| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC ODISHA | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹3.7 L−₹17,442.54 (4.51%)Rejected-Finance ODISHA OD | L2 | Rejected-Finance The Bidder has not been selected through lottery | |
| 3 | L3₹4.1 L+₹21,366.15 (5.53%)Rejected-Finance AT BAHARANA PO BAULANGA PS GOP DIST PURI | PURI | ODISHA | 752001 | L3 | Rejected-Finance The bidder cannot participate in the lottery |
Tender Value
₹3.9 L
EMD Value
₹3,885
Closing Date
16 Mar 2026, 5:00 pmClosed
EXECUTIVE OFFICER
NAC G.UDAYAGIRI
Construction of Compound wall of Kanbageri Primery School, Ward No.12
2026_ORULB_126771_31
GUDGR-NAC-03/2025-26
Open Tender
Civil Works - Others
Percentage
30 days
NAC G.UDAYAGIRI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Yes
₹3,885
Yes
7 Oct 2026
2 Mar 2026
17 Mar 2026
2 Mar 2026
16 Mar 2026
2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge. | 24.23 | cum | 276.89 | ₹6,709.04 |
| 2 | Supplying and filling of sand in foundation and plinth well watered and rammed including all cost, labour, T & P etc complete. | 4.04 | cum | 1,152 | ₹4,654.08 |
| 3 | Cement Concrete(1:4:8) with 4cm size crusher broken metal including cost of all labour, materials with all taxes, lead,T &P etc all complete. | 4.04 | cum | 6,259.92 | ₹25,290.08 |
| 4 | RCC work M-20 grade with 20mm and down graded black hard granite (crusher broken) stone chips including hoisting and laying etc. complete in all respect. | 2.32 | cum | 7,753.8 | ₹17,988.82 |
| 5 | Supplying fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification. (A/R, P-52, item -9a) | 2.32 | qntl | 8,934.47 | ₹20,727.97 |
| 6 | Removing old lime or cement plaster from walls including racking joints 12 mm. deep and removing debries within 50 meters lead. | 8.25 | sqm | 57.7 | ₹476.03 |
| 7 | Dismentaling brick or stone masonry in lime or stone mortar under 3m. Height including stacking the useful materials for reuse and removing the debries within 50 m. lead. | 0.91 | cum | 1,611.74 | ₹1,466.68 |
| 8 | Flyash Brick (25cm x 12cm x 8cm) masonary in cement motar (1:6) in foundation and plinth including cost convenyance royality of materials etc. complete as per direction of the E.I.C. Data per 1 Cum. | 10.6 | cum | 5,668.34 | ₹60,084.4 |
| 9 | Fly ash bricks in Cement mortar (1:6) in Super structure including all cost,conveyance etc. | 25.41 | cum | 5,701.34 | ₹1,44,871.05 |
| 10 | 12 mm thick cement plaster outside in CM(1:6) with watering, curing including all cost etc. | 275.9 | sqm | 197.2 | ₹54,407.48 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
BOQ_583625.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .