| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹9.7 CrAccepted-AOC | L 1 | Accepted-AOC L1 | |
| 2 | L2₹11.1 Cr+₹1.4 Cr (14.7%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹11.2 Cr+₹1.5 Cr (15.3%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹11.6 Cr+₹1.9 Cr (19.8%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹11.6 Cr+₹1.9 Cr (20.1%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | K.O.Jose L3 | BINUMATHEW L1 | K SUNDARAN L8 | Horizia Construction(india)pvt ltd L5 | Chicago Constructions International Pvt Ltd L6 | JOSEPH JOHN L7 | SAPIENT INFRA PVT LTD L2 | Thomas K Paul L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00APPENDIX - 1 - CONSTRUCTION OF 12.50 MLD WTP AT KINFRA COMPOUND - CLEARING AND LEVELING THE SITE | |||||||||||
| 1.00 | OD224968/2025-2026:CONSTRUCTION OF 12.50 MLD WTP AT KINFRA COMPOUND - CLEARING AND LEVELING THE SITE AS PER DIRECTION OF ENGINEER IN-CHARGE | 1 | L.S | 6,10,000 ₹6,10,000 Lowest | 15,01,000 ₹15,01,000 | 16,66,872 ₹16,66,872 | 18,33,532 ₹18,33,532 | 16,00,000 ₹16,00,000 | 16,66,846.9 ₹16,66,846.9 | 15,08,490 ₹15,08,490 | 15,69,003.1 ₹15,69,003.1 |
| 2.00APPENDIX - 2 - DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA COMPOUND - AERATOR FOR 12.5 MLD AND PUMPING MAIN EXTENSION FOR A LENGTH OF 30M | |||||||||||
| 2.00 | OD224971/2025-2026:DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA COMPOUND - AERATOR FOR 12.5 MLD AS PER THE DIRECTION OF ENGINEER-IN-CHARGE | 1 | L.S | 12,05,000 ₹12,05,000 Lowest | 16,94,000 ₹16,94,000 | 18,81,644 ₹18,81,644 | 17,02,889 ₹17,02,889 | 18,00,000 ₹18,00,000 | 18,81,644.47 ₹18,81,644.47 | 17,02,880 ₹17,02,880 | 17,71,320.93 ₹17,71,320.93 |
| 3.00APPENDIX - 3 - DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA - DISTRIBUTION BOX/PRECHLORINATION UNIT | |||||||||||
| 3.00 | OD225000/2025-2026:DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA - DISTRIBUTION BOX/PRECHLORINATION UNIT AS PER THE DIRECTION OF ENGINEER-INCHARGE | 1 | L.S | 8,80,000 ₹8,80,000 | 8,28,000 ₹8,28,000 Lowest | 9,19,620 ₹9,19,620 | 8,32,257 ₹8,32,257 | 9,15,000 ₹9,15,000 | 9,19,620.8 ₹9,19,620.8 | 8,32,250 ₹8,32,250 | 8,65,190.83 ₹8,65,190.83 |
| 4.00APPENDIX - 4 - DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA COMPOUND - FLASH MIXER FOR 12.5MLD | |||||||||||
| 4.00 | OD225013/2025-2026:DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA COMPOUND - FLASH MIXER FOR 12.5MLD AS PER THE DIRECTION OF ENGINEER-INCHARGE | 1 | L.S | 6,90,000 ₹6,90,000 Lowest | 7,70,000 ₹7,70,000 | 8,55,253 ₹8,55,253 | 7,74,005 ₹7,74,005 | 8,55,000 ₹8,55,000 | 8,55,253.52 ₹8,55,253.52 | 7,74,000 ₹7,74,000 | 8,04,563.29 ₹8,04,563.29 |
| 5.00APPENDIX - 5 - DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA - RAW WATER CHANNEL | |||||||||||
| 5.00 | OD225008/2025-2026:DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA - RAW WATER CHANNEL AS PER THE DIRECTION OF ENGINEER-INCHARGE | 1 | L.S | 8,75,000 ₹8,75,000 Lowest | 8,81,000 ₹8,81,000 | 9,78,164 ₹9,78,164 | 8,85,239 ₹8,85,239 | 9,78,000 ₹9,78,000 | 9,78,164.21 ₹9,78,164.21 | 8,85,230 ₹8,85,230 | 9,20,332.87 ₹9,20,332.87 |
Tender Value
₹12.3 Cr
EMD Value
₹5 L
Closing Date
9 Feb 2026, 3:00 pmClosed
Superintending Engineer
PH circle, KWA, Kalmandapam Palakkad
Construction of 12.5 MLD Water Treatment Plant for KINFRA Projects at KINFRA Compound at Kanjikode , Palakkad District-General Civil Work
2026_KWA_831240_1
12/2025-26/SE/PHC/PKD
Open Tender
Civil Works - Water Works
Item Rate
540 days
Kanjikode
Please refer Tender documents.
14 documents required · 14 mandatory
₹16,540
₹5 L
Yes
KWA, PHC, Palakkad
10 Jun 2026
28 Jan 2026
10 Feb 2026
28 Jan 2026
9 Feb 2026
28 Jan 2026
28 Jan 2026 - 2 Feb 2026
4 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1APPENDIX - 1 - CONSTRUCTION OF 12.50 MLD WTP AT KINFRA COMPOUND - CLEARING AND LEVELING THE SITE | |||||
| 1.001 | OD224968/2025-2026:CONSTRUCTION OF 12.50 MLD WTP AT KINFRA COMPOUND - CLEARING AND LEVELING THE SITE AS PER DIRECTION OF ENGINEER IN-CHARGE | 1 | L.S | - | - |
| 2APPENDIX - 2 - DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA COMPOUND - AERATOR FOR 12.5 MLD AND PUMPING MAIN EXTENSION FOR A LENGTH OF 30M | |||||
| 2.001 | OD224971/2025-2026:DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA COMPOUND - AERATOR FOR 12.5 MLD AS PER THE DIRECTION OF ENGINEER-IN-CHARGE | 1 | L.S | - | - |
| 3APPENDIX - 3 - DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA - DISTRIBUTION BOX/PRECHLORINATION UNIT | |||||
| 3.001 | OD225000/2025-2026:DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA - DISTRIBUTION BOX/PRECHLORINATION UNIT AS PER THE DIRECTION OF ENGINEER-INCHARGE | 1 | L.S | - | - |
| 4APPENDIX - 4 - DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA COMPOUND - FLASH MIXER FOR 12.5MLD | |||||
| 4.001 | OD225013/2025-2026:DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA COMPOUND - FLASH MIXER FOR 12.5MLD AS PER THE DIRECTION OF ENGINEER-INCHARGE | 1 | L.S | - | - |
| 5APPENDIX - 5 - DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA - RAW WATER CHANNEL | |||||
| 5.001 | OD225008/2025-2026:DESIGN AND CONSTRUCTION OF 12.50 MLD WTP AT KINFRA - RAW WATER CHANNEL AS PER THE DIRECTION OF ENGINEER-INCHARGE | 1 | L.S | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 1.90 MB
KinfraNIT_compressed.pdf
Tender Documents • 17.14 MB
BOQ_1396861.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .