Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC L1 Accepted | |
| 2 | L2₹1.7 L+₹8,990 (5.50%)Rejected-AOC | L2 | Rejected-AOC L2 Accepted |
Tender Value
₹1.8 L
EMD Value
₹4,444
Closing Date
28 Sept 2024, 4:00 pmClosed
Manilal K M
O/o Office of the Assistant Executive Engineer, KIP RB Sub Division No II Thenmala
During water distribution through the canal, there is a possibility of waste wood logs, and sedimentation accumulating inside the tunnel. This accumulation affects the free flow of water through the tunnel.
2024_Irrig_691692_1
IRR/PII/TR/2724/2024_5_1_1/1
Open Tender
Civil Works - Canal
Item Rate
180 days
Karavaloor
Please refer Tender documents.
7 documents required · 7 mandatory
₹655
Yes
₹4,444
Yes
30 Oct 2024
20 Sept 2024
1 Oct 2024
20 Sept 2024
28 Sept 2024
20 Sept 2024
Amount
Maintenance of Tunnel
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD6779/2024-2025:Engaging labour for removing waste accumulated inside the tunnel and deposting it in a suitable location as per the direction of officer in charge
OD6783/2024-2025:Engaging labour for cutting wooden logs trapped inside the tunnel and deposit it in a suitable location as per the direction of officer in charge
OD6784/2024-2025:Transporting wooden logs and other waste materials held inside the tunnel to a suitable location including fuel and driver as per the direction of officer in site
26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make
26.32.2:Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).25 mm average thickness in 2 layers.
OD6785/2024-2025:Providing temporary lighting and ventilation during execution of removal of waste, logs . Supplying fixing operating and removing the same including fuel and conveyance charge etc complete
JAYAMON JOSEPH
Bidder Name
GEO THOMAS
JAYAMON JOSEPH
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1076993.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .