Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹7.0 Laccepted-aoc | accepted-aoc |
Tender Value
₹7.1 L
EMD Value
₹7,070
Closing Date
24 Apr 2026, 1:30 pmClosed
SRI VARA SIDDI VINAYAKA SWAMY DEVASTHANAM, KANIPAKAM, CHITTOOR DIST
Kanipakam
Providing water pipe lines to newly constructed OHST & sumps at coconut parking, Vinayaka sadan Dormitory and EO quarters belongs to SVVSD
924995
SSVVSD-EQ1/110/2026
OPEN - NCB
Civil Works
CHITTOOR
7 documents required · 7 mandatory
₹251
₹7,070
9 May 2026
20 Apr 2026
20 Apr 2026
Cost of 75 mm dia 6 Kg/cm2 PVC pipes
Earth work excavation for pipe line trences (2/3 machinery and 1/3 manual) in all soils except rocky soils including lowering, laying and jointing of pipes with required fittings/specials true to alingment and gradient, refilling with already excavated earth, watering, tamping and removing surplus earth and testing to required hydraulic test pressure etc. complete excluding cost of specials/fittings for finished item of work.1 Rmt for 75mm dia Pipe
Cost of 90mm dia 6 Kg/cm2 PVC pipes
Earth work excavation for pipe line trences (2/3 machinery and 1/3 manual) in all soils except rocky soils including lowering, laying and jointing of pipes with required fittings/specials true to alingment and gradient, refilling with already excavated earth, watering, tamping and removing surplus earth and testing to required hydraulic test pressure etc. complete excluding cost of specials/fittings for finished item of work.1 Rmt for 90mm dia Pipe
Cost of 110 mm dia 6 Kg/cm2 PVC pipes
Earth work excavation for pipe line trences by manual in all soils except rocky soils including lowering, laying and jointing of pipes with required fittings/specials true to alingment and gradient, refilling with already excavated earth, watering, tamping and removing surplus earth and testing to required hydraulic test pressure etc. complete excluding cost of specials/fittings for finished item of work.1 Rmt 110 mm dia Pipe
Dismantling, clearing away and carefully stacking useful materials for re-use and disposal of unserviceable materials with 100m lead as directed by Executive Engineer duly taking actual premeasurements before dismantling including all labour charges , overheads & contractor profit etc., complete finished item of work
Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice
Supply and Laying NP 3 class RCC hume pipe plain ended of following sizes for laying at the road crossings for the UG cables.
Filling foundation trenches with good carted sand from approved quarry in layers not exceeding 150 cm, watering and ramming including cost and conveyance of water to worksite and all operational,incidental, labour charges etc., complete for finished item of work.
Cost of PVC Specials
75 mm dia PVC Gatevalve
90 mm dia PVC Gatevalve
110 mm dia PVC Gatevalve
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Water pipe line BOQ.xlsx
TENDER_DOCUMENT • 0.01 MB
Water pipe line conditions.doc
TENDER_DOCUMENT • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .