by I. S. Sieve Percentage by
Designation weight passing Designation weight passing
sieve through sieve.
3.3 FINE SAND :
The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall be as under
I. S. Sieve Percentage by I. S. Sieve Percentage by
Designation weight passing Designation weight passing
through sieve through sieve.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
2.36 mm 100 300 Micron 5 -
M-4 STONE GRIT :
4.1 Grit shall consist of crushed or broken stone and be hard, strong dense, durable, clean, of
proper gradation and free from skin or coating likely to prevent proper adhesion of mortar.
Grit shall for as possible flaky elongated pieces shall be avoided.
It shall generally comply with the provisions of I. S. 383-1970. Unless special stone of
particular quarried is mentioned. Grit special stone of particular quarries is mentioned. Grit
shall be obtained from the best black trap or equivalent hard stone as approved by the
Engineer - in - charge. The grit shall have no deleterious reaction with cement.
4.2 The grit shall conform to the following gradation as per sieve analysis :
I. S. Sieve Percentage passing I. S. Sieve Percentage Passing
Designation through sieve Designation through sieve
4.3 The crushing strength of grit will be such as to allow the concrete in which it is used to build
up the specified strength of concrete.
4.4 The necessary tests for grit shall be carried out as per the requirements of I. S. 2386 (Parts I
to VIII) 1963, as per instruction of the Engineer-in-charge. The necessity of test will be
decided by the Engineer-in-charge.
M-5A STONE COARSE AGGREGATE FOR NOMINAL MIX CONCRETE :
5A.1 Coarse aggregate shall be of machine crushed stone of black trap or equivalent and be hard,
strong, dense, durable, clean and free from skin and coating likely to prevent proper
adhesion of mortar.
5A.2 The aggregate shall generally be cubical in shape. Unless special stones of particular
quarries are mentioned, Aggregates shall be machine crushed from the best black trap or
equivalent hard stone as approved. Aggregate shall have no deleterious reaction with
cement. The size of the coarse aggregate for plain cement concrete and ordinary reinforced
cement concrete shall generally be as per the table given below. However in case of
reinforcement cement concrete the maximum limit may be restricted to 6 mm less than
the minimum lateral clear distance between bars of 6 mm. less than the cover whichever is
I.S. Sieve Percentage Passing for I.S. Sieve Percentage Passing for
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Designation single sized aggregates Designation single sized aggregates
of nominal size of nominal size
NOTE :- The percentage may be varied by the Engineer-in-charge when considered
necessary for obtaining better density and strength of concrete.
5A.3 The grading test shall be taken in the beginning and at the charge of source of materials. The
necessary tests indicated in I.S. 383-1970 I. S. 456-1978 shall have to be carried out to
ensure the acceptability. The aggregates shall be stored separately and handled in such a
manner as to prevent the inter mixed on different aggregates. If the aggregates are covered
with dust, they shall be washed with water to make them clean.
M-5B BLACK TRAP OR EQUIVALENT HARD STONE COARSE :
5B.1 Aggregate for Design Mix concrete : Coarse aggregate shall be of machine crushed stone of
black trap or equivalent hard stone and be hard, strong, dense, durable clean and free from
skin and coating likely to prevent proper adhesion of mortar.
5B.2 The aggregates shall generally be cubical in shape. Unless special stones of particular
quarries are mentioned, aggregates shall be machine crushed from the best, black trap or
equivalent hard stones as approved. Aggregate shall have no deleterious reaction with
5B.3 The necessary tests indicated in I. S. 383-1970 and I.S.456-1978 shall have to be carried out
to ensure the acceptability of the material.
5B.4 If aggregate is covered with dust it shall be washed with water to make it clean.
M-6 CEMENT MORTAR:
6.1 Water shall conform to specification M-1. Cement shall confirm to specification M-2, sand
shall confirm to M-3.
6.2 Proportion of Mix :
6.2.1 cement and sand shall be mixed to specified proportion, sand being measured by measuring
boxes. The proportion of cement will be by volume on the basis of 50 Kg/bag of cement
being equal to 0.0342 cum. The mortar may be hand mixed or machine mixed as directed.
6.3 Preparation of Mortar:
6.3.1 In hand mixed mortar cement and sand in the specified proportions shall be thoroughly
mixed dry on a clean impervious platform by turning over at least 3 times or more till a
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
homogenous mixture of uniform colour is obtained. Mixing platform shall be so arranged
that no deleterious extraneous material shall get mixed with mortar or mortar shall flow out.
While mixing, the water shall be gradually added and thoroughly mixed to form a stiff
plastic mass of uniform colour so that each particle of sand shall be completely covered with
a film of wet cement. The water cement ratio shall be adopted as directed.
6.3.2 The mortar so prepared shall be used within 30 minutes of adding water. Only such quantity
of mortar shall be prepared as can be used within 30 minutes.
M-7 BRICK BATS AGGREGATE :
7.1 Brick bat aggregate shall be broken from well burnt or slightly over burnt and dense brick. It
shall be homogeneous in texture roughly cubical in shape, clean and free from dirt of any
other foreign material. The brick bats shall be of 40 mm to 50 mm size unless otherwise
specified in the item. The underburnt of overburnt brick bats shall not be allowed.
7.2 The brick bats shall be measured by volume by suitable boxes or as directed.
8.1 The bricks shall be hard or machine moulded and made from suitable soils and kiln burnt.
They shall be free from cracks and flaws and nodules of free lime. The shall have smooth
rectangular faces with sharp corners and shall be of uniform colour.
The bricks shall be moulded with a frog of 100 mm x 40 mm and 10 mm to 20 mm deep
on one of its flat sides. The bricks shall not break when thrown on the ground from a height
8.2 The size of modular bricks shall be 190 mm x 90 mm.
8.3 The size of the conventional bricks shall be as under :
8.4 Only bricks of one standard size shall be used on one work. The following tolerance shall
be permitted in the conventional size adopted in a particular work.
Length : = 1/8" (3.0 mm) Width : = 1/16" (1.50 mm)
Height : = 1/16" (1.50 mm)
8.5 The crushing strength of the bricks shall not be less than 35 Kg/Sq.cm. The average water
absorption shall not be more than 20 percent by weight. Necessary tests for crushing
strength and water absorption etc. shall be carried out as per I.S. 3495 (Part-I to IV) -
M-8A FLY-ASH LIME BRICKS :
The fly ash lime bricks shall conform to Grade-1 or Grade-2 of IS-3812-1981. The frog of
the 80 to 100 mm x 40 mm x 10 to 20 mm size.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
The size of modular bricks shall be 190 mm x 90 mm x 90 mm.
The size of conventional brick shall be 225 mm x 110 mm x 75 mm.
Only bricks of one standard size shall used on one work. The following tolerances shall
permitted in the conventional size adopted in a particular work:
Length : + 3 mm
Height : + 2 mm
The physical characteristic of bricks shall be as follows.
The minimum compressive strength of fly ash lime bricks shall not be less than
Kg/Sq.Cm. and the test shall be conform to IS-3495 (Part-I):1992.
The average drying shrinkage of the brick when tested by the method described in IS 4139-
1989 being shall not exceed 0.15 percent.
The averages water absorption not more than 20 percentage by mass and the test shall
conform to IS-3495 (Part-3):1992.
M-9 MILD STEEL BARS :
9.1 Mild steel bars reinforcement for R.C.C. work shall conform to I.S. 432 ( Part-II ) 1966 and
shall be tested quality. It shall comply with relevant part of I.S.456-1978.
9.2 All the reinforcement shall be clean and free from dirt, paint, grease, mill scale or loose of
thick rust at the time of placing.
9.3 For the purpose of payment the bar shall be measured correct upto 10 mm length and weight
payable worked out the rate specified below :
1. 6 mm 0.22 Kg./Rmt. 8. 20 mm 2.47 Kg./Rmt.
2. 8 mm 0.39 Kg./Rmt. 9. 22 mm 2.98 Kg./Rmt.
3. 10 mm 0.62 Kg./Rmt. 10. 25 mm 3.35 Kg./Rmt.
4. 12 mm 0.89 Kg./Rmt. 11. 28 mm 4.83 Kg./Rmt.
5. 14 mm 1.21 Kg./Rmt. 12. 32 mm 6.31 Kg./Rmt.
6. 16 mm 1.58 Kg./Rmt. 13. 36 mm 7.31 Kg./Rmt.
7. 18 mm 2.00 Kg./Rmt. 14. 40 mm 9.86 Kg./Rmt.
M-10 TMT FE-500 STEEL BARS FOR REINFORCEMENT :
10.1 Reinforcement bars shall conform to IS-432, IS-226 or IS-1786 and welded wire fabrics to
IS : 1566. Only TMT bars for reinforcement in RCC duct shall be used which shall be
clean, free from pitting, oil, grease, paint, loose mill scale, rust, dirty dust or any other such
substance that will destroy or reduce bond.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
It permitted by the Engineer-in-charge reinforcement shall be done in accordance with IS-
2751 or IS-9147 as applicable.
10.2 Other provision and requirements shall conform to specification No. M-7 for mild steel bars.
M-11 MILD STEEL BINDING WIRE :
11.1 The mild steel wire shall be of 1.63 mm or 1.22 mm (16 or 18 gauge) diameter and shall
conform to I.S. 280-1972.
11.2 The use of black wire will be permitted for binding reinforcement bars. It shall be free from
rust, oil paint grease, loose mill scale or any other undesirable coating which may prevent
adhesion of cement mortar.
M-12 STRUCTURE STEEL :
12.1 All structural steel conform to I.S.226 - 1965. The steel shall be free from the defects
mentioned in I.S. 226-1975 and shall have a smooth finish. The material shall be free from
loose mill scale, rust pits or other defects affecting the strength and durability. Rivet bars
shall conform to I.S. 1148-1973.
12.2 When the steel is supplied by the contractor test certificate of the manufacturers shall be
obtained according to I.S. 226-1975 and other relevant Indian Standards.
M-13 SHUTTERING :
13.1 The shuttering shall be either of wooden planking of 30 mm. minimum thickness with or
without steel lining or of steel plates stiffened by steel angles. The shuttering shall be
supported on battens and beams and props of vertical ballies properly cross braced together
so as to make the centering rigid. In places of bullie props, brick pillar of adequate section
built in mud mortar may be used.
13.2 The form work shall be sufficiently strong and shall have camber, so that it assumes correct
shape after deposition of the concrete and shall be able to resist forces caused by vibration
of live load of men working over it and other incidental loads associated with it. The
shuttering shall have smooth and even surface and its joints shall not permit leakage of
13.3 If at any stage of work during or after placing concrete in the structure, the form sags or
bulges out beyond the required shape of the structure, the concrete shall be removed and
work redone with fresh concrete and adequately rigid form work. The complete form work
shall be got inspected by and got approved from the Engineer-in-charge, before the
reinforcement bars are placed in position.
13.4 The props shall consist of bullies having 100 mm minimum diameter measured at mid
length and 80 mm at thin end and shall be placed as per design requirement. These shall rest
squarely on wooden sole plates 40 mm thick and minimum bearing area of 0.10 Sq.m. laid
on sufficiently hard base.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
13.5 Double wedges shall further be provided between the sole plate and the wooden props so as
to facilitate tightening and easing of shuttering without jerking the concrete.
13.6 The timber used in shuttering shall not be so dry as to absorb water from concrete and swell
or bulge nor so wet to shrink after erection. The timber shall be properly sawn and planned
on the sides and the surface coming in contract with concrete. Wooden form work with
metal sheet lining or steel plates stiffened by steel angles shall be permitted.
13.7 As far as practicable, clamps shall be used to hold the forms together and use of nails and
spikes avoided.
13.8 The surface of timber shuttering that would come in contact with concrete shall be well
wetted and coated with soap solution before the concreting is done. Alternatively coat of
raw linseed oil or oil of approved manufacture may be applied in place of soap solution. In
case of steel shuttering either soap solution or raw linseed oil shall be applied after
thoroughly cleaning the surface. Under no circumstances black or burnt oil shall be
13.9 The shuttering for beams and slabs shall have camber of 4 mm per meter (1 in 250) or as
directed by the Engineer-in-charge so as to offset of subsequent deflection for cantilevers
the camber at free end shall be 1/50 of the projected length or as directed by the Engineer-
M-14 HARD DRAWN WIRE :
The Hard drawn steel wire should confirming to IS-432 (Part 2), Hard drawn steel wire shall
be manufacture and its chemical composition should be as per para 3.0. The finished wire
should be free from defects and finished in a workman like manner. Nominal sizes,
Tolerances, Physical requirements are as per IS : 432 (Part-II) latest edition. Hard drawn
steel wire should be tested as specified in IS : 432 (Part-II) latest edition.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D-1 : EXCAVATION
D.1.1 GENERAL :
D.1.1.1 Any soil which generally yields to the application of pickaxes and shovels or
jumpers or scarifies phawaraa rakes or any such excavating implement or organic
soil, gravel, silt, sand, tuff loam, clay, peat etc., fall under this category.
D.1.2 CLEARING OF SITES:
D.1.2.1 The site on which the drain is to be laid as shown on plan and the area required for
setting out and other operation shall be cleared and all obstructions, loose stones and
materials, rubbish of all kinds, stumps, brushwood as well as all trees, shall be
removed as directed. The roots shall be entirely grubbed up.
D.1.2.2 The products of the clearing to be stacked in such a place and in such a manner, as
directed by the Engineer-in-charge.
D.1.2.3 In Jungle clearings, all trees not specially marked for preservation, bamboos,
Junglewood and brushwood shall be cut and their roots grubbed-up. All wood and
material from the clearing shall be the property of Corporation and shall be arranged
as directed the Corporation Engineer or his authorised agent. The materials found to
be usefully by the Engineer will be conveyed and properly stacked as directed within
the specified limit. Useless materials will be burnt or otherwise disposed off as
directed, by the Engineer-in-charge.
D.1.2.4 All holes or hollows, whether originally existing or produced by drawing-up roots,
shall be carefully filled up with earth, well rammed and leveled off, as may be
D.1.3 SETTING OUT :
D.1.3.1 All the centre line of drain trenches shall be given by the Engineer-in-charge and it
will be the responsibility of the contractor to install substantial reference marks,
bench marks etc. and maintain them as long as required true to line, level, curve &
slopes. The contractor shall assume full responsibility for alignment, elevation and
dimensions of each and all parts of the work. The labour, materials etc. required for
setting out and establishing bench marks and other reference marks shall be arranged
by the contractor at his own cost.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.1.4 EXCAVATION :
D.1.4.1 The excavation for the drain trenches shall include removal of all materials of
whatsoever nature and whether wet or dry, necessary for the laying of pipe lines and
sub-structure exactly in accordance with lines, levels, grades and curves shown on
the plans L-sections or as directed by the Engineer-in-charge. Trenches shall be
excavated to the exact width at of lowest portion of the trench and the side slopes as
(1:0.5). The contractor shall notify the Engineer before starting excavation to enable
him to take cross sectional levels for purpose of measurements before the ground is
D.1.4.2 Excavation shall be carried out in stratas specified in item of schedule `B'. The lift
will be also as specified in Schedule `B'. Tunneling in case of laying of deep sewers
in place of open excavation shall be allowed up to 2 metre length with the
permission by the Engineer-in-charge. Contractor shall, as far as possible avoid
tunneling at the joints of pipes. In such case, the levels and gradients of drain to be
laid shall be properly attained and shall be got thoroughly checked by the contractor
through the Engineer-in-charge. Payment of tunneling shall be made as per the rate
for open excavation including dewatering etc. as mentioned in the item
specification. No deduction or extra payment shall be made in case of tunneling.
Excavated material shall be stacked at a minimum distance of 1.5 meters away from
the edge of the trench or as directed. Sight rails and boning rods shall be used for
checking the gradients of bed or trenches. Before the trench excavation is started,
sight rails made of good timber shall fixed truly vertical at a uniform height, above
the invert as per the instruction of the Engineer-in-charge. The centre line shall be
clearly marked on the sight rails. Depth of excavation shall be checked by boning
rods of suitable size and length as per instructions of the Engineer-in-charge. All the
sight rails shall be painted alternatively with two different colours so as to provide
better visibility.
D.1.4.3 The bottom of the trenches shall be leveled both longitudinally and transversely or
stepped as directed by the Engineer. The contractor shall, at his own cost, remove
such portion of boulders or rock, as required to make the bottom of the trench level.
No filling shall be allowed to being the bottom of the trench in level. If by
contractor's mistake, Excavation is made deeper that shown on the plan ordered by
the Engineer, the extra depth stuff duly watered and rammed as directed by the
Engineer as at the cost of the contractor. All rock or other hard foundation shall be
cleared off, all soft and loose material cut to a firm surface, either level, stepped as
directed by the Engineer. The Engineer may order such changes in the dimensions
and elevation of bottom of trenches and may be deemed necessary to secure
satisfactory laying of pipelines. The contractor shall at his own expense, make
provision for all pumping, dredging bailing out of draining water and the trenches
shall be kept free of water, during construction work.
D.1.4.4 After each excavation is completed, the contractor shall notify the Engineer to that
effect and no trench will be allowed to be filled up until the Engineer or his
authorised agent approved the depths and dimensions of excavation and the nature
of the strata met with and the level and/or measurements are recorded.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.1.4.5 The work measured shall be maintained till completion and in case of collapse of
sides or bottom of trenches due to any reasons, it shall be made good without any
D.1.5 PROTECTION :
D.1.5.1 The drain trenches, shall be strongly fenced and red light signals shall be kept at
night in charge of watchmen to prevent accidents. Sufficient care and protective
measure shall be taken to see that the excavation shall not affect or damage the
adjoining structure. The contractor shall be entirely responsible for any injury to
life and damage to the properties etc. Necessary protection work such as guide ropes,
crossing places, barricades, caution Boards etc. shall be provided by the Contractor.
The wooden planks for crossing trenches by public as per requirement shall be
provided by the contractor without any extra cost.
D.1.6 ADDITIONAL REQUIREMENTS :
D.1.6.1 At the joints drain the trench shall be excavated to an additional depth of 15 cms.
and width of 30 cms. and length of 15 cms. beyond the edge of collar on both the
sides or as directed by Engineer-in-charge. The rate includes for such extra
excavation made at the joints. The trenches shall be excavated perfectly in straight
line. The bottom of trench shall be kept as per invert level or as directed. In
obtaining formation on the bottom trench, the usual method of sight rails and boning
rods shall adopted. The contractor shall have to provide and fix and maintain sight
rails and boning rod without any extra cost.
D.1.6.2 If contractor fails or makes delay to give the hydraulic test of the pipe line laid line
any of the section, without any genuine reasons, he shall be responsible to get re-
excavate any part of the length of trenches refill in such case (i.e. before testing for
safety of pedestrian and / or vehicular traffic) as found necessary be the Engineer-in-
charge without any extra cost, if found necessary and as directed by the Engineer-in-
charge. The contractor shall have to excavated the refilled trenches, during
hydraulic test without any extra cost.
D.1.6.3 In case of excavation across a road, permission of road authorities shall have to be
obtained. At all road crossings, trenches shall be excavated only for half width of the
road and pipe shall be laid. The other half shall be excavated only after back filling
over the laid pipe line making it suitable for the traffic. The contractor shall
provided diversion when the pipe line is to be laid along the road as required and
shall maintain the diversion or any part of it, of damaged without any extra cost. At
all road crossings, the pipe shall be laid below the crust of the road.
D.1.6.4 The contractor shall break the road surface by Excavation of chiseling to the exact
width and length as shown on the drawing or as directed by the Engineer-in-charge.
Separate provision for additional labour in breaking, removing of pavement is made
and under this item quantity of excavation shall be including depth of such pavement
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.1.6.5 The excavated stuff shall be deposited in uniform layers to avoid mixing with other
kind of materials at no objectionable place or as directed by the Engineer-in-charge.
D.1.6.6 The contractor shall have to make his own arrangements for taking trial pits etc. at
his own cost, as directed by the Engineer-in-charge.
D.1.6.7 If necessary, temporary arrangements shall have to be made to divert or convey
across all natural water ways or build up drains etc. without any extra cost.
D.1.6.8 All water pipes, cables, any structure shall be protected by the contractor as directed
by the Engineer-in-charge, if met during excavation. Any damage caused shall be
rectified without any extra cost.
D.1.6.9 Breaking of brick structures/R.C.C. works, cement concrete etc. coming in
excavation shall be considered as excavation in strata shown in the item, as above
and will be paid at the same rate.
D.1.6.10 All safety precautions shall have to be made by the Contractor including shoring and
D.1.6.11 The excavation in narrow streets, lanes shall have to be carried out with full
precautions so as that no property may be damaged. Any compensation to be paid to
the other party will be paid by the contractor for which the Ahmedabad Municipal
Corporation will not be responsible.
D.1.6.12 All obstacles, structures etc. shall be removed and made good without further claim
D.1.7 CLASSIFICATION OF STRATA :
D.1.7.1 The decision regarding classification of strata shall rest with the Engineer-in-charge
and his decision shall be final and binding to the contractor.
D.1.7.2 All the materials encountered in the excavation shall be classified as under.
D.1.7.3 All sorts of soil, sand, gravel and other similar soft and loose materials these will
include all materials of an earthy or sandy nature which can be easily ploughed or
small shingle and gravel which can be easily removed of shall boulders not
exceeding 0.30 Cu.m. or 30 litres (about one Cft.) occurring in such strata will be
included in the rate for this item.
D.1.7.4 Soft Murrum :
D.1.7.4.1 This shall include materials which can be easily removed with the shovel after
loosening with a pick.
D.1.7.5 Hard Murrum :
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.1.7.5.1 This shall include all kinds of disintegrated rock or shale or inundated clay from
boulders, larger that 0.30 Cu.m. or 30 litres (about one Cft.) and which can be
removed with pick and shovel though not without some difficulty any which do not
require blasting.
D.1.7.6 Hard Murrum and Boulders :
D.1.7.6.1 This shall include all kinds of disintegrated rock or shale or inundated clay
interspersed with boulders less than half (0.5) a cubic meter (about half Ci.cft.) and
large than 0.30 Cu.m. or 30 litres (approx. one Cft.) which do not normally required
blasting and can be removed with pick, bar wedge and hammer.
Boulders bigger than 0.5 Cu.m. will be paid for as soft or hard rock according to as it
is soft or hard-rock.
D.1.7.7 Soft Rock :
D.1.7.7.1 This shall include all materials which is rock or hard conglomerate, all decomposed
and watered rock, highly fissured rock, old masonry and also soft rock boulders
bigger than 0.5 Cubic meter and other verities of rock which do not require blasting
and which can be removed with rock, crow bars, wedges and hammer with some
D.1.7.8 Hard Rock (Blasted)
D.1.7.8.1 This shall include all rocks, occurring in masses which could best be removed
blasting and where in the opinion of the Engineer, blasting is necessary and is
D.1.7.9 Hard Rock (Chiseled, Wedge or Line Drilled)
D.1.7.9.1 This shall include all rock, occurring in masses or boulders bigger than half cubic
meter size each, which can best be removed by blasting but which owning to the
proximity or structures, possibility of shattering the rock below or for any other
reasons should be cut by means of cold chisels of wedges or line drilling.
D.1.7.10 Laterite :
D.1.7.10.1 This shall include laterite rock soft and hard which can be removed with hammer,
chisels, crow or by blasting. Latteritic murrum which has not hardened into stone
shall be classified as hard murrum.
D.1.7.10.2 The classification of various, stratas met with during excavation will be decided by
the Engineer-in-charge and his decision shall be final and binding on the contractor.
D.1.7.10.3 Rock referred to above would include Besalt, Trap, Granite, Quartzite, Gneiss,
laterite and other types.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.1.7.10.4 The use of explosive in excavation will not be considered as a reason for other
classification then the above unless clearly necessary in the opinion of Engineer-in-
D.1.8 DEWATERING :
D.1.8.1 Unless specially provided for as a separate item in the contract, the rate of
excavation would include bailing or pumping out all water which may accumulate in
the excavation during the progress of the work, either, by percollation, seepage,
springs, rain or any other cause and diverting surface flow if any, by earthen bunds
shall be removed as soon as the work is completed.
D.1.8.2 Unless specially provided as a separate item of contract, pumping of water from
trenches etc. shall be carried out by the Contractor at his cost and he should arrange
for required number of dewatering sets for the above. He should take precaution to
prevent any damage to the foundation, trench, concrete, or masonary or any adjacent
structure. The excavation shall be kept free from water by the contractor (1) during
inspection and measurement (2) when concrete and/or masonary are in progress and
till the construction work reaches above, the natural water level had (3) till the
Engineer considers that the mortar is sufficiently set.
D.1.9 DISPOSAL OF EXCAVATED STUFF :
D.1.9.1 The surplus excavated earth, after backfilling the trenches shall have to be removed
from the site as directed.
D.1.9.2 After compaction and consolidation, if any short fall of earth is found then contractor
has to bring the same to the required quantity in order to meet shortfall at his own
cost. More over, if any settlement of road after reinstatement is observed during the
defect liability period of the work. Contractor shall be fully responsible for the
defective work and patches / depression / settlement shall be repaired with quarry
spoil or metal at contractor's own cost. If contractor fails to repair the patches/
depression / settlement in time, corporation will repair it at all risk and cost of
No bulkage shall be payable for carted material. Contractor should quote the rates
Surplus earth shall not be disposed off in a way that leads to nuisance to the public
D.1.9.3 The site should be cleared off all debris on completion of work.
D.1.10 MEASUREMENT AND PAYMENT :
D.1.10.1 The payment of a various classes of excavation, depending upon the depth of
excavation, shall be made at the unit rate per cubic meter for the quantity actually
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
excavated and accepted by the Engineer limited to dimensions shown in the
sanctioned plans L-Section or as directed by the Engineer. Excavation in excess of
the sanctioned dimensions shall not be measured nor paid for and if so ordered by
the Engineer. The contractor shall have to fill up the excess depth with selected
excavated stuff duly watered and rammed as directed by the Engineer-in-charge
without any extra payment to the Contractor.
D.1.10.2 Dimension shall be measured correct to two places of decimals of a meter and
individual quantity shall be calculated to two places of decimals of a cubic meter.
D.1.10.3 The rate for the item of excavation shall include (Unless and otherwise mentioned).
(a) Clearing of site.
(b) Setting out work including all materials and labour.
(c) Dewatering of excavation pit trench during the progress of work.
(d) Light compaction of bottom of the trench if required.
(e) Excavation & removal, sorting and stacking of all excavated stuff as directed.
(f) Necessary protection arrangements including labour, materials equipment etc.
to ensure safety and protection against risk or accident.
(g) Providing facilities for inspection and measurements at any time by the
concerned Corporation Officials.
(h) Compensation for injury to life and damage to property if caused during
progress of work.
D.1.10.4 The measurement of item shall exclude the quantity of excavation carried out for
D.1.11 Penalty :
Penalty for no barricading shall be Rs. 200 per Rmt. In case the contractor does not
provided barricading and other safety measures. The same shall be carried out by
AMC at risk and cost of contractor. 1.5 times the actual cost incurred shall be
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D-2 : BACKFILLING
D.2.1.1 All fill material will be subject to Engineer’s approval. If any material is rejected by
Engineer, contractor shall remove the same forthwith from the site at no extra cost to
the owner. Surplus fill material shall be deposited / disposed off as directed by
Engineer after the fill work is completed upto a distance of 5 Km for which separate
payment will be paid under the corresponding item.
D.2.1.2 No earth fill shall commence until surface water discharges and streams have been
properly intercepted or otherwise dealt with as directed by Engineer.
D.2.2.1 To the extent available, selected surplus soils from excavated materials shall be used
as backfill. Fill material shall be free from clods, salts, sulphates, organic or other
foreign material. All clods of earth shall be broken or removed. Where excavated
material is mostly rock, the bounders shall be broken into pieces not larger than
mm size, mixed with properly graded fine material consisting of murrum or earth fill
up the voids and the mixture used for filling.
D.2.3 If any selected fill material is required to be borrowed, Contractor shall make
arrangements for bringing such material from outside borrow pits. The material and
source shall be subject to prior approval of Engineer. The approved borrow pit area
shall be cleared of all bushed, roots of trees, plants, rubbish etc, top soil containing
salts / sulphate and other foreign material shall be removed. The materials so
removed shall be burnt or disposed off as directed by Engineer. Contractor shall
make necessary access to borrow areas and maintain the same, if such access road
does not exist, at his cost.
D.2.4 FILLING IN PITS AND TRENCHES AROUND FOUNDATIONS OF
STRUCTURES, WALLS ETC.
D.2.4.1 As soon as the work in foundations has been accepted and measured, the spaces
around the foundations, structures, pits, trenches etc. shall be cleaned of all debris,
and filled with earth in layers not exceeding 20 cm, each layer being watered,
rammed and properly consolidated, before the succeeding one is laid. Each layer
shall be consolidated to the satisfaction of Engineer. Earth shall be rammed with
approved mechanical compaction machines if instructed. Usually no manual
compaction shall be allowed unless Engineer is satisfied that in some cases manual
compaction by tampers cannot be avoided. The final backfill surface shall be
trimmed and leveled to proper profile as directed by Engineer or indicated on the
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.2.5 FILLING IN TRENCHES
D.2.5.1 Filling in trenches for pipes and drains shall be commenced as soon as the joints of
pipes and drains have been tested and passed. The backfilling material shall be
properly consolidated by watering and ramming, taking due care that no damage is
caused to the pipes.
D.2.5.1.2 Where the trenches are excavated in soil, the filling from the bottom of the trench to
the level of the centreline of the pipe shall be done by hand compaction with selected
approved earth in layers not exceeding 8 cm; backfilling above the level of the
centreline of the pipe shall also be done with selected earth by hand compaction or
other approved means in layers not exceeding 20 cm.
D.2.5.1.3 In case of excavation of trenches in rock, the filling upto a level 30 cm above the top
of the pipe shall be done with fine materials, such as earth, moorum etc. The filling
up of the level of the centreline of the pipe shall be done by hand compaction in
layers not exceeding 20 cm. Also the filling above the centreline of the pipe shall be
done by hand compaction or approved means in layers not exceeding 20 cm. The
filling from a level 30 cm. Above the top of the trench shall be done by hand or other
approved mechanical methods with broken rock filling of size not exceeding 20 cm
mixed with fine material as available to fill up the voids.
D.2.5.1.4 Filling of the trenches shall be carried simultaneously on both sides of the pipe to
avoid unequal pressure on the pipe.
D.2.6 GENERAL SITE GRADING
D.2.6.1 Site grading shall be carried out as indicated in the drawings and as directed by
Engineer. Excavation shall be carried out as specified in the specification. Filling
and compaction shall be carried out as specified elsewhere unless otherwise
indicated below.
D.2.6.2 If no compaction is called for, the fill may be deposited to the full height in one
operation and levelled. If the fill has to be compacted, it shall be placed in layers not
exceeding 200 mm and leveled uniformly and compacted as indicated in before the
next layer is deposited.
D.2.6.3 To ensure that the fill has been compacted as specified, field and laboratory tests
shall be carried out by Contractor at his cost.
D.2.6.4 Field compaction test shall be carried out at different stages of filling and also after
the entire height has been completed. This shall hold good for embankments as well.
D.2.6.5 Contractor shall protect the earth fill from being washed away by rain or damaged in
any other way. Should any slip occur, Contractor shall remove the affected material
and make good the slip at his cost.
D.2.6.6 The fill shall be carried out to such dimensions and levels as indicated on the
drawings after the stipulated compaction. The fill will be considered as incomplete if
the desired compaction has not been obtained.
D.2.6.7 If specifically permitted by Engineer, compaction can be obtained by allowing
loaded trucks conveying fill or other material to ply over the fill area. Even if such a
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
method is permitted, it will be for contractor of demonstrate that the desired /
specified compaction has been obtained. In order that the fill may be reasonably
uniform throughout, the material should be dumped in place in approximately
uniform layers. Traffic over the fill shall then be so routed to compact the area
uniformly throughout.
D.2.6.8 If so specified, the rock as obtained from excavation may be used for filling and
leveling to indicate grades without further breaking. In such an event, filling layers
not exceeding 50 cms approximately. After rock filling the void in the rocks shall be
filled with finer materials such as earth, broken stone etc. and the area flooded so that
the finer materials fill up the voids. Care shall be taken to ensure that the finer fill
material does not get washed out. Over the layer so filled, a 100 mm thick mixed
layer of broken materials and earth shall be laid and consolidation carried out by a
tonne roller. No less than twelve passes of the roller shall be accepted before
subsequent similar operations are taken up.
D.2.6.9 Fill Density
D.2.6.9.1 The compaction, only where so called for, in the schedule of quantities / items shall
comply with the specified (Standard Proctor / modified Proctor) density at moisture
content differing not more than 4 percent from the optimum moisture content.
Contractor shall demonstrate adequately at his cost, by field and laboratory tests that
the specified density has been obtained.
D.2.6.10.1 Lead for deposition / disposal of excavated material, shall be as specified in the
respective item of work. For the purpose of measurement of lead, the area to be
excavated or filled or area on which excavated material is to be deposited / disposed
off shall be divided into suitable blocks and for each of the blocks, the distance
between centerlines shall be taken as the lead which shall be measured by the
shortest straight line route taken by Contractor. No extra compensation is admissible
on the grounds that the lead including that for borrowed material had to be
transported over marshy or ‘katcha’ land / route.
D.2.6.11 Measurement and Payment
D.2.6.11.1 Backfilling as per specifications on the sides of foundations of columns, footings,
structures, walls, tanks, rafts, trenches etc. with excavated material shall be done. As
a rule, material to be backfilled shall stacked temporarily within the basic lead of
meters unless otherwise directed by the Engineer. If Engineer directs / permits a lead
of over 90 meters for such material, the conveyance of the material for the extra
distance over the basic lead of 90 meters for backfilling will be paid for.
D.2.6.11.2 Actual quantities of consolidated back filing shall be measured and paid in cubic
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Penalty for improper watering and compaction will be Rs. 350/Tanker required and
rent for roller @ Rs. 20 per sq.m.
In case the watering and compaction of the backfilled material is not as per the
specifications, AMC will carry out the same through own resources. A rate of Rs.
350 per water tanker and Rs. 20 per sq.m. for rolling and compacting will be
recovered from the contractor.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D-4 : GRANULAR /CEMENT CONCRETE BEDDING
(A) PROVIDING BEDDING INCL. RAMMING, WATERING, CONSOLIDATING
ETC. FILLING IN TRENCH WITH AVAILABLE SAND
D.4.0 WORKMANSHIP
D.4.1 The sand / granular material to be use for bedding shall be free from salts,
organic or other foreign matter. All clods of sand shall be broken.
D.4.2 As soon as the work in trench has been completed and measured the site of
trench shall be cleared of all debris, brick bats, mortar dropping etc. sand filled
with sand in layers not exceeding 20 cms. Each layer shall be adequately
watered, rammed and consolidated before the succeeding layer is laid. The
sand shall be rammed with iron rammers where feasible and with the butt ends of
crowbars, where rammer cannot be used.
D.4.3 The finished level of bedding shall be kept to shape intended to be given to
D.4.4 The consolidation may be done by hand rammers, where so specified. The extent
of consolidation required shall also be as specified.
D.4.5 The sand /granular material shall be allowed to be used in bedding the trenches.
Under no circumstances black cotton soil be used for bedding.
D.4.6 MODE OF MEASUREMENTS & PAYMENT :
The payment shall be made for bedding the granular material as per drawings. No
deduction shall be made for shrinkage or voids, if consolidated as instructed above.
The rate shall be for a unit of one cubic meter.
Providing and laying cement concrete1:4:8(1-Cement:4-coarse sand:8-hand
broken stone aggregates 40mm nominal size) including consolidation, curing
excluding cost of form work etc. complete.
D.4.7 The concrete bedding of proportion (1:4:8) shall be according to specification of
Item of concrete works.
D.4.8 MODE OF MEASUREMENTS & PAYMENT :
The payment shall be made for concrete bedding as per drawings. No deduction
shall be made for shrinkage or voids, if consolidated as instructed above.
The rate shall be for a unit of one cubic meter.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D-5 : EXCAVATION OF ASPHALT PAVEMENT & REINSTATEMENT
(A) EXCAVATION OF ASPHALT PAVEMENT
D.5.1 Under this item contractor shall demolish existing asphalt,Existing RCC Road or
WBM pavement for New road base work.
D.5.2 Work done to the extent of requirement for laying of drain and as per specifications
shall be measured in sq.m. and paid at the tender rate.
D.5.3 Penalty for incomplete reinstatement work shall be recovered @ 1.5 times the actual
expense incurred by AMC.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D-8 : FOR MANHOLE REPAIR & FRC MANHOLE SEAT AND
D.8.0 MATERIALS :
Water shall conform to M-1, Cement Conform to M-2, Stone coarse aggregate of
20 mm nominal size shall conform to M-5A, Grit shall conform to M-4, Steel
reinforcement shall conform to M-9-12. Flyash brick shall conform to M-8A,
Cement mortar of specified proportion shall conform to M-6.
Manhole cover with frame of required size and weight shall be procured by the
D.8.1 WORKMANSHIP :
The manhole of different types and sizes as specified shall be constructed in sewer
line at such place and to such levels and dimension as shown in drawing or as
Excavation :- The excavation for construction of manhole including
dismantling of all types of roads surface guarding, barricading, lightening the
trenches, dewatering if required, removing and replacing, shifting of
telephone/electric cables, pipe line etc. and all other safety provisions like shoring
and strutting etc. till refilling of trenches and completion of manhole
construction, stacking of excavated stuff within the specified lead, back filling
of selected excavated earth, watering and considation etc. complete shall be
carried out as per relevant specification of Excavation.
Concrete work :- Brick bats cement concrete (1:5:10) for C.C. channel (1:2:4)
finished, slab in C.C. 1 : 1.5 : 3 by volume with necessary centering and shuttering
work shall be provided. It should be placed deemed and or vibrated and cured as
directed by engineer in charge.
D.8.2 REINFORCEMENT :
All the reinforcement bars shall be accurately placed in exact position shown on
the drawings and shall be securely held in position during placing of of concrete by
annealed No. 1 binding wire not less than 1 mm is size and by using stay block
ornnetal chair spacers, metal hangers, supporting wires or other approved devices it
sufficiently close intervals. Bars shall not be allowed to bag between supports nor
displaced during concrete of any other operation of the work. Reinforcement after
being placed in position shall be maintained in a clean condition until completely
embedded in concrete. Special care shall be exercised to prevent any displacement of
reinforcement in concrete already placed. To prevent reinforcement from
corrosion, concrete cover shall be provided as indicated on drawings.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Bars shall be bend cold to specified shape and dimensions or as directed, attain
proper radius of bends, Bars shall not be bent or straightened in a manner that will
injure the materials. Bars bend during transport of handling shall be straightened
before being used on the work. Unless other wise specified for mild steel a `U' type
hook at the end of each bar shall invariably be provided to main reinforcement.
In case which are not round and in case of deformed bars, the diameter shall be
taken as the diameter of circle having an equivalent effective area. The cold
twisted steel bars shall be used or without hooks at the ends. Deformed bars without
hooks shall however, comply with relevant anchorage requirements.
Bars crossing each other where required shall be secured by binding wires
(annealed) of size not less than 1 mm in such a manner that they do not slip over
each other at the time of fixing and concreting.
As far as possible bars of full length shall be used. In case this not possible
overlapping of bars shall be done as directed. The overlaps shall be staggered for
different bars and located at points along the span where shear not bending moment
When permitted or specified on the drawings joints of reinforcement bars
shall butt welded so as to transmit their full stresses. Welded joints shall preferably
located at points when steel will not be subject to more than 75 percent of the
maximum permissible stresses and welds so staggered that at any one section not
more than 20 percent of the rods are welded. It shall be ensured that no voids are
left in welding and when welding is done in two or three stages, previous surface
shall be cleaned properly. Ends of the bars shall be cleaned of all loose scale, rust,
grease, paint and other foreign matter before welding. Only competent welders shall
be employed on the work.
D.8.3 BRICK MASONARY WORK :
Before masonary is to be laid on concrete footing the top of concrete shall be
cleaned and moistened. The contractor shall obtain the Engineer's approval for one
foundation, bed, before foundation masonary is started.
Wetting of Bricks: The brick required for masonary shall be throughly wetted with
clean water for amount two hours before use or as directed. The cassation of
bubbles, when the bricks are wetted with water is an indication of through wetting
Brick shall be laid in English bond unless directed otherwise. Half or out bricks shall
not be used except when necessary to complete to bond. Closers in such case shall be
cut to required size and used bear the ends of walls.
A layer of mortar shall be spread on full width for suitable length of the lower
course, each brick shall first be properly bedded and set home by gently tamping
with handle of trowel of wooden mallet. Its inside face shall be flushed with mortar
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
the next brick is laid and pressed again it. On completion of course, the vertical
joints shall be fully silled from the top with mortar.
The wall shall be taken up truly in plumb. All corners shall be laid truly horizontal
and all vertical joint shall be truly vertical. Vertical joints in alternate course shall
generally be directly one over the other. The thickness of brick course shall be kept
The brick shall be laid with from up wards. A set of tools comprising of wooden
straight edges, monsoon spirit level, square half meter rub, and pins string and
plumb shall be kept on the site of work for frequent checking during the progress of
Both the faces of walls of thickness greater than 23 cms. shall be kept in proper
place. All the connected brick work shall be kept not more than one meter over the
rest of the work. Where this is not possible the work shall be raked back according
to bond (and not left toothed) at an angle not stoper than 45 degrees.
All fixtures like pipe inlet and outlet, PVC steps, manhole cover and frame etc.
which are required to be built in wall shall be embeded in cement mortar.
Brick shall be so laid that all joints shall not exposed 12 mm. The face joints shall
be raked out as directed by raking tool daily during the progress of work, when the
mortar in still green so as to provided key for plaster or ponting to be done.
For the face of brick work, plastering is to be done joints shall be racked out to a
depth not less than thickness of joints. The face of brick work shall be cleaned
and mortar dropping removed on very same day that brick work is laid.
D.8.4 PLASTER WORK :
The surface shall be cleaned of all dust, loose mortar droppings, traces of algae
afflorseence and other foreign mortar by water or by brushing. Smooth surface shall
be roughened by wire brushing of it is not hard any by backing if it is har. In case
of concrete surface, if a chemical retarder has been applied to the form work. The
surface shall be roughened by wire brushing and all the resulting dust and loose
particles cleaned off and care shall be taken that done of the reerarders is left on
the surface. Trimming of projections on brick/concrete surface where necessary
shall be carried out to get an even surface.
The work shall be soaked but only damped evenly before applying the plaster. If
the surface become dry, such areas shall be moistened again.
The plaster about 15 x 15 cms. shall be first applied horizontally and
vertically at not more than 2 meters intervals over the entire surface to serve as
gauge. The surface of these gauges shall be truly in plane of the finished
plastered surface. The mortar shall than be applied in uniform surface slightly
more than the specified thickness, then brought to a true surface be working a
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
wooden straight edge reaching acress the gauges with small upward and sideways
movements at a time. Finally, the surface shall be finished off true with a trowel of
wooden float accordingly excessive trowelling of over working the float shall be
avoided. All corners arrises angles and junctions shall be truly vertical of
horizontal as the case may be and shall be carefully finished. Rounding or
chambering conners, arrises junctions etc. shall be carried out with proper templates
the size required.
Cement mortar for plaster shall be used within half an hour after addition of
water. And mortar for plaster which is partially set shall be rejected and removed
forthwith from the site.
In suspending the work at the end of the day, the plaster shall be left out clean to the
line both horizontally and vertically, when recommending the plaster the edge of the
old work shall be scraped clear and wetted with cement putty before plaster is
applied to the adjustment areas to enable the two to properly together. Plastering
work shall be closed at the end of the day on the body of the wall and nearer than
cm. to any corners of arises. It shall not be closed on the body of features such as
plaster bends and cornices not at the corners or arises. Horizontal joints in
plaster work shall not also occure on walls and copings these invariably leads to
leakage. No portion of the surface shall be deft out initially to be packed up latter
D.8.7 MODE OF MEASUREMENTS & PAYMENTS :
Payment shall be made on the basis as per number of masonary manholes
chamber Constructed with all constructing materials labours, excavation refilling
curing, finishing, providing and fixing M.S Steel HDPE coated steps, constructing
laying half round gutter, fixing R.C.C. manhole cover etc. complete in all
The item will be paid per No. of construction of complete masonary manhole
chamber as shown in the drawing upto the depth specified and shown in the type
design drawing.
The measurements shall be made for such number of chambers construction. The
surplus excavated stuff shall be disposed of as directed by Engineer-in-charge.
The depth of manholes shall be the distance between the top of manhole and the
invert level of the main drain. The rate includes all labours, materials, tools and
plant etc. required for satisfactory completion of this item as directed above.
The item includes :-
(i) Excavation for manhole
(ii) Bed concrete, slab concrete and copping with necessary
(iii) Necessary brick work with cement plaster inside and outside.
(iv) Providing and fixing M.S Steel HDPE coated steps
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
(v) Carting, conveying and fixing of manhole frame cover with necessary
concrete and finishing.
(vi) Refilling with necessary watering and consolidation.
(vii) Curing for 14 days.
D.8.8 FIBRE REINFORCED CONCRETE :
Frame and Cover – The fibre reinforced concrete frame and cover shall be 560 mm
dia. Heavy duty type (circular-HD-20) as per IS:12592-2002. The dimensions of
frame shall as per table-1 of clause 5.2 of IS-12592. The load test shall be as per
table-2 of IS : 12592-2002.
Table No. 2 – Test Load and Diameter of Block
Grade of Type Load Diameter of
LD-2.5 Rectangular, square or circular 25
MD-10 Rectangular or circular 100
HD-20 Rectangular, square or circular 200
EHD-35 Rectangular, square or circular 350
The cover should have suitable lifting arrangement. The FRC frame and cover shall
be paid on number basis of completed item at site.
D.8.9 PRECAST RCC MANHOLE:
The Precast RCC Manhole should be constructed in RCC M 40 grade concrete.
Specifications for material used for Precast manhole shall be as per detail
specification of material. Specification for concrete work and reinforcement work
shall be as per D-9. For all the requirement of Precast reinforced concrete manholes
shall be as per ASTM Designation : C478-09 should be followed. The payment shall
be made on number basis. The same rate shall be applicable for depth. + 0.5 m.
than mentioned in the item.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D-9 : REINFORCED CEMENT CONCRETE WORK & PLAIN
CEMENT CONCRETE WORK
D.9.1.1 This Specification covers the general requirements for concrete using on-site
production facilities including requirements in regard to the quality, handling,
storage of ingredients, proportioning, batching, mixing, transporting, placing, curing,
protecting, repairing, finishing and testing of concrete; form work; requirements in
regard to the quality, storage, bending and fixing of reinforcement; grouting as well
as mode of measurement and payment for complete works.
D.9.1.2 It shall be very clearly understood that the specifications given herein are brief and
do not cover minute details. However, all work shall have to be carried out in
accordance with the relevant standards and codes of practices or in their absence in
accordance with the best accepted current engineering practices or as directed by
Engineer from time to time. The decision of Engineer as regards the specification to
be adopted and their interpretation and the mode of execution of work shall be final
and binding on Contractor and no claim whatsoever will be entertained on this
D.9.2 APPLICABLE CODES AND SPECIFICATIONS
D.9.2.1 The following specifications, standards and codes, including all official amendments
/ revisions and other specifications and codes referred to therein, should be
considered a part of this specification. In all cases the latest issue / edition / revision
shall apply. In case of discrepancy between this specification and those referred to
herein below or other specifications forming a part of this bid document, this
specification shall govern.
D.9.2.2 Code for Materials
1. IS : 269 - Specification for 33 grade ordinary portland cement
2. IS : 455 - Specification for portland slag cement
3. IS : 1489 - Specification for portland pozzolana cement
4. IS : 8112 - Specification for 43 grade ordinary portland
5. IS : 12330 - Specification for sulphate resisting portland cement
6. IS : 383 - Specification for coarse and fine aggregates from
natural sources for concrete.
7. IS : 432 - Specification for mild steel and medium tensile
(Part 1 and 2) steel bars and hard drawn steel wires for concrete
8. IS : 1786 - Specification for high strength deformed steel bars
and wires for concrete reinforcement.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
9. IS : 1566 - Specification for hard drawn steel wire fabric for
concrete reinforcement.
10. IS : 9103 - Specification for admixtures for concrete.
11. IS : 2645 - Specification for integral cement water proofing
12. IS : 4990 - Specification for plywood for concrete shuttering
13. IS : 12269 - Specification for 53 grade ordinary portland
D.9.2.3 Code for Material Testing
1. IS : 4031 - Methods of physical tests for hydraulic cement.
(Parts 1 to 15)
2. IS : 4032 - Methods of chemical analysis of hydraulic cement.
3. IS : 650 - Specifications for standard sand for testing of
4. IS : 2430 - Methods for sampling of aggregates for concrete.
5. IS : 2386 - Methods of test for aggregates for concrete.
6. IS : 3025 - Methods of sampling and test (physical and
chemical) water used in industry.
7. IS : 6925 - Methods of test for determination of water soluble
chlorides in concrete admixtures.
D.9.2.4 Code for Materials Storage
1. IS : 4082 Recommendations on stacking and storing of
construction materials at site.
D.9.2.5 Code for Concrete Mix Design
1. IS : 10262 - Recommended guidelines for concrete mix design.
2. SP : 23 - Handbook on Concrete Mixes.
D.9.2.6 Code for Concrete Testing
1. IS : 1199 - Method of sampling and analysis of concrete.
2. IS : 516 - Method of test for strength of concrete
3. IS : 9013 - Method of making, curing and determining
compressive strength of accelerated cured concrete
test specimens.
4. IS : 8142 - Method of test for determining setting time of
concrete by penetration resistance.
5. IS : 9284 - Method of test for abrasion resistance of concrete.
6. IS : 2770 - Methods of testing bond in reinforced concrete.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.2.7 Code for Equipment
1. IS : 1791 - Specification for batch type concrete mixers.
2. IS : 2438 - Specification for roller pan mixer.
3. IS : 4925 - Specification for concrete batching and mixing plant.
4. IS : 5892 - Specification for concrete transit mixer and agitator.
5. IS : 7242 - Specification for concrete spreaders.
6. IS : 2505 - General Requirements for concrete
vibrators : Immersion type.
7. IS : 2506 - General Requirements for screed board concrete
8. IS : 2514 - Specification for concrete vibrating tables.
9. IS : 3366 - Specification for pan vibrators.
10. IS : 4656 - Specification for form vibrators for concrete.
11. IS : 11993 - Code of practice for use of screed board concrete
12. IS : 7251 - Specification for concrete finishers.
13. IS : 2722 - Specification for portable swing weigh batchers for
concrete (single and double bucket type).
14. IS : 2750 - Specification for steel scaffoldings.
D.9.2.8 Codes of Practice
1. IS : 456 - Code of practice for plain and reinforced concrete.
2. IS : 457 - Code of practice for general construction of plain and
reinforced concrete for dams and other massive
3. IS : 3370 - Code of practice for concrete structures for storage of
(Parts 1 to) liquids.
4. IS : 3935 - Code of practice for composite construction.
5. IS : 2204 - Code of practice for construction of reinforced concrete
6. IS : 2210 - Criteria for the design of reinforced concrete shell
structures and folded plates.
7. IS : 2502 - Code of practice for bending and fixing of bars for
concrete reinforcement.
8. IS : 5525 - Recommendation for detailing of reinforcement in
reinforced concrete works.
9. IS : 2751 - Code of practice for welding of mild steel plain and
deformed bars used for reinforced concrete
10. IS : 9417 - Specification for welding cold worked bars for
reinforced concrete construction.
11. IS : 3558 - Code of practice for use of immersion vibrators for
consolidating concrete.
12. IS : 3414 - Code of practice for design and installation of joints in
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
13. IS : 4326 - Code of practice for earthquake resistant design and
construction of building.
14. IS : 4014 - Code of practice for steel tubular scaffolding.
15. IS : 2571 - Code of practice for laying in-situ cement concrete
16. IS : 7861 - Code of practice for extreme weather concreting.
(Part – 1) - Recommended practice for hot weather concreting.
(Part – 2) - Recommended practice for cold weather concreting.
D.9.2.9 Code for Construction safety
1. IS : 3696 - Safety code for scaffolds and ladders.
(Parts I and III)
2. IS : 7969 - Safety code for handling and storage of building
3. IS : 8989 - Safety code for erection of concrete framed
D.9.2.10 Code for Measurement
1. IS : 1200 - Method of measurement of building and engineering
(Part 1 to 28) works.
2. IS : 3385 - Code of practice for measurement of Civil
Engineering works.
D.9.3.1 Engineer shall have the right at all times to inspect all operations including the
sources of materials, procurement, layout and storage of materials, the concrete
batching and mixing equipment, and the quality control system. Such an inspection
shall be arranged and Engineer’s approval obtained, prior to starting of concrete
work. This shall, however, not relieve Contractor of any of his responsibilities. All
materials which doe not conform to this specification shall be rejected.
D.9.3.2 Materials should be selected so that they can satisfy the design requirements of
strength, serviceability, safety, durability and finish with due regards to the
functional requirements and the environmental conditions to which the structure will
be subjected. Materials complying with codes / standards shall generally be used,
other materials may be used after approval of the Engineer and after establishing
their performance suitability based on previous data, experience or tests.
D.9.4 MATERIALS
D.9.4.1.1 Unless otherwise specified or called for by the Engineer, cement shall be Ordinary
Portland cement conforming to IS specified above.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.4.1.2 Where Portland pozzolana or slag cement are used, it shall be ensured that
consistency of quality is maintained, there will be no adverse interactions between
the materials and the finish specified is not marred.
D.9.4.1.3 Only one type of cement shall be used in any one mix. The source of supply, type or
brand of cement within the same structure or portion thereof shall not be changed
without approval from Engineer.
D.9.4.1.4 Cement which is not used within 90 days from its date of manufacture shall be tested
at a laboratory approved by Engineer and until the results of such tests are found
satisfactory, it shall not be used in any work.
D.9.4.2 Aggregates (General)
D.9.4.2.1 General
D.9.4.2.1.1 “Aggregate” in general designates both find and coarse inert materials used in the
manufacture of concrete (vide BIS 456 & BIS 383) and conforming to tests as per
BIS 2386 (Part I to VI).
D.9.4.2.1.2 “Coarse Aggregate” is aggregate most of which is retained when passed through on
4.75 mm BIS sieve.
D.9.4.2.1.3 All fine and coarse aggregates proposed for use in the works shall be subject to the
Engineer-in-Charge’s approval and after specific materials have been accepted, the
source of supply of such materials shall not be changed without prior approval of the
Engineer-in-charge.
D.9.4.2.1.4 Aggregates shall consist of natural sand, stone (crushed or uncrushed) and gravel
from a source known to produce satisfactory aggregate for concrete and shall be
chemically inert, non-flaky, strong, hard, durable against weathering, or limited
porosity and free from deleterious materials that may cause corrosion of the
reinforcement or may impair the strength and or durability of concrete. The grading
of aggregates shall be such as to produce a dense concrete of specified strength and
consistency that will work readily into position without segregation and shall be
based on the “mix design” and preliminary tests on concrete specified later. The
aggregates shall be brought from the source as mentioned in Volume–I Clause
D.9.4.2.2 Sampling and testing
D.9.4.2.2.1 Samples of the aggregates for mixed design and determination of suitability shall be
taken under the supervision of the Engineer-in-charge and delivered to the
laboratory, well in advance of the scheduled placing of concrete. Records of tests,
which have been made on proposed aggregates and on concrete made from this
source of aggregates shall be furnished to Engineer-in-charge in advance of the
work, for use in determining aggregate suitability. The costs of all such tests,
sampling etc. shall be borne by the contractor.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.4.2.3 Storage of aggregates
D.9.4.2.3.1 All coarse and fine aggregates shall be stacked separately in stock piles in the
material yard near the work site in bins properly constructed to avoid inter mixing of
different aggregates. Contamination with foreign material and earth during storage
and while heaping the materials shall be avoided. The aggregates must be of
specified quality not only at the time of receiving at site but more so at the time of
loading into mixer. Rakers shall be piled in layers not exceeding 1.20 m in height to
prevent coning or segregation. Each layer shall cover the entire area of stock pile
before succeeding layers are started. Aggregates that have become segregated shall
D.9.4.2.4 Specific Gravity
D.9.4.2.4.1 Aggregates having a specific gravity below 2.4 (saturated surface dry basis) shall not
D.9.4.3 Fine Aggregate
D.9.4.3.1 Fine aggregate shall consist of natural or crushed sand conforming to IS
conforming to tests as per IS 2386 part I to IV. The sand shall be clean, sharp, hard,
strong and durable and shall be free from dust, vegetable substances, adherent
coating, clay, alkali, organic matter, mica, salt or other deleterious substances, which
can be injurious to the setting qualities / strength/ durability of concrete.
D.9.4.3.2 Screening and Washing : Sand shall be prepared for use by such screening or
washing, or both, as necessary, to remove all objectionable foreign matter while
separating the sand grains to the required size fraction.
D.9.4.3.3 Foreign Material limitations : The percentage deleterious substances in sand
delivered to the mixer shall not exceeding the following :
Sr. Foreign Material Percentage by weight
No. Uncrushed Crushed
1 Material finer than 75 micron IS sieve 3.0
3 Coal and Lignite 1.0
4 Clay Lumps 1.0
D.9.4.3.4 Gradation : Unless otherwise directed or approved by the Engineer-in-charge, the
grading of sand shall be within the limits indicated hereunder.
IS : Sieve Grading Grading Grading Grading
Designation Zone-I Zone-II Zone-III Zone-IV
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.4.3.4.1 Where the grading falls outside the limits of any particular grading zone of sieves,
other than 600 microns IS sieve, by total amount not exceeding 5%, it shall be
other than 600 microns IS sieve, by total amount not exceeding 5%, it shall be
regarded as falling within that grading zone. This tolerance shall not be applied to
percentage passing the 600 micron IS sieve or to percentage passing any other sieve
on the coarser limit of grading zone I or the finer limit of grading zone IV. Fine
aggregates conforming to grading zone IV shall not be used. Mix designs and
preliminary tests shall show its suitability for producing concrete of specified
strength and workability.
D.9.4.3.5 Fineness Modulus
The sand shall have a fineness modulus of not less than 2.2 or more than 4.2. The
fineness modulus is determined by adding the cumulative percentages retained on
the following IS sieve sizes (4.75 mm, 2.35 mm, 1.18 mm, 600 microns and
microns) and dividing the sum by
D.9.4.4 Coarse Aggregate
D.9.4.4.1 Coarse aggregate for concrete, except as noted above, shall conform to IS 383 and IS
2386. This shall consist of crushed stone and shall be clean and free from elongated,
flaky or laminated pieces, adhering coatings, clay lumps, coal residue, clinkers, slag,
alkali, mica, organic matter or other deleterious matter.
D.9.4.4.2 Screening and Washing : Crushed rock shall be screened and or washed for the
removal of dirt or dust coating, if so requested by the Engineer-in-charge.
D.9.4.4.3 Grading
D.9.4.4.3.1 Coarse aggregate shall be either in single size or graded, in both cases the grading
shall be within the following limits :
IS Percentage passing for single sized Percentage passing for graded
Sieve Aggregate of normal size aggregate of normal size
D.9.4.4.3.2 The pieces shall be angular in shape and shall have granular or crystalline surfaces.
Friable, flaky and laminated pieces, mica and shale, if present, shall be only within
tolerance limits which will not affect adversely the strength and or durability or
concrete. The maximum size of coarse aggregate shall be 40 mm for M7.5 and M10
and 20 mm for M15 to M20 concrete, or as directed by the Engineer-in-charge or
specified otherwise. The maximum size of coarse aggregate shall be the maximum
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
size specified above but in no case greater than ¼th of the minimum thickness of the
member, provided that the concrete can be placed without difficulty so as to
surround all reinforcement thoroughly and fill the corners of the form. For plain
concrete the maximum size of aggregate shall be of 40 mm. for heavily reinforced
concrete members, the nominal maximum size of the aggregate shall be 5 mm less
than the minimum clear distance between the reinforcing main bars or 5 mm less
than the minimum cover reinforcement whichever is smaller.
D.9.4.4.4 Foreign material limitations
D.9.4.4.4.1 The percentage of deleterious materials in the aggregate delivered to the mixer shall
not exceed the following :
Sr. Foreign Material Percentage by weight
No. Uncrushed Crushed
1 Material finer than 75 micron 3.0
2 Coal and lignite 1.0
3 Clay lumps 1.0
4 Soft fragments 3.0 --
D.9.4.5.1 Water used for both mixing and curing shall conform to IS : 456. Potable water is
generally satisfactory. Water containing any excess of acid, alkali, sugar or salt shall
D.9.4.6 Reinforcement
D.9.4.6.1 Reinforcement bars shall conform to IS : 432, IS : 226 or IS : 1786 and the welded
wire fabric to IS : 1566 as shown or specified on the drawings.
D.9.4.6.2 All reinforcement shall be clean, free from pitting, oil, grease, paint, loose mill
scales, rust, dirty dust or any other substance that will destroy or reduce bond.
D.9.4.6.3 If permitted by Engineer, welding of reinforcement shall be done in accordance with
IS ; 2751 or IS : 9417 as applicable.
D.9.4.6.4 Reinforcement shall be TMT Fe-500.
D.9.4.7 Admixtures
D.9.4.7.1 Accelerating, retarding, water-reducing and air entraining admixtures shall conform
to IS : 9103 and integral water proofing admixtures to IS :
D.9.4.7.2 Admixtures may be used in concrete as per manufacturer’s instructions only with the
approval of Engineer based upon evidence that with the passage of time neither the
compressive strength nor its durability is reduced. An admixture’s suitably and
effectiveness shall be verified by trial mixes with the other material used in the
works. If two or more admixtures are to be used simultaneously in the same
concrete mix, their interaction shall be checked and trial mixes done to ensure their
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
compatibility. There should also be no increase in risk of corrosion of the
reinforcement or other embedments.
D.9.4.7.3 Calcium chloride shall not be used for accelerating set of the cement for any concrete
containing reinforcement or embedded steel parts. When calcium chloride is
permitted such as in mass concrete works, it shall be dissolved in water and added to
the mixing water by an amount not exceeding 1.5 percent of the weight of the
cement in each batch of concrete. The designed concrete mix shall be corrected
D.9.4.8 Wastage
D.9.4.8.1 No wastage allowance for cement and steel shall be considered and paid for.
D.9.5 SAMPLES AND TESTS
D.9.5.1 All materials used for the works shall be tested before use.
D.9.5.2 Manufacturer’s test certificate shall be furnished, for each batch of cement / steel and
when directed by Engineer samples shall also be got tested by the Contractor in a
laboratory approved by Engineer at no extra cost to Client. However, where material
is supplied by Client, all testing charges shall be borne by Client; but transportation
of material samples to the laboratory shall have to be done by Contractor at no extra
D.9.5.3 Sampling and testing shall be as per IS : 2386 under the supervision of Engineer.
The cost of all tests, sampling etc. shall be borne by Contractor.
D.9.5.4 Water to be used shall be tested to comply with requirement of IS :
D.9.5.5 Contractor shall furnish manufacturer’s test certificates and technical literature for
the admixture proposed to be used. If directed the admixture shall be got tested and
approved laboratory at no extra cost.
D.9.6 STORING OF MATERIALS
D.9.6.1 All material shall be stored in a manner so as to prevent its deterioration and
contamination which would preclude its use in the works. Requirements of IS :
shall be complied with.
D.9.6.2 Contractor will have to make his own arrangements for the storage of adequate
quantity of cement even if cement is supplied by Client. Cost of such rejected
cement, where cement is supplied by Client, shall be recovered at issue rate or open
market rate which ever is higher. Cement bags shall be stored in dry weatherproof
shed with a raised floor, well away from the outer walls and insulated from the floor
to avoid moisture from ground. Not more than 15 bags shall be stacked in any tier.
Storage arrangement shall be approved by Engineer. Storage under tarpaulins shall
not be permitted. Each consignment of cement shall be stored separately and
consumed in its order or receipt.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.6.3 Each size of coarse and fine aggregates shall be stacked separately and shall be
protected from leaves and contamination with foreign material. The stacks shall be
on hard, clean, free draining bases, draining away from the concrete mixing area.
D.9.6.4 Contractor shall make his own arrangements for storing water at site in tanks to
prevent contamination.
D.9.6.5 The reinforcement shall be stacked on top of timber sleepers to avoid contract with
ground / water. Each type and size shall be stacked separately.
D.9.7.1 General
Concrete grade shall be as designated on drawings. In concrete grade M15, M20,
M25 etc. the number represents the specified characteristic compressive strength of
150 mm cube at 28 days, expressed in N/sq.mm as per IS : 456. Concrete in the
works shall be “Design Mix Concrete” or “Normal Mix Concrete”. All concrete
works of grade M5, M7.5,M-10 and M15 shall be Nominal whereas all other
grades, M20 and above, shall be Design Mix Concrete.
D.9.7.2 Design Mix Concrete
D.9.7.2.1 Mix Design and Testing
D.9.7.2.1.1 For Design Mix Concrete, the mix shall be designed according to IS : 10262 and SP:
23 to provide the grade of concrete having the required workability and
characteristics strength not less than appropriate values given in IS : 456. The design
mix shall in addition be such that it is cohesive and does not segregate and should
result in dense and durable concrete and also capable of giving the finish as
specified. For water retaining structures, the mix shall also result in water-tight
concrete. The Contractor shall exercise great care while designing the concrete mix
and executing the works to achieve the desired result.
D.9.7.2.1.2 Unless otherwise specifically mentioned, the minimum cement content for Design
Mix Concrete shall be as given below.
Grade of Concrete Minimum Cement Content in
Kg/Cu.m of concrete
The minimum cement content stipulated above shall be adopted irrespective of
whether the Contractor achieves the desired strength with less quantity of cement.
The Contractor’s quoted rates for concrete shall provide for the above eventually and
nothing extra shall become payable to the Contractor in this account. Even in the
case where the quantity of cement required is higher than that specified above to
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
achieve desired strength based on an approved mix design, nothing extra shall
become payable to the Contractor.
D.9.7.2.1.3 It shall be Contractor’s sole responsibility to carry out the mix designs at his own
cost. He shall furnish to Engineer at least 30 days before concreting operations, a
statement of proportions proposed to be used for the various concrete mixes and the
strength results obtained. The strength requirements of the concrete mixes
ascertained on 150 mm cubes as per IS : 516 shall comply with the requirements of
Grade of Minimum Compressive Specified
Compressive strength
(N/Sq.mm at 7 days)
(N/Sq.mm at 28 days)
D.9.7.2.1.4 A range of slumps, which shall generally be used for various types of construction
unless otherwise instructed by the Engineer is given below :
Structure / Member Slump in millimeters
Maximum Minimum
Reinforced foundation walls and footings 75
Plain footings, caissons and substructure walls 75
T.G. and massive compressor foundations 50
Slabs, beams and reinforced walls 100
Pumps and miscellaneous equipment 75
Building columns 100
Heavy mass construction 50
D.9.7.2.2 Batching and Mixing of Concrete
D.9.7.2.2.1 Proportions of aggregates and cement, as decided by the concrete mix design, shall
be by weight. These proportions shall be maintained during subsequent concrete
batching by means of weigh batchers capable of controlling the weights within one
percent of the desired value.
D.9.7.2.2.2 Amount of water added shall be such as to produce dense concrete of required
consistency, specified strength and satisfactory workability and shall be so adjusted
to account for moisture content in the aggregates. Water cement ratio specified shall
be maintained. Each time the work stops, the mixer shall be cleaned out, and while
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
recommencing, the first batch shall have 10% additional cement to allow for sticking
D.9.7.2.2.3 Arrangement should be made by Contractor to have the cubes tested in an approved
laboratory or in field at his own expense, with prior consent of Engineer. Sampling
and testing of strength and workability of concrete shall be as per IS : 1199, IS :
D.9.7.3 Nominal Mix Concrete
D.9.7.3.1 Mix Design and Testing
D.9.7.3.1.1 Mix design and preliminary tests are not necessary for Nominal mix Concrete.
However works tests shall be carried out as per IS : 456. Proportions for Nominal
Mix Concrete and water / cement ratio may by adopted as per Table 3 of IS :
However it will be Contractor’s sole responsibility to adopt appropriate nominal mix
proportions to yield the specified strength.
D.9.7.3.2 Batching and Mixing Concrete
D.9.7.3.2.1 Based on the adopted nominal mixes, aggregates and cement shall be measured by
D.9.8 FORM WORK
D.9.8.1 Form work shall be all inclusive and shall consist of but not limited to shores,
bracings, sides of footings, walls, beams and columns, bottom of slabs etc. including
ties, anchors, hangers, inserts, falsework, wedges etc.
D.9.8.2 The design and engineering of the formwork as well as its construction shall be the
responsibility of Contractor. However, if so desired by Engineer the drawings and
calculations for the design of the formwork shall be submitted to Engineer for
D.9.8.3 Formwork shall be designed to fulfill the following requirements :
a) Sufficiently rigid and tight to prevent loss of grout or mortar from the
concrete at all stages and appropriate to the methods of placing and
b) Made of suitable materials.
c) Capable of providing concrete of the correct shape and surface finish within
the specified tolerance limits.
d) Capable of withstanding without deflection the worst combination of self
weight, reinforcement and concrete weight, all loads and dynamic effects
arising from construction and compacting activities, wind and weather
e) Capable of easily striking without shock, disturbance or damage to the
f) Soffit forms capable of imparting a camber if required.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
g) Soffit forms and supports capable of being left in position if required.
h) Capable of being cleaned and / or coated if necessary immediately prior to
casting the concrete; design temporary openings where necessary for these
purposes and to facilitate the preparation of construction joints.
D.9.8.4 The formwork may be of timber, plywood, steel, plastic or concrete depending upon
the type of finish specified. Sliding forms and slip for may be used with the
approval of Engineer. Timber for formwork shall be well seasoned, free from sap,
shakes, loose knots, work holes, warps and other surface defects. Joints between
formwork and formwork and between formwork and structures shall be sufficiently
tight to prevent loss of slurry from concrete, using seals if necessary.
D.9.8.5 The faces of formwork coming in contact with concrete shall be cleaned and two
coats of approved mould oil applied before fixing reinforcement. All rubbish,
particularly chippings, shavings, sawdust, wire pieces dust etc. shall be removed
from the interior of the forms before the concrete is placed. Where directed,
cleaning of forms shall be done by blasting with a jet of compressed air at no extra
D.9.8.6 Forms intended for reuse shall be treated with care. Forms that have deteriorated
shall not be used. Before reuse, all forms shall be thoroughly scraped, cleaned, nails
removed, holes suitably plugged, joints repaired and warped lumber replaced to the
satisfaction of Engineer. The Contractor shall equip himself with enough shuttering
to allow for wastage so as to complete the job in time.
D.9.8.7 Permanent formwork shall be checked for its durability and capability with adjoining
concrete before it is used in the structure. It shall be properly anchored to the
D.9.8.8 Wire ties passing through beams, columns and walls shall not be allowed. In their
placed bolts passing through sleeves shall be used. Formwork spacers left in situ
shall not impair the desired appearance or durability of the structure by causing
spalling, rust staining or allowing the passage or moisture.
D.9.8.9 For liquid retaining structures sleeves shall not be provided for through bolts or shall
through bolts be removed if provided. The bolts, in the latter case, shall be cut at
mm depth from the surface and the hole made good by cement mortar of the same
proportion as the concrete just after striking the formwork.
D.9.8.10 Where specified or shown on drawings, all corners and angles exposed in the
finished structure shall have chamfers or fillets of 20 mm x 20 mm size.
D.9.8.11 Forms for substructure may be omitted when, in the opinion of Engineer, the open
excavation is firm enough (in hard non-porous soils) to act as a form. Such
excavations shall be slightly larger, as directed by Engineer, than that required as per
drawing to compensate for irregularities in excavation.
D.9.8.12 The Contractor shall provide adequate props carried down to a firm bearing without
overloading any of the structures.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.8.13 The shuttering for beams and slabs shall be so erected that the side shuttering of
beams can be removed without disturbing the bottom shuttering. If the shuttering for
a column is erected for the full height of the column, one side shall be built up in
sections as placing of concrete proceeds or windows left for placing concrete from
the side limit the drop of concrete to 1.0 m or as directed by Engineer. The
Contractor shall temporarily and securely fix items to be cast in (embedments /
inserts) in a manner that will not hinder the striking of forms or permit loss of grout.
D.9.8.14 Formwork showing excessive distortion, during any stage of construction, shall be
repositioned and strengthened. Placed concrete affected by faulty form work, shall
be entirely removed and formwork corrected prior to placement of new concrete at
the cost of the Contractor.
D.9.8.15 The striking time for formwork shall be determined based on following requirements
a) Development of adequate concrete strength;
b) Permissible deflection at time of striking form work;
c) Curing procedure employed – its efficiency and effectiveness;
d) Subsequent surface treatment to be done;
e) Prevention of thermal cracking at re-entrant angles;
f) Ambient temperature; and
g) Aggressiveness of the environment (unless immediate adequate steps are
taken to prevent damage to the concrete).
D.9.8.16 Under normal circumstances (generally where temperatures are above 20 Deg. C)
forms may be struck after expiry of the time period given in IS : 456, unless directed
otherwise by Engineer. For portland pozzolona / slag cement the stripping time shall
be suitably modified as directed by the Engineer. It is the Contractor’s responsibility
to ensure that forms are not struck until the concrete has developed sufficient
strength to support itself, does not undergo excessive deformation and resist surface
damage and any stressed arising during the construction period.
D.9.9 Reinforcement Workmanship
D.9.9.1 Reinforcing bars supplied bent or in coils shall be straightened cold without damage
at no extra cost. No bending shall be done when ambient temperature is below
Deg. C. Local warming may be permitted if steel is kept below 100 Deg. C.
D.9.9.2 All bars shall be accurately bent gradually and according to the sizes and shapes
shown on the drawings / schedules or as directed by Engineer.
D.9.9.3 Re-bending or straightening incorrectly bent bars shall not be done without approval
D.9.9.4 Reinforcement shall be accurately fixed and maintained firmly in the correct position
by the use of blocks, spacers, chairs, binding wire etc. to prevent displacement
during placing and compaction of concrete. The tied in place reinforcement shall be
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
approved by Engineer prior to concrete placement. Spacers shall be of such
materials and designs as will be durable, not lead to corrosion of the reinforcement
and not cause spalling of the concrete cover.
D.9.9.5 Binding wire shall be 16 gauge soft annealed wire. Ends of the binding wire shall be
bent away from the concrete surface and in no case encroach into the concrete cover.
D.9.9.6 Substitution of reinforcement, laps / splices not shown on drawing shall be subject to
Engineer’s approval.
D.9.10 TOLERANCES
D.9.10.1 Tolerance for formed and concrete dimensions shall be as per IS : 456 unless
specified otherwise.
D.9.10.2 Tolerances specified for horizontal or vertical building lines or footings shall not be
construed to permit encroachment beyond the legal boundaries.
D.9.11 PREPARATION PRIOR TO CONCRETE PLACEMENT
D.9.11.1 Before concrete is actually placed in position, the inside of the formwork shall be
cleaned and mould oil applied, inserts and reinforcement shall be correctly
positioned and securely held, necessary openings, pockets etc. provided.
D.9.11.2 All arrangements formwork, equipment and proposed procedure, shall be approved
by Engineer. The Contractor shall maintain separate Pour Card for each pour and
shall produce before commencement of concreting to Engineer-in-charge.
D.9.12 TRANSPORTING, PLACING AND COMPACTING CONCRETE
D.9.12.1 Concrete shall be transported from the mixing plant to the formwork with minimum
time lapse by methods that shall maintain the required workability and will prevent
segregation, loss of any ingredients or ingress of foreign matter or water.
D.9.12.2 In all cases concrete shall be deposited as nearly as practicable directly in its final
position. To avoid segregation concrete shall not be rehandled or caused to flow.
For locations where direct placement is not possible and in narrow forms. The
Contractor shall provide suitable drops and ‘Elephant Trunks’. Concrete shall not be
dropped from a height of more than 1.0 m as stipulated in clause D.9.8.13.
D.9.12.3 Concrete shall not be placed in flowing water. Under water, concrete shall be placed
in position by tremies or by pipeline from the mixer and shall never be allowed to
fall freely through the water.
D.9.12.4 While placing concrete the Contractor shall proceed as specified below and also
ensure the following :
a) Continuously between construction joints and predetermined abutments.
b) Without disturbance to forms or reinforcement.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
c) Without disturbance to pipes, ducts, fixings and the like to be cast in; ensure
that such items are securely fixed. Ensure that concrete cannot enter open
ends of pipes and conduits etc.
d) Without dropping in a manner that could cause segregation or shock.
e) In deep pours only when the concrete and formwork designed for this
purpose and by using suitable chutes or pipes.
f) Do not place if the workability is such that full compaction cannot be
g) Without disturbing the unsupported sides of excavations; prevent
contamination of concrete with earth. Provide sheeting if necessary. In
supported excavations, withdraw the lining progressively as concrete is
h) If placed directly onto hardcore or any other porous material, dampen the
surface to reduce loss of water from the concrete.
i) Ensure that there is no damage or displacement to sheet membranes.
j) Record the time and location of placing structural concrete.
D.9.12.5 Concrete shall normally be compacted in its final position within thirty minutes of
leaving the mixer. Concrete shall be compacted during placing with approved
vibrating equipment without causing segregation until it forms a solid mass free
from voids thoroughly worked around reinforcement and embedded fixtures and into
all corners of the formwork. Immersion vibrators shall be inserted vertically at
points not more than 450 mm apart and withdrawn slowly till air bubbles cease to
come to surface, leaving no voids. When placing concrete in layers advancing
horizontally, care shall be taken to ensure adequate vibration, blending and melding
of the concrete between successive layers. Vibrators shall not be allowed to come in
contact with reinforcement, formwork and finished surfaces after start of initial set.
Over vibration shall be avoided.
D.9.12.6 Concrete may be conveyed and placed by mechanically operated equipment after
getting the complete procedure approved by Engineer. The slump shall be held to
the minimum necessary for conveying concrete by this method. When concrete is to
be pumped concrete mix shall be specially designed to suit pumping. Care shall be
taken to avoid stoppages in work once pumping has started.
D.9.12.7 Except when placing with slip forms, each placement of concrete in multiple lift
work, shall be allowed to set for at least 24 hours after the final set of concrete
before the start of subsequent placement. Placing shall stop when concrete reaches
the top of the opening in walls or bottom surface of slab, in slab and beam
construction, and it shall be resumed before concrete takes initial set but not until it
has had time to settle as determined by Engineer. Concrete shall be protected
against damage until final acceptance.
D.9.13 MASS CONCRETE WORKS
D.9.13.1 Sequence of pouring for mass concrete works shall be as approved by Engineer. The
Contractor shall exercise great care to prevent shrinkage cracks and shall monitor the
temperature of the placed concrete if directed.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.14.1 Curing and protection shall start immediately after the compaction of the concrete to
protect it from :
(a) premature drying out, particularly by solar radiation and wind;
(b) leaching out by rain and flowing water;
(c) rapid cooling during the first few days after placing;
(d) high internal thermal gradients;
(e) low temperature of frost;
(f) vibration and impact which may disrupt the concrete and interfere with its
bond to the reinforcement.
D.9.14.2 All concrete, unless directed otherwise by Engineer, shall be cured by use of
continuos sprays or ponded water or continuously saturated coverings of sacking,
canvas, hessain or other absorbent material for the period of complete hydration with
a minimum of 7 days. The quality of curing water shall be the same as that used for
D.9.14.3 Where a curing membrane is directed to be used by the Engineer, the same shall be
of a non-wax base and shall not impair the concrete finish in any manner. The
curing compound to be used shall be got approved from the Engineer before use and
shall be applied with spraying equipment capable of a smooth, even textured coat.
D.9.14.4 Curing may also be done by covering the surface with an impermeable material such
as polyethylene, which shall be well sealed and fastened.
D.9.14.5 Extra precautions shall be exercised in curing concrete during cold and hot weather.
D.9.15 CONSTRUCTION JOINTS AND KEYS
D.9.15.1 Construction joints will be as shown on the drawing or as approved by Engineer.
Concrete shall be placed without interruption until completion of work between
construction joints. If stopping of concreting becomes unavoidable anywhere, a
properly formed construction joint shall be made with the approved of Engineer.
D.9.15.2 Dowels for concrete work, not likely to be taken up in the near future, shall be
coated with cement slurry and encased in lean concrete as indicated on the drawings
or as directed by Engineer.
D.9.15.3 Before resuming concreting on a surface which has hardened all laitance and loose
stone shall be thoroughly removed by wire brushing / hacking and surface washed
with high pressure water jet and treated with thin layer of cement slurry for vertical
joints and a 15 mm thick layer of cement sand mortar for horizontal layers, the ratio
of cement and sand being the same as in the concrete mix.
D.9.15.4 When concreting is to be resumed on a surface which has not fully hardened, all
laitance shall be removed by wire brushing, the surface wetted, free water removed
and a coat of cement slurry applied. On this a layer of concrete not exceeding
mm thickness shall be placed and well rammed against the old work. Thereafter
work shall proceed in the normal way.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.16 FOUNDATION BEDDING
D.9.16.1 All earth surfaces upon which or against which concrete is to be placed, shall be well
compacted and free from standing water, mud or debris. Soft or spongy area shall be
cleaned out and back filled with either soil cement mixture, lean concrete or clean
sand compacted as directed by Engineer. The surfaces of absorptive soils shall be
D.9.16.2 Concrete shall not be deposited on large sloping rock surfaces. The rock shall be cut
to form rough steps or benches by picking, barring or wedging. The rock surface
shall be kept wet for 2 to 4 hours before concreting.
D.9.17 FINISHES
D.9.17.1 General
D.9.17.1.1 The formwork for concrete works shall be such as to give the finish as specified.
The Contractors shall make good as directed any unavoidable defects consistent with
the type of concrete and finish specified; defects due to bad workmanship (e.g.
damaged or misaligned forms, defective or poorly compacted concrete) will not be
accepted. The Contractor shall construct the formwork using the correct materials
and to meet the requirements of the design and to produce finished concrete to
required dimensions, plumbs, planes and finishes.
D.9.17.2 Surface finish Type F1
D.9.17.2.1 This type of finish shall be for non-exposed concrete surface against which back fill
or concrete is to be placed. The main requirement is that of dense, well compacted
concrete. No treatment is required except repair of defective areas, filling all form
tie holes and cleaning up of loose or adhering debris. For surfaces below grade
which will receive waterproofing treatment the concrete shall be free of surface
irregularities which could interfere with proper and effective application or
waterproofing material specified for use.
D.9.17.3 Surface finish Type F2
D.9.17.3.1 This type of finish shall be for all concrete work which will be exposed to view upon
completion of the job. The appearance shall be that of a smooth dense, well-
compacted concrete showing the slight marks of well fitted shuttering joints. The
Contractor shall make good any blemishes.
D.9.17.4 Surface finish Type F3
D.9.17.4.1 This type of finish shall be for concrete work which will be exposed to view but to
give an appearance of smooth, dense, well-compacted concrete with no shutter
marks, stain free and with no discoloration, blemishes, arrises, air holes etc. Only
lined or coated plywood with very tight joints shall be used to achieve this finish.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
The panel size shall be uniform and as large as practicable. Any minor blemishes
that might occur shall be made good by Contractor.
D.9.17.5 Integral cement finish on concrete floor
D.9.17.5.1 In all cases where integral cement finish on a concrete floor has been specified, the
top layer of concrete shall be screened off to proper level and tamped with tamper
having conical projections so that the aggregate shall be forced below the surface.
The surface shall be finished with a wooden float and a trowel with pressure. The
finish shall be continued till the concrete reaches its initial set. No cement or cement
mortar finish shall be provided on the surface. Where specified, a floor hardener as
approved by the Engineer shall be supplied and used as recommended by the
D.9.18 REPAIR AND REPLACEMENT OF UNSATISFACTORY CONCRETE
D.9.18.1 Immediately after the shuttering is removed, all the defective areas such as honey-
combed surfaces, rough patches, holes left by form bolts etc. shall be brought to the
notice of Engineer who may permit patching of the defective areas or reject the
D.9.18.2 All through holes for shuttering shall be filled for full depth and neatly plugged flush
D.9.18.3 Rejected concrete shall be removed and replaced by Contractor at no additional cost
D.9.18.4 For patching of defective areas all loose materials shall be removed and the surface
shall be prepared as directed by the Engineer.
D.9.18.5 Bonding between hardened and fresh concrete shall be done either by placing
cement mortar or by applying epoxy. The decision of the Engineer as to the method
of repairs to be adopted shall be final and binding on the Contractor and no extra
claim shall be entertained on this account. The surface shall be saturated with water
for 24 hours before patching is done with 1:5 cement sand mortar. The use of epoxy
for bonding fresh concrete shall be carried out as directed by Engineer.
D.9.19 VACUUM DEWATERING OF SLABS
D.9.19.1 Where specified floor slabs, either on grade or suspended, shall be finished by
vacuum dewatering including all operations such as poker vibration, surface
vibration, vacuum processing, floating and trowelling as per equipment
manufacturers recommendation. The equipment to be used shall be subject to
Engineer’s approval.
D.9.20 HOT WEATHER REQUIREMENTS
D.9.20.1 Concreting during hot weathers shall be carried out as per IS : 7861 (Part – I)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.20.2 Adequate provisions shall be made to lower concrete temperatures which shall not
exceed 40 Deg. C at the time of placement of fresh concrete.
D.9.20.3 Where directed by Engineer, Contractor shall spray non-wax based curing
compound of unformed concrete surfaces at no extra costs.
D.9.21 COLD WEATHER REQUIREMENTS
D.9.21.1 Concreting during cold weather shall be carried out as per IS : 7861 (Part-II).
D.9.21.2 The ambient temperature during placement and upto final set shall not fall below
Deg. C. Approved antifreeze / accelerating additives shall be used where directed.
D.9.21.3 For major and large scale concreting works the temperature of concrete at times of
mixing and placing, the thermal conductivity of the formwork and its insulation and
stripping period shall be closely monitored.
D.9.22 LIQUID RETAINING STRUCTURES
D.9.22.1 The Contractor shall take special care of concrete for liquid retaining structures,
underground structures and those others specifically called for to guarantee the finish
and water tightness.
D.9.22.2 The minimum level of surface finish for liquid retaining structures shall be type F2.
All such structures shall be hydro-tested.
D.9.22.3 The Contractor shall include in his price of hydro-testing of structure, all
arrangements for testing such as temporary bulk heads, pressure gauges, pumps,
D.9.22.4 Any temporary arrangements that may have to be made to ensure stability of the
structures shall also be considered to have been taken into account while quoting the
D.9.22.5 Any leakage that may occur during the hydro-test or subsequently during the defects
liability period or the period for which the structure is guaranteed shall be effectively
stopped either by cement / epoxy pressure grouting, guniting or such other methods
as may be approved by the Engineer. All such rectification of the Client / Engineer
at no extra cost to the Client.
D.9.23 TESTING CONCRETE STRUCTURES FOR LEAKAGE
D.9.23.1 Hydro-static test for water tightness shall be done at full storage by Engineer, as
described below :
D.9.23.1.1 In case of structures whose external faces are exposed, such as elevated tanks, the
requirements of the test shall be deemed to be satisfied if the external faces show no
sign of leakage or sweating and remain completely dry during the period of
observation of seven days after allowing a seven day period for absorption after
filling with water.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.23.1.2 In the case of structures whose external faces are submerged and are not accessible
for inspection, such as underground tanks, the structures shall be filled with water
and after the expiry of seven days after the filling, the level of the surface of the
water shall be recorded. The level of water shall be recorded again at subsequent
intervals of 24 hrs. over a period of seven days. Backfilling shall be withheld till the
tanks are tested. The total drop in surface level over a period for seven day shall be
taken as an indication of the water tightness of the structure. The Engineer shall
decide on the actual permissible nature of this drop in the surface level, taking into
account weather the structures are open or closed and the corresponding effect it has
on evaporation losses. Unless specified otherwise, a structure whose top is covered
shall be deemed to be water tight if the total drop in the surface level over a period of
seven days does not exceed 40 mm.
D.9.23.1.3 Each compartment / segment of the structure shall be tested individually and then all
D.9.23.2 For structures such as pipes, tunnels etc. the hydro-static test shall be carried out by
filling with water, after curing as specified, and subjecting to the specified test
pressure for specified period. If during this period the loss of water does not exceed
the equivalent of the specified rate, the structure shall be considered to have
successfully passed the test.
D.9.24 OPTIONAL TESTS
D.9.24.1 If Engineer feels that the materials i.e. cement, sand coarse aggregates,
reinforcement and water are not in accordance with the specifications or if specified
concrete strengths are not obtained, he may order tests to be carried out on these
materials in laboratory, to be approved by the Engineer, as per relevant IS Codes.
Client shall pay only for the testing of material supplied by the Client, otherwise
Contractor shall have to pay for the tests. Transporting of all material to the
laboratory shall however be done by the Contractor at no extra cost to Client.
D.9.24.2 In the even of any work being suspected of faulty material or workmanship requiring
its removal or if the works cubes do not give the stipulated strengths, Engineer
reserves the right to order the Contractor to take out cores and conduct tests on them
or do ultrasonic testing or load testing of structure, etc. All these tests shall be
carried out by Contractor at no extra cost to the Client. Alternatively Engineer also
reserves the right to ask the Contractor to dismantle and re-do such unacceptable
work at the cost of Contractor.
D.9.24.3 If the structure is certified by Engineer as having failed, the cost of the test and
subsequent dismantling / reconstruction shall be borne by Contractor.
D.9.24.4 The quoted unit rates / prices of concrete shall be deemed to provide for all tests
mentioned above.
D.9.25 GROUTING
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.25.1 Grout shall be provided as specified on the drawings. The proportion of standard
Grout shall be such as to produce a flowable mixture consistent with minimum water
content and shrinkage. Surface to be grouted shall be thoroughly roughened and
cleaned. All structural steel elements to be grouted, shall be cleaned of oil, grease,
dirt etc. The use of hot, strong caustic solution for this purpose will be permitted.
Prior to grouting, the hardened concrete shall be saturated with water and just before
grouting water in all pockets shall be removed. Grouting once started shall be done
quickly and continuously. Variation in grout mixes and procedures shall be
permitted if approved by ENGINEER. The grout proportions shall be limited as
Use Grout Thickness Mix Proportions W/C Ratio
a) Fluid mix Under 25 mm One part Portland
cement to one part
b) General 25 mm and over but One part Portland
Mix less than 50 mm cement to 2 part sand.
c) Stiff mix 50 mm and over One part Portland
cement to 3 part sand.
D.9.25.2 Non Shrink Grout
D.9.25.2.1 Non-shrink grout where called for in the Schedule of Quantities or specified on the
drawings shall be provided in strict accordance with the manufacturer’s instructions/
specifications on the drawings.
D.9.26 INSPECTION
D.9.26.1 All materials, workmanship and finished construction shall be subject to continuous
inspection and approval of Engineer. Materials rejected by Engineer shall be
expressly removed from site and shall be replaced by Contractor immediately at no
extra cost to Client.
D.9.27 CLEAN-UP
D.9.27.1 Upon the completion of concrete work, all forms, equipment, construction tools,
protective coverings and any debris, scraps of wood etc. resulting from the work
shall be removed and the premises left clean.
D.9.28 ACCEPTANCE CRITERIA
D.9.28.1 Any concrete work shall satisfy the requirements given below individually and
collectively for it to be acceptable.
a) Properties of constituent materials;
b) Characteristic compressive strength;
c) Specified mix proportions;
d) Minimum cement content;
e) Maximum free-water / cement ratio;
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
f) Workability;
g) Temperature of fresh concrete;
h) Density of fully compacted concrete;
i) Cover to embedded steel;
k) Tolerances in dimensions;
l) Tolerances in levels;
n) Surface finishes;
o) Special requirements such as :
i) water tightness;
ii) resistance to aggressive chemicals
iii) resistance to freezing and thawing
iv) very high strength
v) improved fire resistance
vi) wear resistance
vii) resistance to early thermal cracking
D.9.28.2 The Engineer’s decision as to the acceptability or otherwise of any concrete work
shall be final and binding of the Contractor.
D.9.28.3 For work not accepted, the Engineer may review and decide whether remedial
measures are feasible so as to render the work acceptable. The Engineer shall in that
case direct the Contractor to undertake and execute the remedial measures. These
shall be expeditiously and effectively implemented by the Contractor. Nothing extra
shall become payable to the Contractor. Nothing extra shall become payable to the
Contractor by the Client for executing the remedial measures.
D.9.29 MODE OF MEASUREMENT AND PAYMENT
D.9.29.1 The unit rate for concrete work under various categories shall be all inclusive and no
claims for extra payment on account of such items as leaving holes, embedding
inserts, etc. shall be entertained unless separately provided for in the schedule of
quantities. No extra claim shall also be entertained due to change in the number,
position and / or dimensions of holes, slots or openings, sleeves, inserts or on
account of any increased lift, lead of scaffolding etc. All these factors should be
take into consideration while quoting the unit rates. Unless provided for in the
Schedule of Quantities the rates shall also include fixing insets in all concrete work,
whenever required.
D.9.29.2 Payments for concrete will be made on the basis of unit rates quoted for the
respective items in the Schedule of Quantities. No deduction in the concrete
quantity will be made for reinforcements, inserts etc. and opening less than 0.100 of
a sq.m in areas where concrete is measured in sq.m and 0.010 cu.m where concrete
is measured in cu.m. Where no such deduction for concrete is made, payment for
shuttering work provided for such holes, pockets, etc. will not be made. Similarly
the unit rates for concrete work shall be inclusive or exclusive of shuttering as
provided for in the Schedule of Quantities.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.29.3 Payment for beams will be made for the quantity based on the depth being reckoned
from the understood of the slabs and length measured as the clear distance between
supports. Payment for columns shall be made for the quantity based on height
reckoned upto the underside of slab / beams.
D.9.29.4 The unit rate for precast concrete members shall include formwork, mouldings,
finishing, hoisting and setting in position including setting mortar, provision of
lifting arrangement etc. complete. Reinforcement and inserts shall be measured and
paid for separately under respective item rates.
D.9.29.5 Where the formwork is paid for separately, it shall be very clearly understood that
payment for formwork is inclusive of formwork, shuttering, shoring, propping
scaffolding etc. complete. Only the net area of concrete formed (shuttered) shall be
measured for payment. Unless otherwise stated clearly form work will not be paid
separately and it is deemed to beam included in the respective concrete item.
Under remarks indicate deviations from drawings & specifications congestion
in reinforcement if any unusual occurrences such as failure of equipment
sinking of supports / props, heavy rain affecting reasonable. Poor compaction
improper curing other deficiencies observations etc.
D.9.30 MATERIALS : STRUCTURAL STEEL
All structural steel shall be comply with the requirements of IS 226-1961 and
structural steel work IS 1915-1962 specifications for structural steel appropriate for
D.9.30.1 Steel for Pins and Rollers
Rolled steel pins and rollers, shall comply with requirements of the IS specifications
appropriate for the work. Steel casting for cast steel pins shall conform to grade 1 or
3 of IS 1030-1956 specifications for steel casting (for general engineering purposes
as appropriate).
D.9.30.2 Bolts and Nuts
Mild steel for bolts and nuts when tested shall comply with IS 1608-1960 and shall
have tensile strength of not less than 2500 Kg/cm 2. Plain washers shall be made of
D.9.30.3 Welding Electrode
Mild steel electrodes shall comply with requirements of IS 814-1957 specification
for covered electrodes for metal arc welding of mild steel.
D.9.30.4 Workmanship
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
All work shall be in accordance with the drawings and shall satisfy IS specification
No. 1915-1961. Care shall be taken to ensure that all parts in assembly fit accurately
together. Notes or specifications on the drawings supplied by the Engineer-in-
Charge/consulting Engineer, are to be constructed as superseding or cancelling any
clause of this specifications with which they conflict. On all drawings dimensions
shown in figures shall be acted in preference to measurement by scale.
D.9.30.5 Straightening
All structural steel members and parts shall have straight edges. All straightening
shaping and levelling etc. shall be done by pressure only and not by hammering. All
joggles and knees shall be formed by pressure and where practicable in making
these, the metal shall not be cut and welded.
D.9.30.6 Cutting
All structural steel parts where required shall be sheared, cropped sawn or flame cut
and ground accurately to the required dimensions and shape.
D.9.30.7 Bolts Holes
The diameter of bolts holes shall be 1.5 to 2.0 mm. larger than the nominal diameter
of bolt. All holes for bolts shall be drilled unless permitted by Engineer-in-Charge
for punching the holes. Care shall be taken, such as surrounding material is not
deformed or damaged in case of punching the hole is allowed.
D.9.30.8 Welding
Welding of steel conforming to relevant IS specifications shall be in accordance with
general requirements of metal arc welding. In additional to general requirement, the
following care shall be taken :-
(a) The welding shall be positioned for downward welding wherever practicable.
(b) The welding current shall conform with respect of voltage and empeare to the
recommendations of the manufacturers of the electrode being used. The arc
length, voltage and empeare shall be suited to the thickness of material, type
of groove and other circumstances of the work.
(c) The surface to be welded and surrounding material for a distance of atleast
mm shall be free from scale, dirt, grease, paint, heavy rust or other surface
(d) Members to be welded shall be held in correct position by holes, clamps,
wedges, jigs or other suitable devices or by tack welding until welding has
been completed, such fastening as may be used shall be adequate to ensure
safety. Suitable allowance shall be made for war page and shrinkage.
(e) Tack welds located where the final welds will later be made shall be subject to
the same quality requirements as final welds. Defective and broken tack welds
shall be removed before final welding.
(f) Fusion faces shall be made or cut by shearing, chipping, machining or by gas
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
(g) Exposed faces of welds shall be made reasonably smooth and regular so as to
conform as closely as practicable to design requirements and shall not be of
less than the required cross section.
(h) Finished welds and adjacent parts shall be protected with clean boiled linseed
oil after all slag has been removed.
D.9.30.9 Safety Precautions
D.9.30.9.1 (a) Operators of welding and cutting equipment shall be protected from the rays of
the arc flame gloves and by helmet, hand shields, or goggles equipped with
suitable filter lenses.
(b) Closed space shall be ventilated properly while welding is being gone therein.
(c) Welders should be provided with such staging as will enable them to perform
the welding operation. For site welding shelter should be provided to protect
welders and the parts to be welded from the weather.
D.9.30.9.2 The Constructor shall employ a competent welding supervisor to ensure that the
standard of workmanship and the quality of materials comply with requirements laid
in these specification.
D.9.30.9.3 The Constructor shall provide free access to the representative of Engineer-in-
Charge/Consulting Engineer to the work being carried out at all reasonable times and
facilities shall be provided so that during the course of welding he may be able to
inspect any layer of weld metal. He shall be at liberty to reject any material that does
not conform to the terms of the specifications and to require any defective welds to
be cut out and welded. The representative of the Engineer-in-Charge/Consulting
Engineer shall be notified in advance of any welding operations.
D.9.30.9.4 Inspection and testing of welds shall be done as laid down in IS 822 and IS
D.9.30.9.5 No welder shall be employed in any position expect those who are fully qualified to
welding. Qualification for welders shall be as laid down in IS
D.9.30.10 Joints
All steel work intended to be bolted together must be in contact over the whole
surface. Joints which have to take compressive stress and the ends of all stiffeners
shall meet truly over the whole of the butting surface.
D.9.30.11 Assembling
All member shall be so arranged that they can be accurately assembled, without
being unduly packed, strained or forced into position and when built shall be true
and free from twist kinks, buckets or open joints between component pieces. Work
shall be kept properly bolted together and no drifting shall be allowed except for the
purpose of drawing assembled sections together in accuracy’s in matching of holes
may be corrected. But drifting to enlarge holes is prohibited. Failure in any of the
above respect will involve the rejection of defective members.
D.9.30.12 Mode of Measurement and Payment
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
D.9.30.12.1 Measurement of this item shall be as per IS 1200(Part VIII) - 1974 or as per its latest
revision so far as applicable.
D.9.30.12.2 The contract rate shall be suitable for unit of one metric tonne of structural steel.
D.9.31 MATERIALS : REINFORCEMENT
D.9.31.1 Specification for TMT bars reinforcement (Fe-500)
D.9.31.1.1 Scope of work :
The scope of work consists of providing and laying mild steel reinforcement and
TMT reinforcement for RCC works of various components of the structure. This
may be of Tiscon, Sulekhram, SAIL or Punjab Rolling Mill or any other
approved make. This includes cuttings, bending, binding, placing, with all
equipments and labour required for the work as directed by the Engineer-in-charge
and all operations covered within the intent and purpose of the specification.
D.9.31.1.2 Bending of Reinforcement :
Reinforcing steel shall conform accurately to the dimensions shown on relevant
drawings and conforming to the relevant IS codes (latest revision)
Bars shall be bent cold to the specified shape and dimensions or as directed by the
Engineer-in-charge using a proper bar bender, operated by hand or power to attain
proper radii of bends.
Bars shall not be bent or strainghened in a manner that will cause injury to the
Bars bent during transport or handling shall be straightened before being used on
work; they shall not be heated to facilitate bending.
The bending of the TMT bars shall be carried out as per the following :
Sr. No. Operation Size TMT Fe-500
1 Bend Upto 22 mm dia. 3d
Over 22 mm dia. 4d
2 Rebend Upto 10 mm dia. 4d
Over 10 mm dia. 5d
D.9.31.1.3 Placing of Reinforcement :
All reinforcing bars shall be accurately placed in the exact position shown on the
drawings, and shall be securely held in position during placing of concrete by
annealed binding wire not less than 1 mm. in size and conforming to IS : 280 and by
using stays blocks or metal chairs, spacer, metal hangers, supporting wires or other
approved devices at sufficiently close intervals. Bars will not be allowed to sag
between supports nor displaced during concreting or any other operation over the
work. All devices used for positioning shall be of noncorrodible material. Wooden
and metal supports will not extend to the surface of concrete, except where shown on
the drawings, Placing bars on layers of freshly laid concrete as the work progresses
for adjusting bar spacing will not be allowed. Pieces of broken stone, brick or
wooden blocks shall not be used. Layers of bars shall be separated by spacer bars,
precast mortar blocks or other approved devices.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Reinforcement after being placed in position shall be maintained in a clean condition
until completely embedded in concrete. Special care shall be exercised to prevent
any displacement of reinforcement in concrete already placed.
To protect reinforcement from corrosion, concrete cover shall be provided as
indicated on the drawings. All bars protruding from concrete to which other bars are
to be spliced and which are likely to be exposed for an indefinite period shall be
protected by a thick coat of neat cement grout.
In the case of columns and walls, vertical bars shall be kept in normal position with
timber templates having slots accurately cut in for bar position. Such templates shall
be removed after the concreting has progressed upto a level just below them.
Bars crossing each other, where required, shall be secured by binding wire
(annealed) of size not less than 1 mm and conforming to IS : 280 in such a manner
that they do not slip over each other at the time of fixing and concreting. As far as
possible, bars of full length shall be used. In case this is not possible, overlapping of
bars shall be done as directed by the Engineer-in-charge. When practicable,
overlapping bars shall not touch each other, but be kept apart by 25 mm or 1 1/4
times the maximum size of the coarse aggregates whichever is greater, by concrete
between them. Where this is not feasible, overlapping bars shall be bound with
annealed steel wire, not less than 1mm thickness twisted tight in eight shape around
the lapped bars. The overlaps shall be staggered for different bars and located at
fixed locations only along the span where neither shear nor bending moment is
D.9.31.1.4 Welding of Bars
Welding of TMT bars can be permitted if specified on the drawings, joints of
reinforcement bars shall be butt welded so as to transmit their full strength. Welded
joints shall preferably be located at points where steel will not be subject to more
than 75 percent of the maximum permissible stresses and welds so staggered that at
any one section, not more than 33 per cent of the rods are welded. No pre-warming
or post heat treatment is necessary. Interpass temperature should be limited to 200 oC
with low heat input and equivalent strength low hydrogen type electrode. Suitable
means shall be provided for holding the bars securely in position during welding. It
must be ensured that no voids are left in welding and when welding is done in 2 or
stages, previous surface shall be cleaned property. Ends of the bars shall be cleaned
of all loose scale, rust. grease, paint and other foreign matter before welding. Only
competent welders shall be employed on the work.
Welded pieces of reinforcement shall be tested. Specimens shall be taken from the
actual site and their number and frequency of tests shall be as directed by the
Engineer-in-charge.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
Trimix with dewatering machine:-
Trimix with dewatering machine and floater machine on constructed RCC work incl.cost
of machine and labour etc comp as directed.
Making 15 mm groove in RCC work
Making 15 mm groove in RCC work on road and filling it with polysulfied selant and
finished it good incl.all labour charges etc comp as directed.
Panel shall be fixed by providing grooves in the style and rails. The styles and rails
shall be joined to each other by mortise and tenon joints at right angles.
An air space of 1.5 mm shall be left in the groove of frame shutter while fixing the
Conctractor's Signature Addi. City Engineer
Address & Mobile no. (North Zone)
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
AHMEDABAD MUNICIPAL CORPORATION
FORM OF BID AND APPENDIX TO BID
FORM 1 - BID SECURITY (BANK GUARANTEE)
(Hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the term and conditions of tender for the work
1. Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to total
rupees………………..(in words............................................) Rs. (in figures) and we undertake to
pay to Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad. Specified tip to his
first written demand, without demur without delay and without the necessary of a previous of
judicial or administrative procedures and without the necessity of a previous of judicial or
administrative procedures and without the necessity to prove to the Bank the defects or short
comings or debits of the contractor any sum within the limit of Rs.....................................................
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during
the period that would be taken for the acceptance of tender. However unless a demand of claim
under this guarantee is made on its in writing on or before the (Date to be specified will not be less
than 120 days from the stipulated date of receiving the tender) we shall be discharge from all
liabilities under the guarantee thereafter
3. We undertake not to revoke the guarantee during it currency except with the previous
consent of the Municipal Commissioner, Ahmedabad Municipal Corporation, A' bad in
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the
Tenderer or of the Bank.
Signature & Seal of Guarantor ...........................
5. The contractors shall have to furnish income tax clearance certificate before his tender is
accepted and intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
7. List of approved banks - .As per
Seal and Signature of the Bidder Addi.. City Engineer
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
FORM -2 PERFORMANCE GUARANTEE BOND
(BANK GUARANTEE)
(Clause 37 of Section I Volume 1)
Awarded a contract dated_ __________________for Supplying Bore Operator and Valve
Operator in Existing Available Bore in Sarspur Rakhiyal Ward of North Zone.(ARC)
. as specified in the tender by the Ahmedabad Municipal Corporation.
Whereas the said M/s __________________________________________has approached Us
___________________________________________Bank to provided a PERFORMANCE
GUARANTES BOND to the AMC for the work undertakes by M/s.
agreed to provided such a PERFORMANCE GUARANTEE BOND. Now therefore, we the_
______________________Bank provided the following Performance Bank, Guarantee by way of
these Bond to the AMC.
1. The contract value of the contract provided to M/s. _____________________by the AMC in Rs.
_ __________. This guarantee in the nature of PERFORMANCE GUARANTEE is provided so as
to ensure and indemnify the AMC for full and proper performance of the contract by
the _______________________________Bank hereby indemnify the AMC for all losses and / or
damages to the road surface which would be laid or resurface by M/s.________________________
and such PERFORMACE GUARANTEE would include any damage to hot mixes, dense
bituminous macadam asphalt, concrete, seal coat, concrete blocks, road markings, signage, steel
structures which may be suffered by the AMC as a result of defective production of mixes, because
of poor workmanship, or at all, by way of this bond, we the
_________________________________Bank agree and promises that in the eventuality of the
contractors M/s. __________________________________________not repairing or remeding the
Problem, loss or damage to the road surface we shall indemnify and pay the AMC such expenses,
losses and damages that may be incurred by the AMC, as a result of the AMC getting the work
done itself or from the other source.
2. We _______________________________ Bank agree and understand that the decision as to
whether any losses or damages to the project have taken place or not and / or whether the work
suffers from poor workmanship or not will be taken by the Commissioner of AMC and on the
Commissioner's decision regarding such losses or damages or defect whatsoever being so notified
by the AMC to us, We shall immediately take steps and ensure that
M/s.__________________________________ faithfully and diligently carry out the necessary
remedial steps to the full satisfaction of the Commissioner of the AMC. The opinion of the
Commissioner as to whether full and complete remedial steps, to the full satisfaction the
Commissioner of the AMC has been taken or not, will be that of the AMC. For the purpose, of
arriving at such decision as aforesaid it will be open to the Commissioner of the AMC in case he so
desires, to delegate this power to subordinate like the city Engineer to take appreciate decision and
the decisions referred to above will be deemed to be properly take and as if taken by the
Commissioner of the AMC. In the eventually of M/s.______________ not taking remedial
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
action to the almost satisfaction of the Commissioner of AMC. The AMC will be entitled to get the
work done itself or from sources. On the Commissioner of the AMC notifying to us the total
expenses incurred for this purpose. We hereby expressly have under taken to pay the AMC the said
amount forth with and in any case not less than 7 days from taken to pay the AMC the said binding
the amount indicted by the Commissioner of the AMC and our obligation to pay such amount will
be continuing of the AMC and our obligation irrespective of any dispute of differences that may
arise between us and M/s. _____________________________ of between the AMC and M/s.
3. The contract value is Rs. __________________________. This PERFORMANCE GURANTEE
is limited to 5% of the said contract value and accordingly it comes to Rs.
_______________________ our liability will be in all cases be limited to Rs._________________.
4. We agree and undertake that this PERFORMANCE GURANTEE will be valid for a period of
five years and one month from the date when the contract work is completed by the
M/s._____________________________________. The Commissioner of the AMC notify such
completion that to us. In case, no such completion it is notified, this performance guarantee will be
a valid from five years from the date of execution of this agreement. The Performance Guarantee
will come into effect from such completion date. In case however, the contract of several parts it
will be opened to the Commissioner to indicate separate completion dates for separate part and to
simultaneously indicate a break up of the contract value equivalent to the separate part. In which
case the PERFORMANCE GUARNATEE to extent of the different completion dates. It is
expressly understood that the considering this period of five years and one month, the date by
which the Corporation, intimate the Bank about the losses, damages or problems as the case may
be, shall be considered as long as such intimation is within a period of five years and one month
from the completion date. We the ___________________ Bank will be liable, irrespective of
whether the remedial actions or lack thereof has taken place after the period of the five years and
5. We _________________________________ Bank agree that the PERFORMANCE
GUARANTEE which is continuing guarantee will be binding, and enforceable against us
irrespective of any difference / disputes between the AMC and M/s.
and irrespective of any change or variation or execution time or any forbearance or waiver made or
6. In case any disputes arise as to the interpretation or implementation or implementation of this
PERFORMANCE GUARANTEE, the matter shall be referred to the sole arbitration of he
Commissioner of AMC whose decision in the matter will be final. In case any resource to any court
of law is necessitated, the appropriate Civil Court in the Ahmedabad along will have Jurisdiction.
Date: Signature of Contractor
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
FORM 3 - FORM OF AGREEMENT
THIS AGREEMENT made the ____ day of _______, 20__ between Ahmedabad Municipal
Corporation ………………..(here in after called “the Employer”) of the one part and
____________________________________________ (here in after called “the Contractor”) of the
WHEREAS the Employer is desirous that certain works should be executed by the Contractor, viz.
____________________________________________ and has accepted the bid by the contractor
for the execution and completion of such works and the remedying of any defects therein at a
contract price of Rs.______________ (Rupees _________________
NOW THIS AGREEMENT WITNESSETH as follows:
1. In this Agreement, words and expressions shall have the same meanings as are respectively
assigned to them in the Conditions of Contract hereinafter referred to.
2. The following documents shall be deemed to form and be read and construed as part of
this Agreement, viz.:
a) the Letter of Acceptance;
b) the General Conditions
c) The Financial Condition
d) the Technical Specifications;
e) the Priced Bill of Quantities; and
f) other documents forming part of the contract.
3. In consideration of the payments to be made by the Employer to the Contractor as here in after
mentioned, the Contractor hereby covenants with the Employer to execute and complete the Works
and remedy any defects therein in conformity in all respects with the provisions of the Contract.
4. The Employer hereby covenants to pay the Contractor in consideration of the execution and
completion of the Works and the remedying of defects therein the Contract Price or such other sum
as may become payable under the provisions of the Contract at the times and in the manner
prescribed by the Contract. IN WITNESS whereof the parties hereto have caused this Agreement to
be executed the day and year first before written.
Signed, sealed, and delivered by the said Employer and the Contractor in the presence
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
On behalf of Ahmedabad Municipal
On behalf of M/s.
Binding Signature of the Employer:
Binding Signature of the Contractor:
Sample Form for updating - qualification information
ltu^ :- vhevºt lk-28 <&t ltKktFt<t vhevºt lk 31 <t.7/7/2017 îtht <t.1/7/2017 vAe
cnth vtzJtbt ytJuj/ytJlth xuLzhbt (bxehegÕm + juch mÃjtg mt&u)G.S.T lt ltuxeVefuNl
bwscG.S.T sgt jtdw vz<tu ntug ðgt mœh nw ftblt cezhuG.S.T ltuxeVefuNl bwscle
yuÃjefucujexe ægtlbt htFe xuLzhlwk cezekd fhJtlw hnuNu.
(1) Conditional tenders will not be accepted in any case. Municipal Commissioner reserves the rights
to reject any or all the tenders without assigning any reasons thereof.
(2) The authorized signatory holding Power of Attorney shall only be the Digital Signatory. In case
authorized signatory holding Power of Attorney and Digital Signatory are not the same, the bid
shall be considered non-responsive.
(3)Circular no.32 of Finance department for GST is Applicable.
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
APPLICABILITY OF PROVIDEND FUND AND MISCELLANEOUS PROVISIONS ACT
Successful bidder i.e. the agency whose tender is accepted by the AMC shall have to comply the
necessary formalities under the employees provided fund and Miscellaneous Provisions Act,
as Contributory Provident Fund Scheme is applicable to labourers engaged in construction activity
and shall have to submit proofs regarding deduction of provident fund and other dues and
depositing the same with government department under the act and the scheme regularly on
monthly basis failing which no running / final bill payment will be made by the AMC to the
contractor in any circumstances.
A certificate to the above effect has to be given by the contractor as under.
Declaration of Depositing Provident Fund contribution
This to certify that we have deducted the employees’
P.F. and deposited the same along with employer’s contribution towards provident fund on labour
charges / wages paid by us to the labourers engaged for the work of
Authority under our Provident Fund Code No.___________
We produce herewith the copies of the challans for the provident fund deduction and
contribution deposited as mentioned above.
(Signed by an Authorized Representative of the Firm)
Name of the Representative
To be notarized by Notary
AHMEDABAD MUNICIPAL CORPORATION VOL.-I
mkœCo :- ltKtk Ft<&t 23 <&t rcjfjtfo©elu sKtJJtbtk ytJu Au fu, rmfgwrhxe zevtuÍex <&t R.yub.ze. MJYvbtk MJefthJtbtk
ytJNu. xuLzhekd ytu&tuhexe îtht cukf duhkxele ytu&uLxemexele aftmKe fhelu sYrhgt< bwsclt fLx[tuj «tumesh muxyv fhJtlt
hnuNu. <&t ybœtJtœ rmJtglt yLg Nnuhle ntug ylu < mkœCobtk sKtJuj vrhvºttule yLg < hnuNu.
A. Guarantees issued by following banks will be accepted as SD/EMD on permanent basis. All
nationalized Banks ™týtk ¾t‚w, ËhfÞw÷h ™kƒh : 41 ‚the¾ : 08/02/2022. B. Guarantees
issued by following banks will be accepted as SD/EMD for the period up to March-
2022. The validity cut-off date in the GR is with respect to the date of issue of Bank
Guarantee irrespective of the date of termination of Bank Guarantee. 1 Commercial Banks :-
1. RBL Bank 2. Axis Bank 3. ICICI Bank 4. HDFC Bank 5. Kotak Mahindra Bank
IndusInd Bank 7. DCB Bank 8. Tamilnadu Mercantile Bank 9. Ujjivan Small Finance Bank
10. A U Small Finance Bank 11. Federal Bank 12. Equitas Small Finance Bank 13. Bandhan
Bank 14. Standard Chartered Bank 15. City Union Bank 16. Yes Bank 2 Co-operative and
Rural Banks Of Gujarat :- 1. The Mehsana Urban Co-operative Bank Ltd 2. The
Ahmedabad Mercantile Co-Operative Bank Ltd 3. Nutan nagrik Sahakari Bank Ltd
Kalupur Commerical Co-operative Bank Ltd 5. Rajkot Nagarik Sahakari Bank Limited
The Gujarat State Co-Operative Bank 7. Sarswat Bank 8. Saurashtra Gramin Bank
mne: aeV yuftWLxLx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
VOL-1 Tender 19.pdf
VOL-2 19 Bore Oprator.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .