Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.9 L+₹43,220 (12.6%)Admitted-Finance | ₹3.9 L+₹43,220 (12.6%) | L2 | Admitted-Finance |
| 3 | L3₹3.9 L+₹45,350 (13.2%)Admitted-Finance | ₹3.9 L+₹45,350 (13.2%) | L3 | Admitted-Finance |
| 4 | L4₹4.3 L+₹85,180 (24.8%)Admitted-Finance | ₹4.3 L+₹85,180 (24.8%) | L4 | Admitted-Finance |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/s G K Construction L3 | NAVJEEVAN ENTERPRISES L1 | M/s Sai Electrical Works L2 | Bibhu Sales and Service L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | 65 sqmm 2 core aluminium service wire (100mtr roll) | 10 | Roll | 2,000 ₹20,000 | 1,600 ₹16,000 | 1,650 ₹16,500 | 1,500 ₹15,000 Lowest |
| 2.00 | Led Tube Light 20W | 20 | Nos | 300 ₹6,000 | 200 ₹4,000 | 165 ₹3,300 Lowest | 180 ₹3,600 |
| 3.00 | Celling Fan 1200 mm | 10 | Nos | 2,000 ₹20,000 | 1,350 ₹13,500 Lowest | 1,600 ₹16,000 | 1,450 ₹14,500 |
| 4.00 | 3 Pole Power Contractor Type- ML-4 2 Nos + 2 NC Cat No. SS90910, Make L&T | 4 | Nos | 21,000 ₹84,000 | 19,600 ₹78,400 | 22,110 ₹88,440 | 1,500 ₹6,000 Lowest |
| 5.00 | Single Phase Preventer | 10 | Nos | 1,000 ₹10,000 | 1,050 ₹10,500 | 550 ₹5,500 Lowest | 1,800 ₹18,000 |
| 6.00 | Copper cable 2.5 sqmm | 180 | Mtrs. | 38 ₹6,840 | 28 ₹5,040 Lowest | 65 ₹11,700 | 900 ₹1,62,000 |
| 7.00 | Copper cable 1 sqmm | 180 | Mtrs. | 21 ₹3,780 | 14 ₹2,520 Lowest | 25 ₹4,500 | 410 ₹73,800 |
| 8.00 | 50W LED Streel Light | 28 | Nos | 2,300 ₹64,400 | 2,070 ₹57,960 | 2,000 ₹56,000 | 800 ₹22,400 Lowest |
| 9.00 | 6sqmm 3 core submersible cable | 200 | Mtrs. | 150 ₹30,000 Lowest | 265 ₹53,000 | 150 ₹30,000 Lowest | 249 ₹49,800 |
| 10.00 | HBC Fuse Link 630 Amps | 6 | Nos | 2,100 ₹12,600 | 1,900 ₹11,400 | 2,200 ₹13,200 | 1,500 ₹9,000 Lowest |
Tender Value
₹4.8 L
EMD Value
₹9,694
Closing Date
4 Sept 2025, 3:30 pmClosed
Executive Engineer
Executive Engineer PHED, APWD, Prothrapur-744105
AR and MO Urban water supply under AE_VI_EnM during 2025_26 SW Replacement of Electrical fitting at Dhanikhari Dam
2025_APWD_19638_1
NIT No.19/DB/PHED/2025-26
Open Tender
Repair and Maintenance Services
Item Rate
30 days
Dhanikhari Dam
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹9,694
9 Sept 2025
19 Aug 2025
5 Sept 2025
19 Aug 2025
4 Sept 2025
26 Aug 2025
Amount
65 sqmm 2 core aluminium service wire (100mtr roll)
Led Tube Light 20W
Celling Fan 1200 mm
3 Pole Power Contractor Type- ML-4 2 Nos + 2 NC Cat No. SS90910, Make L&T
Single Phase Preventer
Copper cable 2.5 sqmm
Copper cable 1 sqmm
50W LED Streel Light
6sqmm 3 core submersible cable
HBC Fuse Link 630 Amps
HBC Fuse Link 800 Amps
Armoured UG Cable 150 sqmm 3½ core aluminium
Electronic timer type ST100 L&T Cat No. ST803280000
Overload relay for L&T starter MN5 relay range 66-110 A Similar to Cat No. SS9413700K0
Kit Kat Rewireable (Porcelain fuse carrier & base) with strip 320A/415V
M/s Sai Electrical Works (BID ID -58060)
M/s G K Construction (BID ID -58074)
Bibhu Sales and Service (BID ID -58084)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .