| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹28.5 Laccepted-aoc | ₹28.5 L | accepted-aoc |
Tender Value
₹34.8 L
EMD Value
₹34,782
Closing Date
27 Jan 2026, 4:30 pmClosed
Commissioner, MCT
Tilak Road Tirupati
Construction of Internal Drains in Kesavayanagunta Area and Replacement of damaged UDS line at STV Nagar and at Bairagipateda in Ward No. 14.
882635
340/TPT/25-26/GEN/TO, Dt. 24-12-2025
OPEN - NCB
Civil Engineering Works
TIRUPATHI
7 documents required · 6 mandatory · 1 optional
₹1,232
₹34,782
11 Feb 2026
6 Jan 2026
6 Jan 2026
Cutting open CC road surface including labour charges, all leads, lifts and conveyance of all materials etc., complete as directed by the departmental officers for pipeline trenches.
(RBR -FNDN-1 (i)) Earthwork excavation by Manual means and depositing on the bank in all types of soils like black cotton soil, red earth and ordinary gravel, hard gravelly soils, mixture of gravel, soft disintegrated rock, hard disintegrated rock, Conglomerated rock, stoney earth and earth mixed with fair size boulders except rock requiring blasting with different lifts as per specifications and drawings and as directed by the departmental officers, including protecting the walls and other structures, existing water supply lines, sewers, power cables, telephone cables/ducts, storm water drains, etc., wherever it is possible so as not to distrub the existing utility services etc., taking all precautionary measures in the restricted areas including diversion of the traffic, removal of stumps and other deleterious material and disposal upto a lead of 1000 m, dressing of sides and bottom and excluding backfilling for pipeline trenches including all incidental and operational charges etc.,complete.(Excavation for Structures -Pipelines)
70% By Mechanical Means
30% By Manual Means
(RBR-FNDN-2) Providing bedding with sand for necessary areas as per specification and drawing including cost and conveyance of materials to site with all leads, lifts including watering, tamping, ramming, labour charges, all other incidental and operational charges etc., complete as per detailed specification and directed by the Engineer - in - Charge (as per SSR 14-15- Amendment)
Manufacture, supply & delivery at the departmental stores of steel fiber reinforcement concrete manhole frames and covers of HD-20 circular type with 560mm clear opening including loading, conveyance unloading and stacking property as directed by Departmental Authorities HD-20 With 560mm Dia Clear Opening
Manufacture, supply, & delivery of (DWC) structured wall polyethylene/polypropylene piping system with non smooth external annular corrugated and smooth internal surface (Double Wall) for non pressure sewage & Drainage application pipes of standard length 6 m, grade conforming to IS 16098 (part-II: 2013) excluding transportation to anywhere in A.P, excluding all taxes. Inner Dia. (mm) Stiffness Class SN-8
200 mm dia DWC Pipe
150 mm dia DWC Pipe
Manufacture, supply, & delivery of fittings & accessories compatible with DWC pipe - non smooth External Annular Corrugated and smooth Internal Surfaces (Double Wall) for non-pressure or similar type of class SN8 Structured Wall polythelene piping systems including transportation to anywhere in A.P, excluding GST and other Government duties.Inner Dia. (mm)
200 mm dia Couplers
200 mm dia Sealing Ring
Laying of Alcorr or similar type of Class SN8 structured wall (External Annular Corrugated & Smooth Internal surface) Polythelene pipes, on the lower bedding (Constructed at bottom of trenches) at prescribed gradient, depth & alignment including installation and jointing of the same with the help of coupler (on line/ off line) attached to one end of the pipe & sliding the coupler end over the elastomeric sealing rubber ring fitted on the specified valley of the spigot end of next pipe, testing the water tightness of the joint assembly, ensuring the continuity tests of specified pipe segments etc. complete as per drawing, specifications & detail engineering, including carriage of pipes & fittings from site stacks to the place of laying etc. as per direction of Engineer-in-charge. (Payment to be made on the basis of actual finished length of pipe line).
for 200mm dia DWC Pipe
for 150mm dia DWC Pipe
Construction of manholes along the sewer line for the following depth as per the dept Drawings and as directed by dept. officers including earth work excavation, laying CC works, brick work using 1st class wire cut mechanised bricks, plastering etc., including cost and conveyance of all materials and labour charges for, civil works, conveyance of manhole frames, covers and steps from deptl. Stores to site of work, fixing manhole, frames, covers and steps in position, benching channelling finishing smooth with a coat of neat cement etc., compelte but excluding the cost of manhole frames, covers and steps
600 x 600mm size 1.00m depth
800 x 900mm size 1.00m depth
800 x 900mm size 1.50m depth
(BLD-CSTN 2-5) Providing Plain cement concrete 1:4:8 using 40 mm metal with concrete mixer upto plinth level as approved by the department including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge
(RBR-FNDN-4G-4V-i) Providing Plain cement concrete M 20 Nominal Mix using 20 mm metal (1:2:4)and using concrete mixer as approved by the department including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge (may be used as CC 1:2:4)
(BLD-CSTN-12-2) Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100 Mts lead For RCC Culverts
(BLD-CSTN-12-2) Demolition including stacking of serviceable materials and disposal of unserviceable materials within 100 Mts lead For Brick Work
BLD-CSTN-12-1 Demolishing and disposal of unserceable materails within 100 Mts lead for CC Ramps
(RBR -FNDN-1 (i)) Earthwork excavation for Structures as per drawing and technical specifications clause 305.1 including dewatering, setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50mtrs, dressing of sides, bottom and back filling in trenches with excavated suitable material as per technical specification 305 MORD / 304 MORth
(RBR-FNDN-4G-4-II-iii) Providing Plain cement concrete M15 grade nominal mix as approved by the department using 20 mm graded hard granite machine crushed metal including cost and conveyance of all materials to site, machine mixing of concrete, all lifts, leads, delifts, centering, laying in position, vibrating, compacting, curing, removal of centering, all labour charges, tools and plants, and all other incidental and operational charges etc., complete as per specifications, drawings and as directed by the Engineer - in - Charge (concrete machine mixing)
for Drain Walls
(BLD-CSTN 2-13) RCC M- 20 Nominal Mix as approved by the department Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. For M20 Culvert SLABS - above 150 mm - Up to 300 mm thick
(BLD-CSTN-2-18) Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete
Carting away the surplus excavated material i.e., earth from the site to a suitable distance of about 5 kms including loading, unloading, conveyance, labour charges, all leads and lifts and other incidental and operational charges etc., complete.
for Stone type Materials Conveyance
for Earth type Materials Conveyance
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BoQ-340-25-26.xlsx
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .