Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical TECHNO COMMERCIAL REJECTED |
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
17 Sept 2020, 3:00 pmClosed
Jaspreet Singh
OTS DEPARTMENT, MAZAGON DOCK SHIPBUILDERS LTD.
SERVICES FOR FABRICATION INSTALLATION AND INSULATION OF HVAC DUCTING TRUNKING ALONGWITH ASSOCIATED FITTINGS FOR 4 SHIPS OF MDL YARDS 12651 12652 12653 AND 12654 OF PROJECT P17A
2020_MDL_82826_1
8000000922
Open Tender
Miscellaneous Services
1920 days
Mazagon Dock Shipbuilders Ltd.
As per Tender Enquiry Document
2 documents required · 2 mandatory
₹0
₹10 L
Yes
24 Nov 2020
20 Aug 2020
18 Sept 2020
20 Aug 2020
17 Sept 2020
20 Aug 2020
FABRICATION OF RECTANGULAR TRUNKS(NON-WT)
FABRICATION OF RECTANGULAR TRUNKS(WT/GT)
FABRICATION OF CIRCULAR DUCT (WT/GT)
FABRICATION OF DOUBLE SPIRAL DUCT (PRE-INSULATED)
FABRICATION OF MANUAL DAMPER FOR RECT. TRUNK- upto 150mm
FABRICATION OF MANUAL DAMPER FOR RECT. TRUNK- 151 to 300mm
FABRICATION OF MANUAL DAMPER FOR RECT. TRUNK- 301 to 450mm
FABRICATION OF MANUAL DAMPER FOR RECT. TRUNK- 451mm & above
FABRICATION OF DECK/BHD COAMINGS FOR RECT. TRUNKS- upto 150mm
FABRICATION OF DECK/BHD COAMINGS FOR RECT. TRUNKS- 151 to 300mm
FABRICATION OF DECK/BHD COAMINGS FOR RECT. TRUNKS- 301 to 450mm
FABRICATION OF DECK/BHD COAMINGS FOR RECT. TRUNKS- 451mm & above
FABRICATION OF DECK/BHD COAMINGS FOR CIRCULAR DUCTS- OD upto 150mm
FABRICATION OF DECK/BHD COAMINGS FOR CIRCULAR DUCTS- OD 151 to 300mm
FABRICATION OF MANUAL DAMPER FOR SPIRAL DUCT- OD upto 150mm
FABRICATION OF MANUAL DAMPER FOR SPIRAL DUCT- OD 151 to 300mm
FABRICATION OF PLAIN HANGER FOR RECT. TRUNK- upto 150mm
FABRICATION OF PLAIN HANGER FOR RECT. TRUNK- 151 to 300mm
FABRICATION OF PLAIN HANGER FOR RECT. TRUNK- 301 to 450mm
FABRICATION OF PLAIN HANGER FOR RECT. TRUNK- 451mm & above
FABRICATION OF PLAIN HANGER FOR SPIRAL DUCT- OD upto 150mm
FABRICATION OF PLAIN HANGER FOR SPIRAL DUCT- OD 151 to 300mm
FABRICATION OF SPRING HANGERS FOR RECT. TRUNK- upto 150mm
FABRICATION OF SPRING HANGERS FOR RECT. TRUNK- 151 to 300mm
FABRICATION OF SPRING HANGERS FOR RECT. TRUNK- 301 to 450mm
FABRICATION OF SPRING HANGERS FOR RECT. TRUNK- 451mm & above
FABRICATION OF SPRING HANGERS FOR SPIRAL DUCT- OD upto 150mm
FABRICATION OF SPRING HANGERS FOR SPIRAL DUCT- OD 151 to 300mm
FABRICATION OF WIRE MESH FRAME FOR TRUNKS- upto 150mm
FABRICATION OF WIRE MESH FRAME FOR TRUNKS- 151 to 300mm
FABRICATION OF WIRE MESH FRAME FOR TRUNKS- 301 to 450mm
FABRICATION OF WIRE MESH FRAME FOR TRUNKS- 451mm & above
FABRICATION OF WIRE MESH FRAME ON BULKHEADS- upto 150mm
FABRICATION OF WIRE MESH FRAME ON BULKHEADS- 151 to 300mm
INSTALLATION OF RECT. TRUNKS(NON-WT) UPTO 150mm Width
INSTALLATION OF RECT. TRUNKS(NON-WT) 151mm to 300mm W
INSTALLATION OF RECT. TRUNKS(NON-WT) 301mm to 450mm W
INSTALLATION OF RECT. TRUNKS(NON-WT) 451mm to 800mm W
INSTALLATION OF RECT. TRUNKS(WT/GT) UPTO 150mm Width
INSTALLATION OF RECT. TRUNKS(WT/GT) 151mm to 300mm W
INSTALLATION OF RECT. TRUNKS(WT/GT) 301mm to 450mm W
INSTALLATION OF RECT. TRUNKS(WT/GT) 451mm to 800mm W
INSTALLATION OF CIRCULAR DUCT (WT/GT) UPTO 150mm OD
INSTALLATION OF CIRCULAR DUCT (WT/GT) 151mm to 300mm OD
INSTALLATION OF CIRCULAR DUCT (WT/GT) 301mm to 450mm OD
INSTALLATION OF CIRCULAR DUCT (WT/GT) 451mm to 800mm OD
INSTALLATION OF DOUBLE SPIRAL DUCT DR-10
INSTALLATION OF DOUBLE SPIRAL DUCT DR-13
INSTALLATION OF DOUBLE SPIRAL DUCT DR-15
INSTALLATION OF DOUBLE SPIRAL DUCT DR-18
INSTALLATION OF DOUBLE SPIRAL DUCT DR-20
INSTALLATION OF DOUBLE SPIRAL DUCT DR-22
INSTALLATION OF DOUBLE SPIRAL DUCT DR-25
INSTALLATION OF DUST FILTER- 151 to 300mm
INSTALLATION OF DUST FILTER- 301 to 450 mm
INSTALLATION OF DUST FILTER- 451mm & above
INSTALLATION OF ODOUR FILTER- 151 to 300mm
INSTALLATION OF ODOUR FILTER- 301 to 450 mm
INSTALLATION OF HEPA FILTER- 451mm & above
INSTALLATION OF FIRE DAMPER- upto 150mm
INSTALLATION OF FIRE DAMPER- 151 to 300mm
INSTALLATION OF FIRE DAMPER- 301 to 450mm
INSTALLATION OF FIRE DAMPER- 451mm & above
INSTALLATION OF SMOKE DAMPER- 301 to 450mm
INSTALLATION OF SMOKE DAMPER- 451mm & above
INSTALLATION OF CONTROL DAMPER- 151 to 300mm
INSTALLATION OF CONTROL DAMPER- 301 to 450mm
INSTALLATION OF NR DAMPER- upto 150mm
INSTALLATION OF NR DAMPER- 151 to 300mm
INSTALLATION OF NR DAMPER- 301 to 450mm
INSTALLATION OF NR DAMPER- 451mm & above
INSTALLATION OF ELECTRIC HEATER- 151 to 300mm
INSTALLATION OF ELECTRIC HEATER- 301 to 450mm
INSTALLATION OF ELECTRIC HEATER- 451mm & above
INSTALLATION OF FLAME PROOF GAUGE- upto 150mm
INSTALLATION OF FLAME PROOF GAUGE- 151 to 300mm
INSTALLATION OF FLAME PROOF GAUGE- 301 to 450mm
INSTALLATION OF FLAME PROOF GAUGE- 451mm & above
INSTALLATION OF GOOSE NECK- upto 150mm
INSTALLATION OF GOOSE NECK- 151 to 300mm
INSTALLATION OF GOOSE NECK- 301 to 450mm
INSTALLATION OF GOOSE NECK- 451 & above
INSTALLATION OF HONEYCOMB FILTER- upto 150mm
INSTALLATION OF HONEYCOMB FILTER- 151 to 300mm
INSTALLATION OF HONEYCOMB FILTER- 301 to 450mm
INSTALLATION OF HONEYCOMB FILTER- 451 & above
INSTALLATION OF JALOUSY- 151 to 300mm
INSTALLATION OF JALOUSY- 301 to 450mm
INSTALLATION OF JALOUSY- 451mm & above
INSTALLATION OF CANVAS BELLOWS FOR ATU (30x2)
INSTALLATION OF CANVAS BELLOWS FOR HE (29x2)
INSTALLATION OF CANVAS BELLOWS FOR AFU (11x2)
INSTALLATION OF CANVAS BELLOWS FOR FAN (71x2)
INSTALLATION OF AIR OPERATED QUICK CLOSING VALVE (AOQCV)- upto 150mm
INSTALLATION OF AIR OPERATED QUICK CLOSING VALVE (AOQCV) 151 to 300mm
INSTALLATION OF AIR OPERATED QUICK CLOSING VALVE (AOQCV) 301 to 450mm
INSTALLATION OF AIR OPERATED QUICK CLOSING VALVE (AOQCV) 451mm & above
INSTALLATION OF WATER TIGHT BUTTERFLY VALVE (WTBV)- upto 150mm
INSTALLATION OF WATER TIGHT BUTTERFLY VALVE (WTBV)- 151 to 300mm
INSTALLATION OF WATER TIGHT BUTTERFLY VALVE (WTBV)- 301 to 450mm
INSTALLATION OF WATER TIGHT BUTTERFLY VALVE (WTBV)- 451mm & above
INSTALLATION OF PUNKHA LOUVERS- upto 150mm
INSTALLATION OF PUNKHA LOUVERS- 151 to 300mm
INSTALLATION OF MUSHROOM HEAD- upto 150mm
INSTALLATION OF MUSHROOM HEAD- 151 to 300mm
INSTALLATION OF MUSHROOM HEAD- 301 to 450mm
INSTALLATION OF SMOKE COUPLING- 151 to 300mm
INSTALLATION OF AIR BLEED VALVE (ABV)- upto 150mm
INSTALLATION OF AIR BLEED VALVE (ABV)- 151 to 300mm
INSTALLATION OF DIFFUSERS (CS)- upto 150mm
INSTALLATION OF MANUAL DAMPER FOR RECT. TRUNK- upto 150mm
INSTALLATION OF MANUAL DAMPER FOR RECT. TRUNK- 151 to 300mm
INSTALLATION OF MANUAL DAMPER FOR RECT. TRUNK- 301 to 450mm
INSTALLATION OF MANUAL DAMPER FOR RECT. TRUNK- 451mm & above
INSTALLATION OF DECK/BHD COAMINGS FOR RECT. TRUNKS- upto 150mm
INSTALLATION OF DECK/BHD COAMINGS FOR RECT. TRUNKS- 151 to 300mm
INSTALLATION OF DECK/BHD COAMINGS FOR RECT. TRUNKS- 301 to 450mm
INSTALLATION OF DECK/BHD COAMINGS FOR RECT. TRUNKS- 451mm & above
INSTALLATION OF DECK/BHD COAMINGS FOR CIRCULAR DUCTS- OD upto 150mm
INSTALLATION OF DECK/BHD COAMINGS FOR CIRCULAR DUCTS- OD 151 to 300mm
INSTALLATION OF MANUAL DAMPER FOR SPIRAL DUCT- OD upto 150mm
INSTALLATION OF MANUAL DAMPER FOR SPIRAL DUCT- OD 151 to 300mm
INSTALLATION OF PLAIN HANGER FOR RECT. TRUNK- upto 150mm
INSTALLATION OF PLAIN HANGER FOR RECT. TRUNK- 151 to 300mm
INSTALLATION OF PLAIN HANGER FOR RECT. TRUNK- 301 to 450mm
INSTALLATION OF PLAIN HANGER FOR RECT. TRUNK- 451mm & above
INSTALLATION OF PLAIN HANGER FOR SPIRAL DUCT- OD upto 150mm
INSTALLATION OF PLAIN HANGER FOR SPIRAL DUCT- OD 151 to 300mm
INSTALLATION OF SPRING HANGERS FOR RECT. TRUNK- upto 150mm
INSTALLATION OF SPRING HANGERS FOR RECT. TRUNK- 151 to 300mm
INSTALLATION OF SPRING HANGERS FOR RECT. TRUNK- 301 to 450mm
INSTALLATION OF SPRING HANGERS FOR RECT. TRUNK- 451mm & above
INSTALLATION OF SPRING HANGERS FOR SPIRAL DUCT- OD upto 150mm
INSTALLATION OF SPRING HANGERS FOR SPIRAL DUCT- OD 151 to 300mm
INSTALLATION OF WIRE MESH FRAME FOR TRUNKS- upto 150mm
INSTALLATION OF WIRE MESH FRAME FOR TRUNKS- 151 to 300mm
INSTALLATION OF WIRE MESH FRAME FOR TRUNKS- 301 to 450mm
INSTALLATION OF WIRE MESH FRAME FOR TRUNKS- 451mm & above
INSTALLATION OF WIRE MESH FRAME ON BULKHEADS- upto 150mm
INSTALLATION OF WIRE MESH FRAME ON BULKHEADS- 151 to 300mm
INSULATION OF TRUNKING/DUCTING (32mm Elastomeric Nitrile Thermal Insulation + Adhesive + Sealing Tape)
INSULATION OF TRUNKING/DUCTING FLANGES(9mm/32mm Elastomeric Nitrile Thermal Insulation + Adhesive + Sealing Tape)
Services of technicians for assistance during HVAC trials, commissioning of system, citadel trials and for maintenance cleaning of system on board ship.
INSTALLATION OF RECT. TRUNKS(NON-WT) UPTO 150mm Width at SSPL/CCPL
INSTALLATION OF RECT. TRUNKS(NON-WT) 151mm to 300mm W at SSPL/CCPL
INSTALLATION OF RECT. TRUNKS(NON-WT) 301mm to 450mm W at SSPL/CCPL
INSTALLATION OF RECT. TRUNKS(NON-WT) 451mm to 800mm W at SSPL/CCPL
INSTALLATION OF RECT. TRUNKS(WT/GT) UPTO 150mm Width at SSPL/CCPL
INSTALLATION OF RECT. TRUNKS(WT/GT) 151mm to 300mm W at SSPL/CCPL
INSTALLATION OF RECT. TRUNKS(WT/GT) 300mm to 450mm W at SSPL/CCPL
INSTALLATION OF RECT. TRUNKS(WT/GT) 451mm to 800mm W at SSPL/CCPL
INSTALLATION OF CIRCULAR DUCT (WT/GT) UPTO 150mm OD at SSPL/CCPL
INSTALLATION OF CIRCULAR DUCT (WT/GT) 151mm to 300mm OD at SSPL/CCPL
INSTALLATION OF CIRCULAR DUCT (WT/GT) 301mm to 450mm OD at SSPL/CCPL
INSTALLATION OF CIRCULAR DUCT (WT/GT) 451mm to 800mm OD at SSPL/CCPL
INSTALLATION OF DOUBLE SPIRAL DUCT DR-10 at SSPL/CCPL
INSTALLATION OF DOUBLE SPIRAL DUCT DR-13 at SSPL/CCPL
INSTALLATION OF DOUBLE SPIRAL DUCT DR-15 at SSPL/CCPL
INSTALLATION OF DOUBLE SPIRAL DUCT DR-18 at SSPL/CCPL
INSTALLATION OF DOUBLE SPIRAL DUCT DR-20 at SSPL/CCPL
INSTALLATION OF DOUBLE SPIRAL DUCT DR-22 at SSPL/CCPL
INSTALLATION OF DOUBLE SPIRAL DUCT DR-25 at SSPL/CCPL
S.A.F. REFRIGERATION ENGINEERING
ELEGANT ENGINEERING
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid