| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.5 L+₹1,444.80 (0.32%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹4.7 L+₹19,060 (4.25%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹4.8 L+₹36,400 (8.11%)Rejected-Finance NULL | L4 | Rejected-Finance L4 | |
| 5 | L5₹5.4 L+₹92,480 (20.6%)Rejected-Finance SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | L5 | Rejected-Finance L5 |
Tender Value
₹5.5 L
EMD Value
₹13,700
Closing Date
7 Mar 2019, 6:00 pmClosed
Executive Engineer
Office of the Executive Engineer, PWD Roads Division kottayam
Budget work 2018-19 - Investigation estimate for the Construction of 2 nos. Bus Bays parellel to the existing Bridge at Kaduthuruthy in Ettumanoor Ernakulam road at ch 13/300 km
2019_PWD_271962_1
ETKTM338/2018-19
Open Tender
Civil Works - Roads
Item Rate
30 days
Kaduthuruthy
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,250
online
₹13,700
23 Jan 2020
28 Feb 2019
12 Mar 2019
28 Feb 2019
7 Mar 2019
28 Feb 2019
Amount
INVESTIGATION ESTIMATE
56.17.1 : Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.
56.12.b : Total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures.Total station surveying and preparation of site plan for plain built up area with hindrance to line of sight due to buildings/structures.
56.1.a : Mobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the work<br>For machine boringMobilization including transportation of all necessary plan and equipment's and materials of boring field testing and sampling and demobilization after completing the workFor machine boring
56.2.a : Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.<br>For machine boring.Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location.For machine boring.
56.3.a.1 : Boring with rotary power drilling equipment's in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soil.Boring with rotary power drilling equipment's inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil.
56.3.a.2 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For under water.Boring with rotary power drilling equipment inall types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata upto 10m. Including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For under water.
56.3.b.1 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For ordinary soilBoring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto a depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For ordinary soil
56.3.b.2 : Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.<br>For under water.Boring with rotary power drilling equipment in all types of soil having N value less than 50 excluding hard rock soft rock, or medium rock for strata for next 10m upto depth of 20m including conducting necessary S.P.T and recovery of un disturbed soil samples at 5m.intervals.For under water.
56.5.a : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.<br>In land.Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In land.
56.5.b : Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.<br>In water.Boring through all classes of rock excluding hard rocks having ' N' value greater than 50 using tungsten carbide drilling bit.In water.
56.4 : Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under and banks of river.
56.6 : Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.7 : Conducting standard penetration test in bore hole at any depth.Conducting standard penetration test in bore hole at any depth.
56.8 : Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.11.a : Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)<br>Machine boring for 5 bore holes.Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate)Machine boring for 5 bore holes.
56.14.a : Cross section details:- River.Cross section details:- River.
56.15.a : Hydraulic Velocity Calculation:- River.Hydraulic Velocity Calculation:- River.
od333/2018_2019 : Conducting traffic survey at different station with wo sheds on opposite dides including hire charges of shed furniture labour charges of survey assistants cost of stationries etc complete
od334/2018_2019 : Preparing alignment for the proposed road and drawing out a suitable alignment meeting all requirements of Indian Road Congress(IRC). Also satisfying the Engineering aesthetic and economic requirement designing of horizontal curves (wherever feasible) including spiral tansitions and vertical curves after finalizing the alignment and also preparing the LS and CS at an interval of 50m C/C.
Babu Mathew T M
Synergy Architects and Engineers
G S Infrastructure
AA AND S CONSTRUCTIONS
Bidder Name
Babu Mathew T M
G S Infrastructure
RTF INFRA PRIVATE LIMITED
AA AND S CONSTRUCTIONS
Synergy Architects and Engineers
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .