Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 CrAdmitted-Finance AT B2 509 BHOOMERANG OFF CHANDIVALI FARM ROAD CHANDIVALI ANDHERI C MUMBAI 400072 | MUMBAI SUBURBAN | MAHARASHTRA | 400072 | ₹13.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹13.5 CrAdmitted-Finance SECTOR 3 NEAR BJP HEAD OFFICE TRIKUTA NAGAR JAMMU 180012 | JAMMU | JAMMU AND KASHMIR | 180012 | ₹13.5 Cr | L2 | Admitted-Finance |
| 3 | L3₹17.0 CrAdmitted-Finance | ₹17.0 Cr | L3 | Admitted-Finance |
| 4 | Rejected-Technical A 15 1ST FLOOR PRIYADARSHINI VIHAR DELHI 110092 | SHAHDARA | DELHI | 110092 | - | - | Rejected-Technical Technically Non-Responsive under the conflict of interest as per clause no 2.2.1(c) (v). |
| 5 | Rejected-Technical OFFICE NO 112 FIRST FLOOR GANESH KHIND ROAD AUNDH PUNE 411067 | PUNE | PUNE | MAHARASHTRA | 411067 | - | - | Rejected-Technical Technically Non-Responsive under the conflict of interest as per clause no 2.2.1(c) (v). |
| Sl No | Description | Qty | Unit | Pioneer Foundation Engineers Pvt Ltd L1 | SRM CONTRACTORS PRIVATE LIMITED L2 | Maccaferri Infrastructure Pvt Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00INVESTIGATION DESIGN AND CONSTRUCTION OF SLOPE PROTECTION AND NALLAH TREATMENT MEASURES AT KM 46.00 SUKHA NALLAH ALONG BASHOLI-BANI-BHADERWAH ROAD UNDER 69 RCC/ 35 BRTF PROJECT SAMPARK THROUGH EPC MODE (2ND CALL) | ||||||
| 1.01 | INVESTIGATION DESIGN AND CONSTRUCTION OF SLOPE PROTECTION AND NALLAH TREATMENT MEASURES AT KM 46.00 SUKHA NALLAH ALONG BASHOLI-BANI-BHADERWAH ROAD UNDER 69 RCC/ 35 BRTF PROJECT SAMPARK THROUGH EPC MODE (2ND CALL) | 1 | Lumpsum | 12,96,42,000 ₹13.0 Cr | 13,52,34,400 ₹13.5 Cr | 16,99,00,000 ₹17.0 Cr |
Tender Value
₹25.4 Cr
EMD Value
₹25.4 L
Closing Date
8 Oct 2024, 12:00 pmClosed
Chief Engineer Project Sampark
HQ Chief Engineer Project Sampark Near Peer Baba Kunjwani Chowk Jammu 180010
INVESTIGATION DESIGN AND CONSTRUCTION OF SLOPE PROTECTION AND NALLAH TREATMENT MEASURES AT KM 46.00 SUKHA NALLAH ALONG BASHOLI-BANI-BHADERWAH ROAD UNDER 69 RCC/ 35 BRTF PROJECT SAMPARK THROUGH EPC MODE (2ND CALL)
2024_BRO_672554_1
CE (P) SPK/EPC/02/2024-25
Open Tender
Civil Works
540 days
Km 46.000 on Basoli Bani Bhaderwah Road
As per Tender Documents
6 documents required · 6 mandatory
₹11,800
Chief Engineer Project Sampark
₹25.4 L
HQ Chief Engineer Project Sampark Kunjwani Jammu
29 Jan 2025
6 Sept 2024
9 Oct 2024
6 Sept 2024
8 Oct 2024
14 Sept 2024
6 Sept 2024 - 11 Sept 2024
13 Sept 2024
Amount
INVESTIGATION DESIGN AND CONSTRUCTION OF SLOPE PROTECTION AND NALLAH TREATMENT MEASURES AT KM 46.00 SUKHA NALLAH ALONG BASHOLI-BANI-BHADERWAH ROAD UNDER 69 RCC/ 35 BRTF PROJECT SAMPARK THROUGH EPC MODE (2ND CALL)
INVESTIGATION DESIGN AND CONSTRUCTION OF SLOPE PROTECTION AND NALLAH TREATMENT MEASURES AT KM 46.00 SUKHA NALLAH ALONG BASHOLI-BANI-BHADERWAH ROAD UNDER 69 RCC/ 35 BRTF PROJECT SAMPARK THROUGH EPC MODE (2ND CALL)
SRM CONTRACTORS PRIVATE LIMITED (BID ID -3132193)
Maccaferri Infrastructure Pvt Ltd (BID ID -3130858)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.39 MB
RFP.pdf
Tender Documents • 1.37 MB
DCA.pdf
Tender Documents • 1.46 MB
Designreport.pdf
Additional Documents • 35.42 MB
Schedule.pdf
Tender Documents • 6.08 MB
BOQ_751926.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid