| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | ₹2.6 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹2.7 L+₹5,477.49 (2.11%)Rejected-Finance | ₹2.7 L+₹5,477.49 (2.11%) | L2 | Rejected-Finance High percentage quoted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Required document not attached |
| 4 | Rejected-Technical | - | - | Rejected-Technical Required document not attached |
Tender Value
₹2.7 L
EMD Value
₹5,500
Closing Date
29 Apr 2026, 6:00 pmClosed
EE HPSAMB
EE HPSAMB
Re-construction of boundary wall and laying of storm water disposal pipeline etc at RM sub yard Kullu, H.P.
2026_HPAMB_134959_1
HMB-EC-11/92-Vol-XI
Open Tender
Civil Works
Percentage
30 days
Kullu
Please refer Tender documents.
3 documents required · 3 mandatory
₹415
₹5,500
30 Jul 2026
22 Apr 2026
30 Apr 2026
22 Apr 2026
29 Apr 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed by Engineer-incharge and disposing of all excavated earth at dumping site ( To be arranged by the Contractor) as per satisfacation of Engineer -in- Charge through all modes of transportation including head load , animal load or mechnical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechnical means and labour( If required). All useful material such as stone , shingles aggregate and slates Shall be properly Stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation as per direction of the Engineer -in -charge . Any loss to the public and private property during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | - | CUM | 357 | - |
| 2 | Providing form work with steel plates 3.15mm (Three point one five millimeters) thick, welded with angle iron in frame 30x30x5mm (Thirty into Thirty into Five millimeters) so as to give a fair finish including centering, shuttering strutting and propping etc, with wooden battens and ballies, heights of propping and centering in all heights below supporting floor to ceiling and removal of the same for in-situ reinforced concrete and plain concrete work in flat surfaces such as soffits of wall (any thickness ) including attched pilasters buttresses plinth and tring course etc. up to all floor level, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, Toll Tax Sales tax or any other taxes imposed by the Government. | - | SQM | - | - |
| 3 | Providing and laying cement concrete 1:3:6 (One cement : three sand : six crushed stone aggregate 40mm ( Forty millimeter) nominal size) mechanically mixed and vibrated in Walls including attached buttresses, pilasters and their caps and bases and string courses etc. upto floor two level including curing and cost of form work complete with carriage of materials labour ,tool and plants through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government | - | CUM | - | - |
| 4 | Providing and laying cement concrete 1:4:8 (One cement: Four sand :Eight graded cursed/broken stone aggregate 40mm) (forty millimeters nominal size) mechanically mixed and curing complete, excluding cost of form work in foundation and plinth including carriage of materials through all modes of transportion with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge. | - | CUM | - | - |
| 5 | Demolishing R.C.C./PCC work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material at dumpring site to be arranged by contractor at his own llevel and as per direction of Engineer - in- charge including all kind of mechanical as well as manual transportation charges and all taxes etc. | - | CUM | - | - |
| 6 | Supply and Installation of RCC Hume pipe of 600 MM DIA with specified grade and standard (Minimum M30 Grade concrete made with steel reinforcement with appropriate design and specifications pipel line fro disposal of storm water and other waste water from ground to sewrage line. | - | RMT | 2,100 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_199693.xls
BOQ • 0.34 MB
SBD_1_Boundarywall_Kullu.pdf
Tender Documents • 7.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .