Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | L1 | Accepted-AOC APPROVED AS PER PR NO 3/1 DTD 14 08 2023 | |
| 2 | L2₹5.9 L+₹23,586.97 (4.17%)Rejected-AOC | L2 | Rejected-AOC SECOND LOWEST | |
| 3 | L3₹6.0 L+₹35,847.35 (6.34%)Rejected-AOC | L3 | Rejected-AOC THIRD LOWEST | |
| 4 | L4₹6.4 L+₹74,506.20 (13.2%)Rejected-AOC GAFOOR P | L4 | Rejected-AOC FORTH LOWEST | |
| 5 | L5₹6.9 L+₹1.2 L (21.9%)Rejected-AOC | L5 | Rejected-AOC FIFTH LOWEST |
Tender Value
₹7.0 L
EMD Value
₹17,572
Closing Date
4 Aug 2023, 6:00 pmClosed
ASSISTANT ENGINEER
MELADY BP
DRAINAGE WORK
2023_LSGD_590348_1
Annual Plan-2023-24_KALANKOLY THODE KEEZHARIYUR GR
Open Tender
Civil Works - Others
Item Rate
300 days
MELADY
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,550
Yes
₹17,572
Yes
31 Oct 2023
27 Jul 2023
7 Aug 2023
27 Jul 2023
4 Aug 2023
27 Jul 2023
Amount
Kalankoly thodu
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
60.7.4:DR PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
shyju
RAVEENDRAN A C
GAFOOR. P.
MOODADI LABOUR CONTRACT CO-OP SOCIETY
Bidder Name
GAFOOR. P.
Kunnummal Babu
MOODADI LABOUR CONTRACT CO-OP SOCIETY
shyju
RAVEENDRAN A C
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .