Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC AT BASANTPUR PO KEDLA PS MANDU RAMGARH 825323 | MANDU | RAMGARH | JHARKHAND | 825323 | L1 | Accepted-AOC TECHNO-COMMERCIALLY ACCEPTED | |
| 2 | Rejected-Technical BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | - | Rejected-Technical ONLY L1 IS TO BE CONSIDERED | |
| 3 | Rejected-Technical BASANTPUR KEDLA DIST RAMGARH JHARKHAND | BASANTPUR | RAMGARH | JHARKHAND | - | Rejected-Technical ONLY L1 IS TO BE CONSIDERED |
Tender Value
₹3.7 L
EMD Value
₹4,700
Closing Date
20 Feb 2024, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SHUBHAM DAS
Kedla Washery, Hazaribagh Area, CCL
Rectification/modification of damaged/decayed drive base frame of unit no. 227 and replacement of tensioning S. S. wire rope, rectification of tail base frame of unit no. 122 belt conv. and replacement of snapped conv. Belt 121A ,80 mtr n 1200 mm wid
2024_CCL_300939_1
PO/KW/eTender/23-24/109, dated 09.02.2024
Open Tender
Electrical and Maintenance Works
Item Rate
12 days
Kedla Washery
As per NIT
2 documents required · 2 mandatory
₹4,700
6 May 2024
9 Feb 2024
21 Feb 2024
10 Feb 2024
20 Feb 2024
10 Feb 2024
10 Feb 2024 - 15 Feb 2024
Amount
Rectification/modification of damaged/decayed drive base frame of unit 227 belt conv. after diamantling & re-installation of gear box drive pulley motor & head snub pulley. (a) Dismantling of materials 90% of new (4.862 MT) from unused plates.
(b) Shifting of materials at site and Shifting of old materials.
(c) Dismantling G/box+ H. pulley +motor+ T. S. pulley for work as above.
(d) Dismantling damaged drive base frame 80% of new(4.862MT)
(e) Fabrication & erection of base frame.
(f) Installation of G/box head drive pulley snub pulley motor and alignment.
Replacement of tensioning S. S. wire rope, rectification of tail base frame of unit 122 belt conv. after tail pulley, tail snub pulley along with take-up arrangement dismantling & re-installation. (a) Dismantling of materials 90% of new (2.137 MT) from unused plates and tail frame 60% of new(2.137MT)= (1.923+1.282)=3.205
(b) Shifting of materials at site and of old materials to scrap yard.(1.923+1.282)=3.205
(c) Dismantling of tail snub pulley take-up wire rope.
(d) Fabrication & erection of tail frame.
(e) Installation of tail, snub take-up arrangement, wire rope
Replacement of snapped conv. belt 80mtrs. 1200mtr. Width unit no. 122B/conv. (a) Shifting of new conveyor belt at site. 1.475MT and old conv. Belt to scrap yard. =(1.180+1.475)=
Dismantling of snapped conv. Belt 80% of new (1.475MT)=1.180MT+ drive pulley+ take-up pulley arrangement+ gear box. (1.180+1.146+2.40+0.905) 5.631MT
Re-installation of conv. Belt new + drive pulley +T. arrangement+ gear box (1.475+1.146+2.40+0.905) 5.631MT
Shifting of complete shuttle belt conv. arrangement of unit 307 belt conveyor form clean coal bunker to -01 to CCMB No.-6 after made free carriage wheel assly. and maint. (a) Wt. of complete shuttle conv. Arrangement
Total impact of GST for the purpose of CTC
TRIBHUWAN ENTERPRISES
TRIDEO CONSTRACTION
techsummary_311740.pdf
PDF • 0.10 MB
finsummary_311740.pdf
PDF • 0.10 MB
WO102.pdf
PDF • 0.24 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .