| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-Finance | ₹31.6 L | L1 | Accepted-Finance Technical bid pass |
| 2 | L2₹32.4 L+₹87,743.72 (2.78%)Accepted-Finance | ₹32.4 L+₹87,743.72 (2.78%) | L2 | Accepted-Finance Technical bid pass |
| 3 | L3₹34.4 L+₹2.8 L (8.90%)Accepted-Finance | ₹34.4 L+₹2.8 L (8.90%) | L3 | Accepted-Finance Technical bid pass |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Technical document not submitted |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-Technical ducument not submitted |
| Sl No | Description | Qty | Unit | lallooji shivgovind das tent company L2 | VRINDABAN TENT HOUSE L1 | Aman Associates L3 |
|---|---|---|---|---|---|---|
| 1.01 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 | 55.47 | Cum | 1,605 ₹89,029.35 Lowest | 1,605 ₹89,029.35 Lowest | 1,700 ₹94,299 |
| 1.02 | White washing with lime to give an even shade :
13.37.1 New work (three or more coats) | 554.7 | Sqm | 32 ₹17,750.4 Lowest | 32 ₹17,750.4 Lowest | 33.85 ₹18,776.6 |
| 1.03 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 271.35 | cum | 161.5 ₹43,823.03 | 158 ₹42,873.3 Lowest | 169.75 ₹46,061.66 |
| 1.04 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. | 1,083.27 | Sqm | 665 ₹7,20,374.55 | 650 ₹7,04,125.5 Lowest | 684.85 ₹7,41,877.46 |
| 1.05 | Providing barricading 2 Nos. ROWS ballies with 4-5" dia khooteys & Horizontal ballies 2.3-3.5 dia horizontal khooteys tied 8' c/c with nails and Nariyal rope i/c khooteys 2-2.5' under GL on Hire basis complete for the followings | 2,395.78 | rmt | 180 ₹4,31,240.4 Lowest | 180 ₹4,31,240.4 Lowest | 199 ₹4,76,760.22 |
| 1.06 | Swiss cottage 3 Room Double fly 12'x12' or 6'x12'. | 2 | Nos. | 18,250 ₹36,500 | 17,900 ₹35,800 Lowest | 19,000 ₹38,000 |
| 1.07 | E.P. Tent double fly with kental on ballies frame 18x18' or 16'x20'. | 4 | Nos. | 11,250 ₹45,000 | 10,900 ₹43,600 Lowest | 11,500 ₹46,000 |
| 1.08 | Store Tent double fly with kanat on ballies frame 18'x48'. | 2 | Nos. | 28,250 ₹56,500 | 27,000 ₹54,000 Lowest | 29,500 ₹59,000 |
| 1.09 | Choldary single fly 14'x14'. | 1 | Nos. | 3,525 ₹3,525 | 3,500 ₹3,500 Lowest | 3,675 ₹3,675 |
| 1.10 | Almirah Steel Big Size | 2 | Nos. | 4,525 ₹9,050 | 4,500 ₹9,000 Lowest | 4,750 ₹9,500 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
29 May 2026, 12:00 pmClosed
EE RWD HDR
EE RWD HDR
CONSTRUCTION OF TEMPORARY BUS STAND AT Gori Shankr UNDER KUMBH MELA 2027 DISTRICT HARIDWAR.
2026_RES_95572_1
306/15.05.2026 RWD_HDR
Open Tender
Civil Works - Buildings
Item Rate
150 days
Gori Shankr
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Yes
EE RWD haridwar
₹1.1 L
Yes
2 Jun 2026
18 May 2026
29 May 2026
18 May 2026
29 May 2026
18 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 | 1 | Cum | 1,607.7 | ₹1,606.09 |
| 1.02 | White washing with lime to give an even shade :
13.37.1 New work (three or more coats) | - | Sqm | 32.2 | - |
| 1.03 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | - | cum | 161.62 | - |
| 1.04 | Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks. | 1 | Sqm | 653.11 | ₹652.46 |
| 1.05 | Providing barricading 2 Nos. ROWS ballies with 4-5" dia khooteys & Horizontal ballies 2.3-3.5 dia horizontal khooteys tied 8' c/c with nails and Nariyal rope i/c khooteys 2-2.5' under GL on Hire basis complete for the followings | - | rmt | 180 | - |
| 1.06 | Swiss cottage 3 Room Double fly 12'x12' or 6'x12'. | - | Nos. | 18,000 | - |
| 1.07 | E.P. Tent double fly with kental on ballies frame 18x18' or 16'x20'. | - | Nos. | 11,000 | - |
| 1.08 | Store Tent double fly with kanat on ballies frame 18'x48'. | - | Nos. | 28,000 | - |
| 1.09 | Choldary single fly 14'x14'. | - | Nos. | 3,500 | - |
| 1.1 | Almirah Steel Big Size | - | Nos. | 4,500 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_113009.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.79 MB
BOQ_113009.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .