Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.4 LAccepted-AOC | ₹55.4 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹59.3 L+₹3.9 L (7.07%)Rejected-AOC | ₹59.3 L+₹3.9 L (7.07%) | L2 | Rejected-AOC rejected |
| 3 | L3₹60.0 L+₹4.6 L (8.27%)Rejected-AOC | ₹60.0 L+₹4.6 L (8.27%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹60.0 L+₹4.6 L (8.35%)Rejected-Finance | ₹60.0 L+₹4.6 L (8.35%) | L4 | Rejected-Finance FINANCIAL EVALUATION |
| 5 | L5₹60.5 L+₹5.1 L (9.26%)Rejected-Finance | ₹60.5 L+₹5.1 L (9.26%) | L5 | Rejected-Finance FINANCIAL EVALUATION |
| Sl No | Description | Qty | Unit | N Surendran L3 | RAAI INFRATECH PRIVATE LIMITED L5 | H SHAJI L6 | SALIM.H L8 | J NIZAR L4 | Shefeek Sulaiman L1 | CHANDRAMOHAN NAIR R L7 | Rajesh K L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Restoration work | |||||||||||
| 1.00 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 965.3 | cum | 46.5 ₹44,886.45 Lowest | 71 ₹68,536.3 | 47 ₹45,369.1 | 48 ₹46,334.4 | 62 ₹59,848.6 | 50 ₹48,265 | 48.04 ₹46,373.01 | 46.84 ₹45,214.65 |
| 1.00 | 3.19.1:Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for Compacting original ground supporting sub-grade construction. | 551.6 | cum | 64 ₹35,302.4 Lowest | 93.92 ₹51,806.27 | 65 ₹35,854 | 67 ₹36,957.2 | 85 ₹46,886 | 68 ₹37,508.8 | 66.3 ₹36,571.08 | 64.31 ₹35,473.4 |
| 1.00 | 4.1.A.1:Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with a motor grader on the prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method | 499.1 | cum | 3,544 ₹17,68,810.4 | 3,565.05 ₹17,79,316.46 | 3,600 ₹17,96,760 | 3,650 ₹18,21,715 | 3,190 ₹15,92,129 Lowest | 3,293 ₹16,43,536.3 | 3,602.23 ₹17,97,872.99 | 3,494.53 ₹17,44,119.92 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 105 | cum | 7,055 ₹7,40,775 | 6,450 ₹6,77,250 | 7,108 ₹7,46,340 | 7,150 ₹7,50,750 | 6,200 ₹6,51,000 Lowest | 6,460 ₹6,78,300 | 7,108.22 ₹7,46,363.1 | 6,895.7 ₹7,24,048.5 |
| 1.00 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer - (Without formwork) | 163.35 | cum | 8,460 ₹13,81,941 | 8,190.5 ₹13,37,918.18 | 8,600 ₹14,04,810 | 8,700 ₹14,21,145 | 7,500 ₹12,25,125 Lowest | 7,835 ₹12,79,847.25 | 8,601.29 ₹14,05,020.72 | 8,344.13 ₹13,63,013.64 |
| 1.01 | 55.22:Supplying and laying interlocking tile 100 mm or nearest size thickness, minimum strength M 40 including providing a layer of 6 mm aggregate for 5 cm thickness, then laying interlock cobbles in lines and levels as per the directions of the departmental officers at site inclusive of all cost & conveyance charges etc.; complete. | 1,729 | sqm | 1,132 ₹19,57,228 | 1,206 ₹20,85,174 | 1,169 ₹20,21,201 | 1,180 ₹20,40,220 | 1,400 ₹24,20,600 | 1,070 ₹18,50,030 Lowest | 1,170.2 ₹20,23,275.8 | 1,135.21 ₹19,62,778.09 |
Tender Value
₹62.4 L
EMD Value
₹50,000
Closing Date
18 Sept 2025, 3:00 pmClosed
Excecutive Engineer
KSTP DIVISION KOTTARAKKARA
DEPOSIT - Restoration work along KWA Pipe laying portion from Ch.80/285 to 83/100- LHS of MC road From Puthoormukku to Enathu bridge - Restoration work-General Civil Work
2025_PWD_790444_2
PWD/KP/TR/15885/2025
Open Tender
Civil Works - Roads
Item Rate
120 days
Kottarakkara
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
6 Nov 2025
9 Sept 2025
20 Sept 2025
9 Sept 2025
18 Sept 2025
9 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1315198.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .