Loading…
Loading…
Tender Value
₹68.0 L
EMD Value
₹68,000
Closing Date
22 Oct 2026, 5:00 pm
SE, RWSS DIVISION, PURI
O/O SE, RWSS DIVISION, PURI, WATER WORKS ROAD, PURI-752002
Construction of Office Building for RWSS Sub-Division, DELANG in Puri district.
2026_RWSS_142781_1
RWSS DIVISION PURI 18 OF 2026-27
Open Tender
Civil Works - Buildings
Percentage
270 days
RWSS SUB-DIVISION, DELANG
Please Refer Tender Documents.
3 documents required · 3 mandatory
₹10,000
Yes
₹68,000
Yes
7 Oct 2026
7 Oct 2026
23 Oct 2026
7 Oct 2026
22 Oct 2026
7 Oct 2026
7 Oct 2026 - 16 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A. GROUND FLOOR
A-1) Supplying all materials, labour, T&P for earth work in excavation in foundation in all kinds of soil with in 50m initial lead and1.50m initial lift including rough dressing and breaking clods to maximum5cm to 7cm in size and laying in layers not exceeding 0.30min depth and as per the direction of EIC. | 120.08 | Cum | 261 | ₹31,340.88 |
| 2 | A-2) Supplying all materials, labour, T&P for filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete. | 106.14 | Cum | 725.4 | ₹76,993.96 |
| 3 | A-3) Supplying all materials, labour, T&P and providing Cement Concrete (1:3:6) using 40mm size hard granite C.B. metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C. | 30.02 | Cum | 7,447.5 | ₹2,23,573.95 |
| 4 | A-4) Supplying all materials labour T&P and providing Brick work with Fly Ash bricks of 25cm x 12cm x 8cm size in cement mortar (1:6) in Foundation and Plinth including watering curing, cost of carriage, royalty and taxes of all materials, cost of all labour, T&P etc complete as per the direction of E.I.C. | 48.26 | Cum | 5,855.4 | ₹2,82,581.6 |
| 5 | A-5) Supplying all materials labour T&P and providing R.C.C. M-25 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement complete.
a) Column base | 23.02 | Cum | 7,423.26 | ₹1,70,883.45 |
| 6 | A-5.-b) Grade Beam | 7.62 | Cum | 8,361.88 | ₹63,717.53 |
| 7 | A-5.-c) Lintel | 3.12 | Cum | 15,143.59 | ₹47,248 |
| 8 | A-5.-d) Chajja | 7.74 | Sqm | 1,305.02 | ₹10,100.85 |
| 9 | A-5.-e) Column and Roof beam | 14.46 | Cum | 19,251.23 | ₹2,78,372.79 |
| 10 | A-5.-f) Shelve | 6 | Sqm | 1,241.05 | ₹7,446.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
DTCN_Office_Building_Delang.pdf
Tender Documents • 1.06 MB
BOQ_612590.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .