Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹11 L
EMD Value
₹11,000
Closing Date
8 Nov 2022, 3:00 pmClosed
Block Development officer V Pts,Panchayat union
Block Development officer V Pts,Panchayat union,Thuraiyur
Improvements To The Near Mayanam Kuttai(Deepening,Main pond,Baby Pond,Bathing Ghat,Weir and Retainingwall) at Kothampatti Village in Kannanur Panchayat.
2022_RDTN_258742_1
T6/3837/2022-23
Open Limited
Civil Works - Water Works
Item Wise
30 days
Thuraiyur
Please Refer Tender Document
5 documents required · 5 mandatory
₹0
₹11,000
Yes
Panchayat Union,Thuraiyur
10 Nov 2022
28 Oct 2022
8 Nov 2022
28 Oct 2022
8 Nov 2022
28 Oct 2022
28 Oct 2022
Amount
Improvements To The Near Mayanam Kuttai(Deepening,Main pond,Baby Pond,Bathing Ghat,Weir and Retainingwall) at Kothampatti Village in Kannanur Panchayat. Clearing the juliflora jungle without uprooting
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Baby Pond: Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS 20 B
Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
Weir and Retaining wall : Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS 20 B
Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
Cement concrete 1:3:6 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Bathing ghat: Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS 20 B
Collection and supply of M.sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications.
Cement concrete in C M 1:4:8 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, for mixing laying and raming, curing the concrete etc.,
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc
R.C.C.1:1.5 :3 mix using 20mm ISS HBG Metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and fabrication of steel for all RCC items including all labour charges etc., complete.
Provision for Name Board,,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K SARAVANAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].