Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹4.2 LAccepted-AOC | ₹4.2 L | l1 | Accepted-AOC awarded |
| Sl No | Description | Qty | Unit | K K SHAJI L1 |
|---|---|---|---|---|
| 1.00Maintenance | ||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 39.13 | cum | 321.13 ₹12,566.14 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 0.16 | cum | 7,369.27 ₹1,193.82 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 11.1 | sqm | 362.59 ₹4,024.75 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 3.26 | cum | 9,824.22 ₹32,017.13 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 4.8 | sqm | 933.87 ₹4,482.58 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.48 | cum | 11,845.16 ₹5,685.68 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 223.91 | kilogram | 106.3 ₹23,801.95 |
| 1.01 | OD433462/2024-2025:Lateratemasonrywithneatlydressedlateratestoneofsize35x20x20cmornearestsizeincementmortar
1:6forfoundation and basement including all cost of materials, labour charges etc. (MOD
50.6.7.1 of DAR) | 5.63 | cum | 6,272.29 ₹35,319.26 |
| 1.01 | OD433461/2024-2025:Lateriteneatlydressedstonesofsize35x20x20cmorneareztsizeincementmortar1:6forsuperstructure
aboveplinth level up to floor two level including cost of materials labour charges etc.
complete.(MOD 50.6.7.2 of DAR) | 7.08 | cum | 7,080.27 ₹50,128.31 |
Tender Value
₹3.8 L
EMD Value
₹9,515
Closing Date
15 Apr 2025, 11:00 amClosed
Santhosh.P
AE,KOOTHUPARAMB MUNICIPALITY
BUILDING MAINTENANCE
2025_LSGD_749903_2
LSGD/CELSGD/TR/53473/2024
Open Tender
Civil Works - Buildings
180 days
Koothuparamba Municipality
Please refer Tender documents.
10 documents required · 10 mandatory
₹840
Yes
₹9,515
Yes
7 May 2026
7 Apr 2025
16 Apr 2025
7 Apr 2025
15 Apr 2025
7 Apr 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1233196.xls
BOQ • 0.32 MB
ADDITIONAL.pdf
Tender Documents • 0.42 MB
SBD.pdf
Tender Documents • 2.00 MB
Download all tender documents and submit your bid