| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹84.0 LAccepted-AOC VALIYAVEETTIL HOUSE ALAKODE P O KANNUR DISTRICT PIN 670571 | ALAKODE | KANNUR | KERALA | 670571 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹85.8 L+₹1.8 L (2.16%)Rejected-AOC | L2 | Rejected-AOC Being L2 | |
| 3 | L3₹91.2 L+₹7.1 L (8.51%)Rejected-AOC | L3 | Rejected-AOC Being L3 | |
| 4 | L4₹92.4 L+₹8.4 L (10.0%)Rejected-AOC | L4 | Rejected-AOC Being L4 |
Tender Value
₹93.0 L
EMD Value
₹50,000
Closing Date
28 Oct 2022, 5:00 pmClosed
Director
Inland Navigation Directorate, Asramam, Kollam-2
GENERAL-Reconstruction of Boat Jetty at Valluvankadavu in Chirakkal Panchayath INSK/BT/01/2022-23-General Civil Work 1 Existing Boat jetty is in dilapidated condition and needs to be replaced for which this work is proposed.
2022_Irrig_516623_1
IRR/IA/TR/363/2022_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Chirakkal panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
28 Nov 2022
15 Oct 2022
31 Oct 2022
15 Oct 2022
28 Oct 2022
15 Oct 2022
Amount
Appendix A
OD16170/2022-2023:Forming island of 25 m x 15m size at an average height of 1.50m etc. for fixing, staging platform and other appliances necessary for pile driving using 200mm to 300 mm dia coconut tree poles driven into the ground below bed level vertically at 0.60m c/c with coconut timber bracing ,covered with Polythene sheet (400G) for making the bund watertight and earth filling inside etc. including all cost conveyance labour and all other incidental charges etc, complete and dismantling the same as directed by Departmental officers at site as per standard specifications
5.33.1:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
8.2.2.1:Providing and fixing 18 mm thick gang saw cut, mirror, polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations, of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 ( 1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch ups, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Granite of any colour and shadeArea of slab upto 0.50 sqm
5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 150 landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.23:Smooth finishing of the exposed surface of RCC work with 6mm thick cement mortar 1:3 ( cement : 3 fine sand).
11.20.3:Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Dark shade pigment using ordinary cement
10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
12.48:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
12.49:Providing & laying on roof pressed clay tile ridge (Mangalore tile) of 20 mm thickness and of approved pattern on steel frame work complete (steel frame work to be paid separately ).
OD544/2022-2023:Providing & fixing on roof pressed clay tile (Mangalore tile) of 20 mm nominal thickness and of approved size and as per approved pattern on steel frame work complete (steel frame work to be paid separately)
12.5.1:Providing valleys of 90 cm wide overall in plain G.S. sheet fixed with polymer coated J or L hooks, bolts and nuts 8 mm dia G.I. limper and bitumen washers complete:1.60 mm thick with zinc coating not less than 350 gm/ m2
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.50.3:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron /steel works
13.50.4:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel work (second coat)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
60.7.6:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.7:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
60.64.1:Coconut Pile - Supplying and stacking well matured straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete.
OD19206/2022-2023:Coconut Pile - Driving down the well matured coconut pile to required lines and levels through various strata of soft to medium clay including all hire charges and labour for conveying, lifting, staging and all other appliances necessary for pile driving down after pointing the bottom end.As per letter No. Insp.Tech-2/118/2020-FIN dated 29-04-2021 of the Finance (Inspection Wing- Technical) Department. Details for driving 6m, 15 no of posts per day
60.64.6:Cutting and removing the excess length of wooden piles to lines and levels and removing the cut end of piles and stacking within 150m
OD545/2022-2023:Supplying and fixing old tyre on the fender post to resist the impact of stopping boat
10.28:Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in-charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.)
OD547/2022-2023:Providing Cast Iron Bollards with approved drawings and design including cost of all materials , moulding charges, cost of fixtures and all labour charges etc. complete
OD640/2022-2023:Providing and fixing in position fibre cement board 10 mm thick to the gable end over roof truss with Steel frames and steel screws including all cost of materials, labour charges etc. complete
OD650/2022-2023:Providing and fixing Mukappu for boat station, using with Pincoda or Irul , Sal wood scantlings including Multi wood name board
9.1.2:Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).Sal wood
13.67.1:Varnishing with varnish of approved brand and manufacture :Two or more coats of glue sizing with copal varnish over an under coat of flatting varnish
13.26:Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.
OD1086/2022-2023:Supply, conveyance, installation, testing and commissioning of 30W Integrated Solar LED light fitting with all accessories. Each unit should include 18V,75W panel with Grade A solar cells, 24Ah, 12.8V LiFePO4 type battery, Luminaire housing component to be Aluminium alloy with powder paint, IP65, LED chip shall be Philips/Osram, THD <10%, efficiency greater than 85%,3800-4500 lumens,etc. as required with 5years warranty . Luminaire shall be suitable for mounting at a height of 5-6m, should have 24hrs autonomy, PIR sensor for better efficient lighting. (Certifications:MNRE/IEC/BIS/LM80/ROHS/IP65)
OD1087/2022-2023:Supply and rection of Decorative tubular stainless steel pole having 5 mtr height, 2.5-2inch outer dia made from min. 2mm thick plate.
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
2.1.1:Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m and lift up to 1.5 m, disposed soil to be levelled and neatly dressed:All Kinds of soil
50.6.7.1:Laterate masonry with neatly dressed laterate stone of size 40x20x15cm or nearest size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc.
Appendix B
12.22:Providing Steel Liner 10mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing.
OD692/2022-2023:Bored cast-in-situ M30 grade R.C.C. Pile Using Batching Plant, Transit Mixer and Concrete Pump excluding Reinforcement complete as per Drawing and Technical Specifications and removal of excavated earth with all lifts and lead upto 1000 m.r|n<br>Pile diameter-600 mm r|n
Moideen Kunhi A
GOPINATHAN P
ABDUL SHUKOOR.V
Bidder Name
GOPINATHAN P
V C JAMES
ABDUL SHUKOOR.V
Moideen Kunhi A
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_741028.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .