DY.CITY ENGINEER (SOUTH ZONE)
RCC Road construction and Paver Block Installation and other necessary work as per requirement inside Kankaria Lake at maninagar ward south zone
312557
Tender Notice No 2 Tender No 92
Open
Miscellaneous Works
Ahmedabad
5 documents required · 5 mandatory
₹900
municipal commissioner
₹10,000
8 Jun 2026
8 Jun 2026
8 Jun 2026
16 Jun 2026
8 Jun 2026
Providing and laying cement concrete 1:3:6 (1-Cement : 3-
coarse sand : 6- hand broken stone aggregates
mmnominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth (SOR BUILDING
WORKS AHMEDABAD CITY (WITHOUT GST) YEAR:-2023-
Providing and laying cement concrete 1:4:8 (1-Cement : 4-
coarse sand : 8- hand broken stone aggregates 40 mm
nominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth (SOR BUILDING
WORKS AHMEDABAD CITY (WITHOUT GST) YEAR:-2023-
Providing and laying cement concrete 1:5:10 (1- Cement :
5- Coarse sand : 10- hand broken stone aggregates 40 mm
nominal size) and curing complete excluding cost of
formwork in (A) Foundation and Plinth (SOR BUILDING
WORKS AHMEDABAD CITY (WITHOUT GST) YEAR:-2023-
Providing and laying in position Ready Mixed M-
grade concrete for reinforced cement conctere work
using cement content as per approved Design Mix
manufactured in fully automatic batching plant and
transported to site of work in transit mixer for a lead up
to 10 kms having continuous agitated mixer,
manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of
R.M.C. from transit mixer to site of laying, excluding the
cost of centering shuttering finishing and reinforcement
including cost of admixtures in recommended proportions
as per IS: 9103 to accelerate/ retard setting of concrete,
improve workability without impairing strength and
durability as per direction of the Engineer - in - charge.
Without Fly Ash (Min cement level as per latest IS
shall be maintained)
SOR 23-24 IT CD NO :
Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification
including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by
tipper to site, laying in uniform layers in sub- base /
base course on well prepared surface and compacting
with vibratory roller to achieve the desired density as
per Codal Provision.
a 55 Production & Supply of WMM 1975 Cum
b 55 Laying of WMM 35 Cum
Repairing damaged M.H. and rasing M.H. up to road
level incl. removing damaged brick work and repairing
by brick masonry in C.M. 1:5 and plaster in C.M. 1:3
and fixing C.I. steps and existing MH sheet cover,
removing the debris from MH and carting the same as
a 1 (A) up to 0.15 mt. (@ Two Coarse) 728.82 No.
b 1 (B) up to 0.35mt. (@ Four Coarse) 1,155.44 No.
c 1 (C) up to 0.65 mt. (@ Seven Coarse) 1,786.49 No.
Providing & Supplying ISI Standard RCC pipes (of
sulphate resisting cement) in a standard lengths of
following class & dia meter suitable for socket-spigot
type including all taxes , insurance, transporation, freight
charges, octroi, inspection charges, loading, unloading,
conveyance to departmental stores, staking etc
complete (IS 458:1989) Class NP-3, test pressure
0.7/kg/sqcm. Rate also includes supplying RCC collar
for RCC pipes including taxes, carting, loading,
unloading, etc complete. Including labour work for
lowering, laying, jointing, RCC pipes in CM 1:1 1/2
of following diameters in proper position, grade and
alignent at all as directed by engineer in charge.
inlcuding conveyance from store to site of work
labour giving hydraulic testing and all
necessary testing as per IS code (RCC pipe Horizontal cast)
a 1 300 mm internal diameter 888.37 Rmt
b 1 450 mm internal diameter 1539.32 Rmt
c 1 600 mm internal diameter 2212.85 Rmt
Providing, laying and jointing in true line and level UPVC
pipe (SCH-40) of following dia. Including fittings of
standard make as approved by Engineer-in-charge.
a 1 15mm (IT CD NO 23061) 71.93 Rmt
b 1 25 mm (IT CD NO 23062) 90.93 Rmt
c 1 40 mm (IT CD NO 23064) 146.65 Rmt
d 1 50 mm (IT CD NO 23065) 193.73 Rmt
Providing and supplying,and jointing ISI mark only
standard length stoneware pipes of following class
and diameter including excavation for laying of
pipes, insurance, transportation, freight charges,
octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc.
13 compl. (IS651/1989 or its latest revision) including
labour work for lowering, laying, joiting with cement
mortar (1:1) proportion, proper postion, grade and
alignment and all level as directed by engineer in charge
including store to site of work jointing material etc
a 1 100 mm dia (IT CD NO 24001AA) 211.05 Rmt
b 1 150 mm dia (IT CD NO 24001BA) 288.23 Rmt
c 1 230 mm dia 400.54 Rmt
Providing 15mm thick cement plaster in single coat on
Rough (Similar) side of single or half brickwalls for interior
14 1 plastering upto floor two level and finished even and 174.83 SMT
smooth in (i) Cement mortar 1:3 (1-cement:3-sand) SOR
Leveling or orientation of existing Gully Trap chamber
15 1 incl.nece.masonry in CM (1:6) and plaster in CM (1:3) etc. 71.43 No.
using old GT stone and cover etc.comp.
Constructing Bombay Pattern Type Catch Pit of size
0.60 x 0.60 depth up to 1 mt including excavation,
B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the
16 1 prop. of CM (1:6) with 40 mm thick IPS flooring in the 3110.80 No.
prop M15 at bottom and 15 mm thick cement plaster
inside the catch pit in the proportion of CM (1:3) with out
jali etc. comp. as directed.
Providing F.R.C. MH seat cover incl. carting to the work
site etc. comp. Directed.
F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers &
Frames Cover :728mm ø & 100 mm thick circular cover,
35.00 MT load design,100x2mm MS flat allround, 16mm ø
plain round bar for lifting the cover
a 1 & should be fitted with plastic cups. Frame : 560 mm ø 2843.00 SET
clear opening,outer size- 888x888x175 mm. On the upper
periphery of frame 25 x 3mm wide MS flat should be well
embed in concrete to protect theedges of frame. FRC
E.H.D.-35 manhole cover & frame described as
F.R.C. Heavy Duty [HD-20] Machinehole Covers - 560 mm
b 1 ø clearopening, The dimension of frame and cover as per 1458.00 SET
mentioned in Amend No.1 to IS 12592 : 2002 table
F.R.C. Medium Duty [MD-10] Machinehole Covers -
560mm ø clear opening, The dimension of frame and
cover as per mentioned in Amend No.1 to IS 12592 :
F.R.C. Medium Duty [MD-10] Chamber Covers & Frame-
600 x 450 mm nclear opening, The dimension of frame
and cover as per mentioned in Amend No.1 to IS 12592 :
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with
18 1 frame 600mm x 600mm clear opening etc. comp.. As 1167.49 No.
directed by engineer in charge.
Carting and Fixing M.H., Chamber or Catchpite Seat and
Cover in line and level to match exisisting road level in
19 1 C.C. 1:2:4 and finishing smooth, watering and protecting 746.59 No.
for 7 days etc. complete as directed. M.H. seat cover will
be supplied byA.M.C.(from any store)
Grating(Jali): 690x690x70mm square jali, 5:00 MT load
design, 70x2mm MS flat allaround,
Frame: 600x600mm clear opening, outer size-
800x800x120 mm.On the upper periphery of frame
25x3mm wide MS flat should be well embded in concrete
to protect the edges of frame.
FRC Strom Water Grating Cover (Jali) & frame described
as above. Refer Drwing
(SET Cover and frame)F.R.C Heavy Duty (HD-20)
Machinehole covers & Frames – 560 mm clear opening
,The dimension of frame and cover as per mentioned in
Amend No.1 to IS 12592:2002 table
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with
20 1 frame 600mm x 600mm clear opening etc. comp.. As 1377.64 No.
directed by engineer in charge.
Repairing damaged I.C./ Raising removing damaged
brick work and repairing by brick masonry in C.M. 1:5
21 1 and plaster in C.M. 1:3 and fixing C.I. steps and removing 396.00 No.
existing chamber sheet cover, removing the debris from
chamber and carting the same as directed.
Supplying and fixing of 380 mm H x 300 mm L x 200 mm B
Kerb block for Central Verge in M-20 grade using
mm nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for pre-cast
blocks, reasonably exposed finish/ formwork, mould
with well equipped with vibratory system for kerb
stones of approved design including curing, etc.
complete, including the cost of formwork etc.
complete. The rate shall also include necessary cutting of
22 1 asphalt, fixing the Kerb stones in line and level on 5 cm 431.96 Rmt
thick sand bedding with necessary equipments and
materials. The rate shall also include the flush pointing
in CM (1:3) for all joints of the kerbstones. Filling of
zari alone the sides of the kerb stone fixed with
Bituminous concrete mixed in proper position as
directed by Engineer in change to form a portable
mixture. In any case Gravel or such type of materials
shall not be allowed for production
a) Laying on 5 cm thick Sand Bedding
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-
H Kerb block for Footpath in M-20 grade using 20 mm
nominal size black trap aggregate of Sevaliya/Timba or
equivalent quality for pre-cast blocks, reasonably
exposed finish/ formwork , mould with well equipped
with vibratory system for kerb stones of approved design
including curing, etc. complete, including the cost of
formwork etc. complete. The rate shall also include
necessary cutting of asphalt, fixing the Kerb stones in line
and level on 5 cm thick sand bedding with necessary
equipments and materials. The rate shall also include the
flush pointing in CM (1:3) for all joints of the kerbstones.
Filling of zari alone the sides of the kerb stone fixed with
Bituminous concrete mixed in proper position as directed
by Engineer in change to form a portable mixture. In any
case Gravel or such type of materials shall not be allowed
for production.
a) Laying on 5 cm thick Sand Bedding
Pre cast concrete kerb Providing and fixing M25
Grade of concrete precast exposed / Fair finish /
texture finish kerb stones of approved make as per
approved sample of any size and any type. Kerbs
shall be fixed on the foundation prepared as per
approved design. The rate shall also include for erecting
and fixing the pieces in position for complete kerb system
with chamfered type of kerbs including necessary
24 1 accessories of kerb like radius kerb, angles and 1061.61 RMT
quadrant kerbs, droplet kerbs etc. complete as per
drawing. Kerb shall be fixed as paper joint without any
jointing material. However cement mortar shall be
provided at the backside of kerb stone joint. (Sample
must be approved) Cost of excavation, cutting , base
side filling shall includes as directed engineer - incharge in
above item description as per BOQ (a) 450 hight x 600x
150 mm high median kerb.
Pre cast concrete kerb Providing and fixing M25
Grade of concrete precast exposed / Fair finish /
texture finish kerb stones of approved make as per
approved sample of any size and any type. Kerbs
shall be fixed on the foundation prepared as per
approved design. The rate shall also include for erecting
and fixing the pieces in position for complete kerb system
with chamfered type of kerbs including necessary
25 1 accessories of kerb like radius kerbs, angles and 912.50 RMT
quadrant kerbs, droplet kerbs etc. complete as per
drawing. Kerb shall be fixed as paper joint without any
jointing material. However cement mortar shall be
provided at the backside of kerb stone joint. (Sample
must be approved) Cost of excavation, cutting , base
side filling shall includes as directed engineer - incharge
in above item description as per BOQ (b) 380 x 600 x
150 mm high Footpath kerb.
Providing and fixing pre-cast concrete kerb stone of
gray cement based concrete block 30cm length,30cm
height and 15cm thick of M200 grade concret as per
26 1 approved design and including excavation for fixing 376.43 RMT
in proper line and level,filling the joint with C:M 1:3
(1cement:3fine sand) etc complete. SOR 23-24 IT NO
Supplying and fixing for central verge 230 mm L x
mm Width x 680 mm H Supplying & Fixing in M-20 grade
using 20 mm nominal size black trap aggregate of
sevaliya/timba or equivalent quality for pre-cast
blocks,reasonably exposed finish/formwork,mould with
well equipped with vibratory system for kerb
stones of approved design including
curing,etc.complete,including the cost of
formwork etc.complete.THe rate shall also include
necessary cutting of asphalt,fixing the kerb stones in line
and level on 5 cm thick sand bedding with necessary
equipments and materials.The rate shall also include
the flush pointing in CM(1:3)for all joints of the
kerbstones.Filling of Zari alone the sides of the kerb
stone fixed with bituminous concrete mixed in proper
position as directed by engineer in charge to form a
portable mixture.In any case gravel or such type of
materials shall not be allowed for production.
Providing and Laying of Rubber Moulded Paver Block
Grey/Coloured 60 mm thick, M-35 Grade of any size ;
shape (Usually Uni-Paver Blocks) using black trap
good quality aggragate of 20 mm nominal size for
footpath, parking areas, service lanes and other
areas as mentioned in the drawing / instruction of
engineer in charge. Cost includes formworks using
rubber mould, Rate providing and laying paver blocks
as per required grading and specification. The paver
block shall be mechanically compacted. The work of
paving blocks shall be executed in line and level by
skill mason of flooring work only. It should be laid in such
a way that the no cutting of the paver block to be
necessary. if cutting of paver block necessary then it
should be cut by machine only and carting. The finished
surface of the paver block shall have resonably good,
plain finished. Paver blocks shall be compacted and shall
be relaid if necessary. Gravel or such type of materials
shall not be allowed for production.
Laying on 5cms thick sand beddding.
Providing and laying of interlocking grey paver blocks of
high density 80mm thick made from M-40 grade concrete
using 6 mm to 20 mm machine crushed well graded
stone aggregate, sand of approved quality, OPC 53 grade
cement with contractor's own concrete mix design as
approved by AMC, for parking, road. Cost Includes
formwork, using rubber/FRP mould, laying paver
block as per required grading and specification
laid paver block shall be mechanically compacted.
29 1 The work of the paving blocks shall be executed in line 572.00 SMT
and level by skilled mason of flooring work only. It
should be laid in such a way that the no cutting of the
paver block to be necessary. Cutting of paver block by
machine cut only and carting to be done. The
Finished surface of the Paver Block shall have reasonably
good plain finish. Paver blocks shall be compacted and
shall be re-laid if necessary. Gravel or such type of
materials shall not be allowed for production.
Laying on 5 Cms thick sand bedding.
Paver Block Providing and laying shot blasted Non -
interlocking, Paver blocks of specified thickness,
size, grade of concrete and colour machine made and
blasting by automatic shot blasting machine and high
density of as per approved sample of approved make
for footpath, parking areas, service lanes,cross over
and other areas as mentioned in the drawing.
Including providing and laying 50 mm thick averave
bedding layer of coarse sand below paver block as per
required grading and specification. Laid paver block
shall be mechanically compacted. The work of the
paving blocks shall be executed in line and level by
30 1 skilled mason of flooring work only. Small size of 669.65 SMT
paver block with same specification shall be used at
residue or at end. It should be laid in such a way that
the no cutting of the paver block to be necessary. If
cutting of paver block shall be required , than cut by
machine only and laying to be done by skilled flooring
mason. The finished surface of the paver block shall
have coarse sand Texture Finish. Pave blocks shall be
compacted and shall be re-laid if necessary. Actual laid
area shall be measured and paid without any
(A) 60 mm thick M-35 grade Grey Paver block of size
Paver Block Providing and laying shot blasted Non -
interlocking, Paver blocks of specified thickness, size,
grade of concrete and colour machine made and
blasting by automatic shot blasting machine and high
density of as per approved sample of approved make
for footpath, parking areas, service lanes,cross over
and other areas as mentioned in the drawing.
Including providing and laying 50 mm thick averave
bedding layer of coarse sand below paver block as per
required grading and specification. Laid paver block
shall be mechanically compacted. The work of the
paving blocks shall be executed in line and level by
skilled mason of flooring work only. Small size of
paver block with same specification shall be used at
residue or at end. It should be laid in such a way that
the no cutting of the paver block to be necessary. If
cutting of paver block shall be required , than cut by
machine only and laying to be done by skilled flooring
mason. The finished surface of the paver block shall
have coarse sand Texture Finish. Pave blocks shall be
compacted and shall be re-laid if necessary. Actual laid
area shall be measured and paid without any
wastage. (A) 80 mm thick M-35 grade Grey Paver
block of size 200mm x 200mm.
Labour work of fixing kurb any design of central verge,
(both side) footpath kurb, items includes necessary
excavation, asphalt cutting of any thickness, erecting in
32 100 line and position and pointing with cement mortar 136.40 RMT
(1:3), watering, etc complete, filling with zari along the
side of the kurb, the kurb stone fix prepared with
bitumnious top surface, as directed by engineer in charge.
Paver Block Providing and laying, Dished
Channel specified thickness, size, grade of concrete
and colour machine made and blasting by automatic
shot blasting machine and high density of as per
approved sample of approved make for suite drain
besides paking area and other areas as mentioned in
the drawing. Including providing and laying 50 mm
33 1 thick average bedding layer of coarse sand below 907.00 RMT
dished channel as per required grading and
specification. Laid dished channel shall be
mechanically compacted. The work of the dished
channel shall be executed in line and level by skilled
mason. Small size of dished channel with same
specification shall be used at residue or at end. If
cutting of dished channel shall be required , than cut
by machine only and laying to be done by skilled flooring
mason. Actual laid area shall be measured and paid
without any wastage. (A) 600 mm X 300 mm X 100 mm
thick M-25 grade Grey dished curved channel
MakeVYARA or Equivalent
Supply and installation of concrete bollard of size
300mm diameter x 900mm height, constructed using
34 1 M-30 concrete and 4nos 8mm dia MS Fe500 1725.00 No.
reinforcement through the section as directed by EIC
including supply of all
Construction of RCC nosing in central verge using M-200
grade cement concrete. The item includes cost of
centering & shuttering, reinforcement, both side cement
plaster in C:M 1:3 mortar & curing etc. complete. Half
round portion of the nosing shall be made by using mild
Providing, supplying and fixing precast C.C. blocks (M-20)
edge kerb having size of 75 x 300 x 300 mm depth and as
36 1 per design conveying it to the site, jointing into C:M 1:3 195.54 rmt
and racking out the joints incl. necessary excavation of
asphalt, soil etc..completed.
Supplying & Fixing Nimbhada ladi 37 to 50 mm thick for
walk way covering the activity of excavation, ramming,
37 1 laying on sand bedding as per requirement to fix the 236.60 Smt
Nibhada stone in Line & Level with cement pointing in
cement mortar 1:2 etc complete as directed.
Labour work for fixing interlocking blocks / any kind of
pavement on up to 50 mm th sand bedding, levelling,
watering and fixing in line & level as well cleaning the site
etc.comp. as directed. SOR-2016
Bitumen Cutting Labour Charges Of Cutting in bituminous
pavement.Cutting to be done with heavy duty tandom
cutting machine consist of dianond level.Minimum
Cutting Depth Shall be 75 mm From the finished
Level.Cutting Shall be perfectly in line.the width and
depth of the removal of asphalt towards kerb stone shall
be as per the drawing.bitumin Shall be Carefully Removed
39 1 so that the cutting edge towards the road should not be 127.00 Rmt
disturbed.The work of Removal of asphalt will be
considered in this item as running meter of the cutting
done by machine.one cutting line will be considered per
length of the kerb stone.Bitumen and Other Debrise shall
be disposed within 10.0 km.as per the instruction of the
engineer in charge.Surroundings Shall be cleaned to the
satisfaction of engineer in Charge
Supplying, fabricating and placing in position
reinforcement TMT bars Fe- 500, yield stress not less
than 500 N/mm2 bars confirming to IS-
reinforcement for RCC structure / items as per
design including transporting steel to the work site,
handling wastage, decoiling, cutting, bending, cranking,
fabricating to required shape, placing in position,
binding with 18 guage (1.22 mm) GI wires, welding if
necessary by using approved welding rods etc. for all
levels, all place, all height as per drawing etc.
complete as directed by the engineer-in-charge.
The quoted rate should be inclusive the cost of
binding wire, chairs, pins, brackets and the same will
not be measured and paid separately. (Rolling margin's
and wastage shall not be paid.) Measurement shall be
made on the length basis and convert into weight by
using standard co- efficient.
SOR 23-24 IT CD NO :05014C
Providing formwork of ordinary timber planking so as to
give a rough finish including centering shuttering strutting
and propping etc. Height of propping and centering below
supporting floor to ceiling not exceeding 4 M. and
removal of the same for in situ reinforced concrete and
plain concrete work in. (A) Foundations Footings Bases of
Columns etc. and Mass concrete. (SOR BUILDING WORKS
AHMEDABAD CITY (WITHOUT GST) YEAR:-2023-24)
P/A Tremix with dewartering machine and floater
machine on constructed CC work for finishing the surface
42 250 as per requirement. The rate including all machinaries, 48.21 SMT
labor, loading, unloading, transportaion etc complete as
per direction given by engineer in charge.
Making 15 mm. Groove in RCC work on road & filling it
43 83 with polysulfied selant & finished ot good incl. all labour 26.78 Rmt
charges etc. comp.as directed.
Providing & Supplying JCB Machine on rental basis in case
of emergency situation and break down type work & also
during unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel and
operating charges and stacking of useful & non-useful
materials separately up to store. (No payment should be
allowed for non working condition of machinery and for
pipe line excavation and laying work) (SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line - Machinery
Item No.4 Page no.7)
Hiring of Tractor with trolley considering 8 Hrs. As
45 1 working Day hours inclu. Driver (GWSSB SOR -22-23 2104.09 Day
Section 2E- Miscellenous Item no. 7)
Supplying, labour for excavation of all types of soil at any
depth including excavation of asphalt pavement of any
46 thickness,demolit ion of brick work in CM of any
proportion including stacking of serviceable materials and
disposal of unserviceable material etc. comp. as directed.
a 1 Mazdoor at day /night 452.00 No
b 1 Makadam/ supervision/Fitter at day / Night 474.00 No
Providing and suppplying Roller for compacting the road
47 1 bhuva with available building waste and Road waste 3571.43 Shift
material as and where directed by engineer in charge..
Rent for Providing Chota Hathi (Light weight vehicle) with
Driver at shown site incl. necessary oil/diesel/petrol for
vehical and all other charges.Work Done as per
Instruction of incharge etc. Complete as Directed.
The Rates are Exclusive of GST. Prevailing GST will be paid separately.
Contractor’s Quoted Rate
IN FIGURE IN WORDS
Net Quoted Tender Amount Rs.
Seal and Signature of the Bidder Additional City Engineer
mobile no. (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
"South Zone Office", Opp. Fire Station, Rambaug, Maninagar, Ahmedabad - 380
Municipal Commissioner invites online Percentage Rate sealed tenders from interested contractors for the
work mentioned below.
RCC Road construction and Paver Block Installation and other
1 Name of work necessary work as per requirement inside Kankaria Lake at
maninagar ward south zone (ARC)
2 Time Limit 12Months
3 Tender Validity Period 120 days from the date of submission of the tender
Register “E2” class in PWD in Govt. R&B/CPWD/AMC or
4 Eligibility Criteria
equivalent registration with any other state Govt. Or institutions.
Estimated Cost put to
Earnest Money Deposit Rs.10,000/- Demand Draft Or Bank Guarantee in favor of Municipal
Commissioner, Ahmedabad to be submitted as prescribed in tender.
5 % of the Tender Amount in form of Bank Guarantee / Demand
7 Security Deposit Draft in favor of Municipal Commissioner, Ahmedabad to be
submitted as prescribed in tender.
Tender fees Rs.900/-Demand Draft in favor of Municipal Commissioner,
(Non refundable) Ahmedabad)
In separate sealed cover each for EMD and Tender Fees along with
Submission of EMD and
Tender as described in the invitation of tender and submitted to
Assistant Manager(South zone), South zone office, Rambaug,
Maninagar Ahmedabad.
Tenders issue date Tenders from the amc.nprocure.com website shall be downloaded
from AS PER TENDER NOTICE INVITED
As per Notice inviting Tender / Addendum / Corrigendum.The
Last date of receiving
11 tenders received after latest schedule date and time will not be
entertained under any circumstances.
As per Notice inviting Tender / Addendum / Corrigendum to
Date of Opening
12 Assistant Manager / Dy.C.E.(S/Z) office, 2nd Floor, South Zone
Office, Opp. Fire Station, Maninagar, Ahmedabad-380008
Document shall be submitted in sealed envelope systems By
Mode of sending the RPAD/Speed post/ Hand Delivery in sealed covers in Duplicate (
Tender Documents One Original & One Duplicate) duly sign & seal by contractor .
14 Terms, Condition, & All general condition of contract mentioned in tender shall be
Specification applicable.
The contractor shall be responsible to make good and remedy at this
own expenses any defect which may developed or may be noticed
before the period mentioned here under from the certified date of
15 Defect &Liability Period completion, The within 15 days of receipts of the notice. In the case
of failure on the part of the contractor, the Engineer in charge may
rectify or remove or re-execute the work at the risk & cost of the
contractor. The Engineer in charge shall be entitled to appropriate
the whole or any part of the amount of security deposit towards they
expenses, If any, incurred by him in rectification, removal or re-
execution. The defect liability period shall be as under (a) for all
works costing up to Rs. 50,000 (amount put to tender), the period
shall be three months from the certified date of completion. (b) for
all works costing more than Rs. 50,000 and up to Rs. 1 crore
(Amount put to tender) ,the period shall be six (6) month from the
certified date of completion or one monsoon , which ever letter.(c)
the major project costing more than Rs. 1 crore , the period shall be
12 months from the certified date of completion which should
include one monsoon.(d) For building works , the period specified in
(a) ,(b) & (c) above or elapse of monsoon period following certified
date of completion, whichever is letter . For the purpose of deciding
the monsoon period, the 30 September may be treated as the last
0.1% per day delay of remaining work after the completion date but
16 Compensation for Delay
not more than 10% of cost of remaining works.
Water, Electricity Contractor shall have to make his own arrangements for water and
electricity for the purpose of work at site at his own expense
Terms, Condition, & All general condition of contract of Form B1 condition of contract
Specification shall be applicable.
Deduction of Retention Retention @ 2% of the value of work done will be deducted from
19 Money from each RA each RA bill. It will be released along with release of payment of
Bill Final Bill.
Addendum/Corrigendum If any Shall be Published 48 Hrs. Price To
the Final Submission Time And Date. The Same Shall From a part
20 Addendum/Corrigendum
Of Tender And The Same As to be Attached Along With The
Tender Document.
As per Account department circular no.37, date-09/08/2018 &
21 For ESIC & EPFO Act.
Circular no.27, date-07/01/2026
As per AMC Finance Department Circular No. 38 dated 21-11-2022.
22 GST The Rates are Exclusive of GST. Prevailing GST will be paid
Conditional tenders will not be accepted. Municipal Commissioner reserves the rights to
reject any or all the tenders without assigning any reasons thereof.
Seal and Signature of the Bidder Add. City Engineer
AHMEDABAD MUNICIPAL CORPORATION
ENGINEER DEPARTMENT
TECHNICAL SPECIFICATION
Name of Work : RCC Road construction and Paver Block Installation and other necessary
work as per requirement inside Kankaria Lake at maninagar ward south
Dismantling the following including loading, unloading and disposal of unserviceable material for all
lead or as directed by Engineer-In-Charge and stacking the serviceable material and backfilling the
resulting trenches and pits complete.
a. central verge -kerb stone.
b. Dismantling tiled or stone floors laid in mortar including stacking of serviceable material
and disposal of unserviceable material with all lead and lifts.
c. Demolition & disposal of unserviceable material with all lead and lift for unreinforced
d. Demolition of brick work & stone masonry including stacking of serviceable materials and
disposal of unserviceable materials with all lead and lift (1) In cement mortar.
e. Demolition including stacking of serviceable materials and disposal of unserviceable
materials with all lead and lift. (I) R.C.C work.
The demolition shall consist of demolition of one or more parts of the structure as specified or shown in
the drawings. Demolition implies taking up or down or breaking up. This shall consist of demolishing
whole or part of work including all relevant item as specified or shown in the drawings.
The demolition shall always be planned before hand and shall be done in reverse order of the one in
which the structure was constructed. Contractor is fully responsible for proper and safe demolition.
Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining work or
property, which is to be left intact, before dismantling and demolishing is taken up and the work shall
be carried out in such a way that no damages is caused to the adjoining property.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary precautions
shall be taken to keep the dust nuisance down as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to be damaged
by dropping from a height or demolishing roof, masonry etc. shall be carefully dismantled first. The
dismantled articles shall be properly stacked as directed.
All materials obtained from demolition shall be the property of Government unless otherwise d shall be
kept in safe custody until handed over to the Engineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out and
stacked properly as directed, with all lead and lift. All unserviceable materials, rubbish etc. shall b
stacked as directed by the Engineer-in-charge.
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition dismantling and no
allowance for increase in bulk shall be allowed. The demolition of lime concrete shall be measured
under this item. Specification for deduction for voids, openings etc. shall be on same basis as that
employed for construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following limits, unless
otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b) Area shall
be worked out to the nearest 0.01 sq. mt. (c,d,e) Cubical connection shall be worked out to the nearest
The rate shall include cost of all labour involved and tools used in demolishing and dismantling including
scaffolding. The rate shall also include the charges for separating out and stacking the serviceable
materials properly and disposing the unserviceable materials with all lead and lift. The rate also includes
for temporary storing for the safety of the portion not required to be pulled down or of adjoining
property and providing temporary enclosures or partitions where considered necessary.
The rate shall be for a unit of one cubic metre.
For Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors laid on
mortars shall be done Dismantling implies carefully taking up or down or these are fixed by nail screws
bolts etc. the shall be taken out with proper tools.
Mode of measurement & Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate shall
include stacking the unserviceable materials as directed will lead and lift.
The rate shall be for a unit of (a) RMT (b) one sq. Meter (C) CMT(d)Cu.m(e)Cu.m
Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC of thickness up
to 0.20 meter including demolishing the asphalt carpet, metal, soiling/cutting Reinforcement etc.
comp. with stacking the material as directed. (a) up to 0.20 meter thickness (By Manual)(b) 0.20 to
0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machine including cost of operator, fuel,
& transportation etc complete.(c) 0.30 meter & above (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, & transportation etc complete.
The Item shall be carried out as per Item description and as per instruction of Engineer-in-Charge
and/or his authorized representative.
The rate includes the cost of excavation of bituminous macadam i.e. bituminous layers only like DBM,
BC etc including the labours, tools, equipment and all other incidental expenses. Non Bituminous Sub-
layer/Sub base are not considered in this item.
Work shall be carried out manually or by Machinery as per site requirements.
The mode of payment for this item shall be on Smt. Basis.
Box cutting the road surface to proper slope and camber for making a base for road work including
removing the excavated stuff and depositing on the road side slope as directed upto 200Mt.lead.
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any such
ordinary excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under this
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone, materials
and rubbish of all kind, bush, wood and trees shall be removed as directed. The materials so obtained
shall be property of the Government and be conveyed and stacked as directed. within 200 M. lead. The
roots of the trees coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra will be
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor shall
assume full responsibility for alignment, elevation and dimension of each and all parts of the work.
Contractor shall supply laborers, materials, etc. required for setting out the reference marks and bench
marks and shall maintain them as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width and
depth as shown in the drawings or as directed. The contractor shall do the necessary shoring and
shutting or providing necessary slopes to a safe angle, at his own-cost. The payment for such
precautionary measures shall be paid separately if not specified. The bottom of the excavated area
shall be 1 evened both longitudinally and transversely. as directed by removing and watering as
required. No earth filling will be allowed for bringing it to level, if mistake or any other reason
excavation is made. deeper or wider that shown on the plan or directed. The extra depth or width shall
be made up with concrete of same proportion as specified for the foundation concrete at the cost of
the contractor. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or leveling the
ground in layer including ramming and watering etc. The balance of the excavated quantity shall be
removed by the contractor from the site of work to a place as directed with lead upto 200 M. and all lift.
Mode of measurement and payment :
The measurement of excavation in trenches for foundation shall be made according to the sections of
trenches shown on the drawing or as per sections given by the Engineer-in-charge. No payment shall be
made for surplus excavation made in excess of above requirements or due to slopping and sloping back
as found necessary on account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated
rock, fly ash, aggregates of any kind Including spreading & levelling etc. complete.
• (a)Lead Upto 1 Km.
• (b)Lead From 1 Km to 2 Km.
• (c)Lead From 2 Km to 3 Km
• (d)Lead From 3 Km to 4 Km
• (e)Lead From 4 Km to 5 Km
• (f)Lead From 5 Km to 10 Km
• (g)Lead From 10 Km to 15 Km
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly
ash, aggregates of any kind is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be disposed off within a lead of
200 meters or as per instruction given by Engineer in charge. Useful materials obtained from clearing
site and excavation shall be stacked and used within the work site. Internal conveyance above
mt within the work site i.e. From starting chainage to End chainage of a given road WILL NOT BE
PAYABLE. Materials suitable for construction of Embankment, earthen shoulder and subgrade shall
be stacked at convenient places within a work site for reuse. No extra payment will be paid to the
contractor for stacking of earth within the work site and reused for the construction of Embankment
layer, sub grade and earthen shoulder purpose. Only surplus earth shall be disposed off outside the
work site as per instruction given by Engineer-In-charge. Useful stones from rock excavation shall be
stacked nearly within a lead of 50 M. and will be allowed to be used by the contractor on payment
at rates laid down in the contract or if not so aid down, at schedule of rates of the Division or at a
mutually agreed rates if there are no such rates in the Schedule of rates.
If surplus materials are required to be conveyed outside the work site i.e. Outside conveyance from a
particular stretch of given road will be paid in this item as per instruction of Engineer in charge. No
bulkage of disposed earth will be considered for the payment.
The rate shall be for a unit of one cubic metre.
Providing and laying cement concrete 1:3:6 (1-Cement : 3- coarse sand : 6- hand broken stone
aggregates 40 mmnominal size) and curing complete excluding cost of formwork in (A) Foundation
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials
and watered and rammed as directed. The proportion of cement, sand and hand broken stone
aggregates shall be one part of cement, 3 parts of coarse sand, 6 parts of hand broken stone aggregates
and shall so measured by volume. The concrete shall be mixed in a mechanical mixer at the site of work.
Hand mixing may however be allowed for smaller quantity of work if approved by the Engineer-
incharge. When hand mixing is permitted by the Engineer-in charge in case of breakdown of
machinery’s and in the interest of the work. it shall be carried out on a water tight platform and care
shall be taken to ensure that mixing is continued until the mass is uniform in colour and consistency.
The quantity of water shall be sufficient to produce a dense concrete of required workability for the
purpose. The concrete shall be handled from the place of mixing to the final position in not more than
15 minutes by the method as directed and shall be placed into its final position, compacted and finished
within 30 minutes of mixing with water i.e. before the setting commences. The concrete shall be laid in
layers of 15 cms. to 20 cms. The concrete shall be rammed with heavy iron rammers and rapidly to get
the required compaction and to allow all the gaps to be filled with mortar. After the final set, the
concrete shall be kept continuously wet, if required by pounding for a period of not less than 7 days
from the date of placement The concrete shall be measured for its length breadth and depth, limiting
dimensions to those specified on plan or as directed.
Mode of measurements shall be on CMT basis
Providing and laying cement concrete 1:4:8 (1-Cement : 4- coarse sand : 8- hand broken stone
aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials
and watered and rammed as directed. The proportion of cement, sand and hand broken stone
aggregates shall be one part of cement, 4 parts of coarse sand, 8 parts of hand broken stone aggregates
and shall so measured by volume. The concrete shall be mixed in a mechanical mixer at the site of work.
Hand mixing may however be allowed for smaller quantity of work if approved by the Engineer-
incharge. When hand mixing is permitted by the Engineer-in charge in case of breakdown of
machinery’s and in the interest of the work. it shall be carried out on a water tight platform and care
shall be taken to ensure that mixing is continued until the mass is uniform in colour and consistency.
The quantity of water shall be sufficient to produce a dense concrete of required workability for the
purpose. The concrete shall be handled from the place of mixing to the final position in not more than
15 minutes by the method as directed and shall be placed into its final position, compacted and finished
within 30 minutes of mixing with water i.e. before the setting commences. The concrete shall be laid in
layers of 15 cms. to 20 cms. The concrete shall be rammed with heavy iron rammers and rapidly to get
the required compaction and to allow all the gaps to be filled with mortar. After the final set, the
concrete shall be kept continuously wet, if required by pounding for a period of not less than 7 days
from the date of placement The concrete shall be measured for its length breadth and depth, limiting
dimensions to those specified on plan or as directed.
Mode of measurements shall be on CMT basis
Providing and laying cement concrete 1:5:10 (1- Cement : 5- Coarse sand : 10- hand broken stone
aggregates 40 mm nominal size) and curing complete excluding cost of formwork in (A) Foundation
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials
and watered and rammed as directed. The proportion of cement, sand and hand broken stone
aggregates shall be one part of cement, 5 parts of coarse sand, 10 parts of hand broken stone
aggregates and shall so measured by volume. The concrete shall be mixed in a mechanical mixer at the
site of work. Hand mixing may however be allowed for smaller quantity of work if approved by the
Engineer-incharge. When hand mixing is permitted by the Engineer-in charge in case of breakdown of
machinery’s and in the interest of the work. it shall be carried out on a water tight platform and care
shall be taken to ensure that mixing is continued until the mass is uniform in colour and consistency.
The quantity of water shall be sufficient to produce a dense concrete of required workability for the
purpose. The concrete shall be handled from the place of mixing to the final position in not more than
15 minutes by the method as directed and shall be placed into its final position, compacted and finished
within 30 minutes of mixing with water i.e. before the setting commences. The concrete shall be laid in
layers of 15 cms. to 20 cms. The concrete shall be rammed with heavy iron rammers and rapidly to get
the required compaction and to allow all the gaps to be filled with mortar. After the final set, the
concrete shall be kept continuously wet, if required by pounding for a period of not less than 7 days
from the date of placement The concrete shall be measured for its length breadth and depth, limiting
dimensions to those specified on plan or as directed.
Mode of measurements shall be on CMT basis
Providing and laying in position Ready Mixed M-200 grade concrete for reinforced
cement conctere work, using cement content as per approved Design Mix manufactured
in fully automatic batching plant and transported to site of work intransit mixer for a lead
up to 10 kms having continuous agitated mixer, manufactured as per mix design of specified
grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer
to site of laying, excluding the cost of centering shuttering finishing and reinforcement
including cost of admixtures in recommended proportions as per IS:9103 to accelerate/
retard setting of concrete, improve work ability without impairing strength and durability as
per direction of theEngineer-in-charge. Without Fly Ash (Min cement level as per latest IS456 shall
be maintained) (Cement level 400 kg ) (R&B SOR 21-22 Item code 5055)
Water shall conform to M-1.
Cement shall conform to M-3.
Sand shall conform to M-6.
Coarse Aggregate
Coarse Aggregate shall conform to M-12.
CPWD specifications of item no. 5.4.1, 5.4.2, 5.4.3, 5.4.4, 5.4.5, 5.4.6 shall be followed. The relevant
specifications of item no. 2.08 and 2.01 shall be followed.
Before quoting the rate, contractor shall confirm the exposure condition for the design of concrete.
Mix design shall be carried out for environmental exposure condition as given in IS 456:2000 page 18 table
All concrete work shall have fair finish concrete surface unless otherwise specified.
For exposed concrete element specified in the drawing fair finish steel shuttering made out of MS
sheet not less than 14 gauge/ laminated plywood and supporting frame work shall be of steel. Proper
care shall be taken in MS shuttering at the time of concreting during monsoon to achieve rust free
concrete surface. The concrete surface shall be rendered if required to give fair finish.
For other concrete shuttering material shall be as follows:
Columns: Moulds from marine ply with wooden battens or MS steel plates
Straight walls / Curved wall in plan: Marine plywood with wooden battens of Acro make or
equivalent make plates and soldiers.
Beam: Bottom - timber / steel plates, Sides - Steel plates / marine ply with battens
The concrete shall be designed as per relevant IS code- IS 10262 and SP 23, with or without chemical
admixture to provide the grade of concrete having required workability and characteristicstrength as per
IS 456:2000. The proportion of cement, sand and coarse aggregates shall be determined by weight. The
weight batch machine shall be used for maintaining proper control over the proportion of aggregates as
per mix design. The design mix shall be got approved by Engineer in-charge before starting the concrete
work. The minimum cement content shall depend on the exposure condition of the concrete. The
minimum cement content given in table (IS 456:2000, table 5) shall be adopted irrespective of whether
the contractor achieves the desired strength with less quantity of cement. The strength requirements of
different grades of concrete shall be as under :
Grade of Compressive strength of 15 cm. cubes in N/mm
Concrete at 7 and 28 days conducted in accordance with IS : 516-1959.
At 7 days At 28 days Max size of agg. In mm
In cases, the 28 compressive strength specified in above table be the
all days criteria for
acceptance or rejection of the concrete.
Where the strength of a concrete mix as indicated by tests, lies in between the strength of any two
grades specified in the above table, such concrete shall be classified in for all purposes as concrete
belonging to the lower of the two grades between which its strength lies.
The Contractor shall take necessary care to avoid sand streaks, air holes, honey combining etc., on
finished concrete surface.
The proportions for ingredients chosen shall be such that concrete has adequate workability for
conditions prevailing on the work and the supply of properly graded aggregate of uniform quality can be
maintained till the completion of work. Grading of aggregate shall be controlled by obtaining the coarse
aggregate, in different sizes and blending them in the right proportions as required. Aggregate of
different sizes shall be stocked in separate stock piles. The required quantity of material shall be stock
piled several hours, preferably a day before use. The grading of coarse and fine aggregate shall be
checked as frequently as possible, the frequency for a given job being determined by the Engineer-in-
charge to ensure that the suppliers are maintaining the uniform grading, as approved for samples used
in the preliminary tests.
In proportioning concrete, the quantity of both cement and aggregate shall be determined by
weight. Where the weight of cement is determined by accepting the maker's weight per bag a
reasonable number of bags shall be weighed separately, to check the net weight, where cement is
weighed from bulk stocks at site and not by bags. It shall be weighed separately from the aggregates.
Water shall either be measured by volume in calibrated tanks or weighed. All measuring equipment
shall be maintained in clean and serviceable condition. Their accuracy shall be periodically checked and
calibrated in standard laboratory.It is most important to keep the specified water cement ratio constant
and at its correct value. Moisture content in both fine and coarse aggregates shall be determined by the
engineer-in- charge according to the weather conditions. The amount of mixing water shall then be
adjusted tocompensate for variations in the moisture content. For the determination of moisture content
in the aggregates IS : 2386 (Part III) shall be referred. Suitable adjustments shall also be made in the
weights of aggregates due to variation in their moisture content.
The minimum cement content for the various mixes shall be as per IS: 456-2000.
All RCC works shall be carried out as per the detailed drawings and direction of Architects and
Engineer-in-charge. The concrete shall be placed at all heights, levels and for all shapes.
Mode of Measurement and Payment
The relevant specifications of item no. 5.4.11.1, 5.4.11.4, 5.4.11.5, 5.4.12, 5.4.13 shall be followed.The
rate shall be included or exclude the cost of centering and shuttering will be as specified in theitem.
The rate shall be inclusive of chemical admixture like plasticizer etc. as directed by the engineer-in-
charge. No extra payment shall be paid for.
The rate shall be for a unit of one cum. The cost of formwork shall be included as excluded as per
the item description.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant carriage of
mixed Material by tipper to site, laying in uniform layers in sub- base / base course on well prepared
surface and compacting with vibratory roller to achieve the desired density as per Codal Provision.
Production & Supply of WMM
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular
material, premixed with water, to a dense mass on a prepared sub-grade/sub- base/ base or existing
pavement as the case may be in accordance with the requirements of these Specifications. The material
shall be laid in one or more layers as necessary to lines, grades and cross-sections shown on the
approved drawings or as directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When
vibrating or other approved types of compacting equipment are used, the compacted depth of a single
layer of the sub-base course may be upto 200 mm with the approval of the Engineer.
Materials Aggregates
Physical Requirements
Coarse aggregates shall be crushed stone. If crushed gravel/shingle is used, not less than 90 percent by
weight of the gravel/shingle pieces retained on 4.75 mm sieve shall have at least two fractured faces.
The aggregates shall conform to the physical requirements set forth in Table.
If the water absorption value of the coarse aggregate is greater than 2 percent, the soundness test shall
be carried out on the material delivered to site as per IS:2386 (Part-5).
Table : Physical Requirements of Coarse Aggregates for Wet Mix Macadam for Sub-base/Base Courses
S.NO Test Test Method Requirements
Los Angeles Abrasion valueor IS:2386 (Part-4) IS:2386 40 percent (Max.)
(Part-4) orIS:5640
1) Aggregate Impact value 30 percent (Max.)
2) Combined Flakiness and IS:2386(Part-1) 35 percent (Max.)*
Elongationindices (Total)
* To determine this combined proportion, the flaky stone from a representative sample should
first be separated out. Flakiness index is weight of flaky stone metal divided by weight of stone sample.
Only the elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation
index is weight of elongated particles divided by total non-flaky particles. The values of flakiness index
and elongation index so found are added up.
9.1.2 Grading Requirements
The aggregates shall conform to the grading given in Table.
Table: Grading Requirements of Aggregates for Wet Mix Macadam
IS Sieve Designation Percent by weight passing the IS Sieve
600.00 micron 8-22
75.00 micron 0-5
Material finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be graded from coarse to fine and shall not
varyfrom the low limit on one sieve to the high limit on the adjacent sieve or vice versa.
Construction OperationsPreparation of Base
Clause 404.3.1 shall apply.
Provision of Lateral Confinement of Aggregates
While constructing wet mix macadam, arrangement shall be made for the lateral confinement of wet
mix. This shall be done by laying materials in adjoining shoulders along with that of wet mix macadam
layer and following the sequence of operations described in Clause 404.3.3.
Preparation of Mix
Wet Mix Macadam shall be prepared in an approved mixing plant of suitable capacity having provision
for controlled addition of water and forced/ positive mixing arrangement like pugmill or pan type mixer
of concrete batching plant. The plant shall have following features:
i) For feeding aggregates- three/ four bin feeders with variable speed motor
ii) Vibrating screen for removal of oversize aggregates
iii) Conveyor Belt
iv) Controlled system for addition of water
v) Forced/positive mixing arrangement like pug-mill or pan type mixer
vi) Centralized control panel for sequential operation of various devices and precise process control
vii) Safety devices
Optimum moisture for mixing shall be determined in accordance with IS:2720 (Part-8) after replacing
the aggregate fraction retained on 22.4 mm sieve with material of 4.75 mm to 22.4 mm size. While
adding water, due allowance should be made for evaporation losses. However, at the time of
compaction, water in the wet mix should not vary from the optimum value by more than agreed limits.
The mixed material should be uniformly wet and no segregation should be permitted.
Spreading of Mix
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared sub-
grade/sub-base/base in required quantities. In no case shall these be dumped in heaps directly on the
area where these are to be laid nor shall their hauling over a partly completed stretch be permitted.
The mix may be spread by a paver finisher. The paver finisher shall be self-propelled of adequate
capacity with following features:
i) Loading hoppers and suitable distribution system, so as to provide a smooth uninterrupted
material flow for different layer thicknesses from the tipper to the screed.
ii) Hydraulically operated telescopic screed for paving width up to to 8.5 mand fixed screed beyond
this. The screed shall have tamping and vibrating arrangement for initial compaction of the
layer.Automatic levelling control system with electronic sensing device to maintain mat thickness and
cross slope of mat during laying procedure.
In exceptional cases where it is not possible for the paver to be utilized, mechanical means like motor
grader may be used with the prior approval of the Engineer. The motor grader shall be capable of
spreading the material uniformly all over the surface.
The surface of the aggregate shall be carefully checked with templates and all high or low spots
remedied by removing or adding aggregate as may be required. The layer may be tested by depth
blocks during construction. No segregation of larger and fine particles should be allowed. The
aggregates as spread should be of uniform gradation with no pockets of fine materials.
The Engineer may permit manual mixing and /or laying of wet mix macadam where small quantity of
wet mix macadam is to be executed. Manual mixing/laying in inaccessible/ remote locations and in
situations where use of machinery is not feasible can also be permitted. Where manual mixing/laying is
intended tobe used, the same shall be done with the approval of the Engineer.
After the mix has been laid to the required thickness, grade and cross fall/camber the same shall be
uniformly compacted to the full depth with suitable roller. If the thickness of single compacted layer
does not exceed 100 mm, a smooth wheel roller of 80 to 100kN weight may be used. For a compacted
single layer up to 200 mm, the compaction shall be done with the help of vibratory roller of minimum
static weight of 80 to 100 kN with an arrangement for adjusting the frequency and amplitude. An
appropriate frequency and amplitude may be selected. The speed of the roller shall not exceed 5 km/h.
In portions having unidirectional cross fall/super elevation, rolling shall commence from the lower edge
and progress gradually towards the upper edge. Thereafter, roller should progress parallel to the center
line of the road, uniformly over-lapping each preceding track by at least one-third width until the entire
surface has been rolled. Alternate trips of the roller shall be terminated in stops at least 1 m away from
any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward
until the edges have been firmly compacted. The roller shall then progress gradually towards the centre
parallel to the centre line of the road uniformly overlapping each of the preceding track by at least one-
third width until the entire surface has been rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause
shall be corrected at once as specified and/or removed and made good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly
compacted with mechanical tampers or a plate compactor. Skin patching of an area without
scarifyingthe surface to permit proper bonding of the added material shall not be permitted.
Rolling should not be done when the sub-grade is soft or yielding or when it causes a wavelike motion in
the sub-base/base course or sub-grade. If irregularities develop during rolling which exceed 12 mm
when tested with a 3 m straight edge, the surface should be loosened and premixed material added or
removed as required before rolling again so as to achieve a uniform surface conforming to the desired
grade and cross fall. In no case shall the use of unmixed material be permitted to make up the
Rolling shall be continued till the density achieved is at least 98 percent of the maximum dry density for
the material as determined by the method outlined in IS:2720 (Part-8).
After completion, the surface of any finished layer shall be well-closed, free from movement under
compaction equipment or any compaction planes, ridges, cracks and loose material. All loose,
segregated or otherwise defective areas shall be made good to the full thickness of the layer and re
Setting and Drying
After final compaction of wet mix macadam course, the road shall be allowed to dry for 24 hours.
Opening to Traffic
No vehicular traffic shall be allowed on the finished wet mix macadam surface. Construction equipment
may be allowed with the approval of the Engineer.
Surface Finish and Quality Control of WorkSurface Evenness
The surface finish of construction shall conform to the requirements of Clause
Quality Control
Control on the quality of materials and works shall be exercised by the Engineer in accordance with
Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or
where the course is otherwise defective due to sub-grade soil getting mixed with the aggregates, the
full thickness of the layer shall be scarified over the affected area, re-shaped with added premixed
material or removed and replaced with fresh premixed material as applicable and re compacted in
accordance with Clause 406.3. The area treated in the aforesaid manner shall not be less than 5 m long
and 2 m wide. In no case shall depressions be filled up with unmixed and ungraded material or fines.
Arrangement for Traffic
During the period of construction, arrangements for traffic shall be done as per Clause
Measurements for Payment
Wet mix macadam shall be measured as finished work in position in cubic metres.
The Contract unit rate for wet mix macadam shall be payment in full for carrying out the required
operations including full compensation for all components listed in Clause 401.7.
The Measurement of the item shall be in Cum basis.
Repairing damaged M.H. and raising M.H. up to road level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing MH
sheet cover, removing the debris from MH and carting the same as directed.(a)upto 0.15mt.(@Two
coarse)(b)upto to 0.35mt.(@Four coarse (c)upto 0.65 mt.(@seven Coarse) (d)upto 0.90mt.(@Ten
This item relates to repairing work of above item of machine hole with fixing existing seat at top & fixing
pre-cast FRC cover (medium duty) repairing up to 2.00 mt. depth. This item relates to repairing existing
machine hole of 1.40 x 1.00 or 1.00 x 0.75 mt. size with removing first existing seat & cover including
demolishing existing loose masonry work up to from GF level to depth if specified & up to same height
brick work in CM 1:5 shall be completed & after of that work plastering work in CM 1:3 shall also be
done. Rate including fixing existing or new (if not there) C.I. steps shall fixed at time of masonary work.
After completion of brick work & plastering same machine hole seat & cover fixing at top & casted it in
C.C. 1:2:4 etc. Measurements shall be given on no. of basis up to 2.00 mt. depth work.
For detailed specification refer R & B Department booklet for General Technical Specification
for building works.
Items also includes:
1. Proper Barricading to avoid accidents.
2. Removal of debris from site.
3. Compaction of Bitumen by Roller.
4. Applying tack coat before laying of Hotmix material.
The mode of payment for this item shall be on No. Basis.
Providing & Supplying ISI Standard RCC pipes (of sulphate resisting cement) in a standard lengths of
following class &dia meter suitable for socket-spigot type including all taxes , insurance,
transporation, freight charges, octroi, inspection charges, loading, unloading, conveyance to
departmental stores, staking etc complete (IS 458:1989) Class NP-3, test pressure 0.7/kg/sqcm. Rate
also includes supplying RCC collar for RCC pipes including taxes, carting, loading, unloading, etc
complete. Including labour work for lowering, laying, jointing, RCC pipes in CM 1:1 1/2 of following
diameters in proper position, grade and alignent at all as directed by engineer in charge. inlcuding
conveyance from store to site of work labour giving hydraulic testing and all necessary testing as per
IS code .(GWSSB SOR-2022-23, page no:15, Item no:10.2.A & 10.3 & section part 1&2 B labour section,
item no:11.B) (RCC pipe Horizontal cast) (a)300 mm internal diameter (b) 450 mm internal diameter
(c)600 mm internal diameter.
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or his
authorized representative.
The mode of payment for this item shall be on RMT. Basis.
Providing, laying and jointing in true line and level UPVC pipe (SCH-40) of following dia. Including
fittings of standard make as approved by Engineer-in-charge.
Work shall be carried out as per item description including cost of all labour and materials etc. complete
as directed. General standard practice of work is applicable.
The measurements shall be on RMT basis.
Providing and supplying, lowering, laying and jointing ISI mark only standard length stoneware pipes
of following class and diameter including all taxes (excluding GST), insurance, transportation, freight
charges, octroi, inspection charges, loading, unloading, conveyance to departmental stores, stacking
etc. compl. (IS651/1989 or its latest revision) Class AA (a) 100 mm dia (b) 150 mm dia (c) 250 mm dia.
Work shall be carried out as per item description including cost of all labour and materials etc. complete
as directed. General standard practice of work is applicable.
The measurements shall be on RMT basis.
Providing15mm thick cement plaster in single coat on Rough (Similar) side of single or half brickwalls
for interior plastering upto floor two level and finished even and smooth in (i) Cement mortar 1:3 (1-
Work shall be carried out as per item description including cost of all labour and materials etc. complete
as directed. General standard practice of making plastering is applicable.
The measurements shall be on SMT basis.
Leveling or orientation of existing gully trap chamber incl.nece. masonry in CM (1:6) and plaster in CM
(1:3) etc. using old GT stone and cover etc.comp..
Leveling or orientation of existing gully trap chamber incl.nece. masonry in CM (1:6) and plaster in CM
(1:3) etc. using old GT stone and cover etc.comp.
Constructing Bombay Pattern Type Catch Pit of size 600 mm x 600 mm & depth up to 1000 mm
including excavation, B.B.C.C. (1:5:10), 23 cms thick brick masonry wall in the prop. of CM (1:6) with
40 mm thick IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster inside the catch
pit in the proportion of CM (1:3) without jali etc. comp. as directed by E.I.C.
600mm x 600mm x 1000mm Depth
For detailed specification refer clause No. 24.44.1 of R & B Department booklet for General Technical
Specification for building works
• Extra Depth of Catch pit size 600mm x 600mm for every additional depth of 100 mm or
Part thereof beyond 1000mm depth upto 1500 mm depth
For detailed specification refer clause No.24.46 of R & B Department booklet for General Technical
Specification for building works.
Mode of measurement and payment
The contractor shall be responsible for any loss or damage to the catch pit up to the end of work. He
shall also be responsible for the cleaning all bituminous material from the catch pit.
The rate shall be for a unit of one No.
Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
A- F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover :728mm ø & 100 mm thick
circular cover, 35.00 MT load design,100x2mm MS flat allround, 16mm ø plain round bar for
lifting the cover & should be fitted with plastic cups. Frame : 560 mm ø clear opening,outer
size- 888x888x175 mm. On the upper periphery of frame 25 x 3mm wide MS flat should be
well embed in concrete to protect theedges of frame. FRC E.H.D.-35 manhole cover & frame
B- F.R.C. Heavy Duty [HD-20] Machinehole Covers - 560 mm ø clearopening, The dimension of
frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
C- F.R.C. Medium Duty [MD-10] Machinehole Covers - 560mm ø clear opening, The dimension of
frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table 1..
D- F.R.C. Medium Duty [MD-10] Chamber Covers & Frame- 600 x 450 mm nclear opening, The
dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
The rate shall be for a unit No.
Catch Pit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc. comp.. As
directed by Engineer-in-Charge and/or his authorized representative.
For detailed specification refer clause No. 24.35 of R & B Department booklet forGeneral Technical
Specification for building works.
The contractor shall be responsible for any loss or damage to the catch pit up to the end of work. He
shall also be responsible for the cleaning all bituminous material from the catch pit.
The rate shall be for a unit of one No.
Carting and Fixing M.H., Chamber or Catchpite Seat and Cover in line and level to match exisisting
road level in C.C. 1:2:4 and finishing smooth, watering and protecting for 7 days etc. complete as
directed. M.H. seat cover will be supplied byA.M.C.(from any store)
A- Grating(Jali): 690x690x70mm square jali, 5:00 MT load design, 70x2mm MS flat allaround,
B- Frame: 600x600mm clear opening, outer size-800x800x120 mm.On the upper periphery of frame
25x3mm wide MS flat should be well embded in concrete to protect the edges of frame.
C- FRC Strom Water Grating Cover (Jali) & frame described as above. Refer Drwing
C- (SET Cover and frame)F.R.C Heavy Duty (HD-20) Machinehole covers & Frames – 560 mm clear
opening ,The dimension of frame and cover as per mentioned in Amend No.1 to IS 12592:2002
The mode of measurnment shall be on No basis.
Catch Pit Jali Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc. comp.. As
directed by Engineer-in-Charge and/or his authorized representative.
For detailed specification refer clause No. 24.35 of R & B Department booklet forGeneral Technical
Specification for building works.
The contractor shall be responsible for any loss or damage to the catch pit up to the end of work. He
shall also be responsible for the cleaning all bituminous material from the catch pit.
The rate shall be for a unit of one No.
Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick masonry in C.M.
1:5 and plaster in C.M. 1:3 and fixing C.I. steps and removing existing chamber sheet cover, removing
the debris from chamber and carting the same as directed.
Relevant specification shall be followed as per item description : Repairing damaged I.C./ Raising
removing damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and
fixing C.I. steps and existing chamber sheet cover, removing the debris from chamber and carting the
same as directed.
The measurement shall be in Nos. basis of I.C.
Supplying and fixing of 380 mm H x 300 mm L x 200 mm B Kerb block for Central Verge in M-20 grade
using 20 mm nominal size black trap aggregate of Sevaliya/Timba/Ankodiya/Othwad or equivalent
quality for pre-cast blocks, reasonably exposed finish/ formwork, mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete, including the
cost of formwork etc. complete. The rate shall also include necessary cutting of asphalt, fixing the
Kerb stones in line and level on 5 cm thick sand bedding with necessary equipments and materials.
The rate shall also include the flush pointing in CM (1:3) for all joints of the kerb stones. Filling of zari
alone the sides of the kerb stone fixed with Bituminous concrete mixed in proper position as directed
by Engineer in change to form a portable mixture. In any case Gravel or such type of materials shall
not be allowed for production.
The specifiction of following materials shall be conforming with specification mentioned for relavent
material / items in General technical specification for building work of R&B Department of Gujarat.
Water shall conform to M-1
Graded stone aggregate 20 mm. nominal size to M-10
Contractor shall have to manufacture the blocks as per the dimensions given in the drawing. Specific
machineries shall be used to manufacture the precast blocks. These machineries should be compatible
to produce blocks of required strength and dimensions. The machine shall contain hydraulic Press or
advanced equipment to generate required compaction & Grade and finish. Moulds/ Steel Plates/ Dies of
the machine shall be dimensionally checked & to be got approved before commencing the production.
Contractor shall prepare proper Drying Yard for keeping the blocks before curing. The drying yard shall
be levelled and covered so that no shrinkage cracks are formed. Contractor shall prepare adequate size
curing pond to cure the blocks for not less than 21 Days. No other means of curing shall be allowed.
The technical specification of concrete shall confirm to IS 456-2000. The concrete mix is not required to
be designed and only nominal mix as per IS: 456-2000 shall be followed. The proportion of the concrete
mix shall be 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm. nominal size) by
volume. Concrete work shall have fairly exposed concrete surface or as specified in the item. The
designation ordinary M-10, M-15, M-20, M-25 specified as per I.S. corresponds approximately to 1:3:6,
1:2:4, 1:1.5:3 and 1:1:2 nominal mix of ordinary concrete, by volume respectively. The ingredients
required for ordinary concrete containing one bag of cement of 50 Kg. by weight (0.0342 m3.) for
different proportions of mix shall be as per IS 456-2000. The proportion of the aggregate for the kerb
stone shall be modified as per the approval of the engineer-in-charge. The water cement ratios shall not
be more than those specified as per IS. The cement of the mix shall be increased, if the quantity of
water in a mix has to be increased to overcome the difficulties of placement and compaction so that the
water cement ratio specified in the table is not exceeded. The maximum size of coarse aggregate shall
be as large as possible within the limits specified but in no case greater than 1/4th of the minimum
thickness of the member, provided that the concrete can be placed without difficulty so as to surround
all reinforcement thoroughly and to fill the corners of the form. For reinforced concrete work, coarse
aggregates having a nominal size of 20 mm. are generally considered satisfactory. Admixture shall be
used in concrete only with approval of the Engineer-in-charge based upon the evidence that with the
passage of time, neither the compressive strength of concrete is reduced nor are other requisite
qualities of concrete impaired by the use of such admixtures.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of
kg weight. The volume of one such bag can be taken as 0.0342 m3. Boxes of suitable sizes shall be used
for measuring sand and aggregate. The size of the boxes (internal) shall be 30cm. x 30 cm. and 38 cm.
deep. While measuring the aggregate and sand, the box shall be filled without shaking ramming or
hammering. The proportioning of sand shall be on the basis of its dry volume and in case of damp sand;
allowances for bulk age shall be made.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be
kept in first class working condition and maintained throughout the construction. Measured quantity of
aggregate, sand, and cement required for each batch shall be poured into the drum of the mechanical
mixer while it is continuously running. After about half a minute of dry-mixing, measured quantity of
water required for each batch of concrete mix shall be added gradually and mixing continued for
another one and a half minute. Mixing shall be continued till materials are uniformly distributed and
uniform colour of the entire mass is obtained and each individual particle of the coarse aggregate shows
complete coating of mortar containing its proportionate amount of cement. In no case shall the mixing
be done for less than 2 minutes after all ingredients have been put into the mixer. Mixers which have
been out of use for more than 30 minutes shall be thoroughly cleaned before putting in a new batch.
Unless otherwise agreed to by the Engineer-in-charge, the first batch of concrete from the mixture shall
contain only 2/3rds of normal quantity of coarse aggregate. Mixing plant shall be thoroughly cleaned
before changing from one type of cement to another.
The degree of consistency which shall depend upon the nature of the work and methods of vibration of
concrete shall be determined by regular slump tests in accordance with IS: 1199-1959. The slump of
mm. to 25 mm. shall be adopted when vibrators are used.
All Moulds shall be cleaned and made free from standing water, dust, snow, or ice immediately before
placing of concrete.
Formwork/Metal Mould for exposed concrete surface (If indicated):
All the moulds shall be checked for exact dimensions of the precast blocks. All the edges of the precast
blocks shall confirm the profile of the final drawing & edges/ curvatures of the moulds shall be checked
accordingly. Moulds shall be regularly checked for correctness of dimensions of Blocks, twists, bends
due to handling, etc. Before starting every days work.
Care shall be taken to set all form work/Mould in perfect line, level (or in required camber or slope as
specified) and plumb. Form work/Mould propping shall be strong, rigid, and sturdy. The form
work/Mould shall be as per pattern & design shown in drawings. Form work/Mould shall be done
accurately and precisely so as to achieve neat, clean and smooth concrete surface, in line, level and
plumb. Clinks, twists, offsets, warps, riveting etc. in plates or forms shall not be allowed. Before placing
concrete, forms shall be thoroughly cleaned off of all rust, dust, and loose materials. Colourless oil or
grease of approved quality shall be applied before placing steel. Also the form work material will be of
wood/plywood/steel or any sort of such material, as approved by the Engineer-in-Charge and/or his
authorized representative; so that all exposed concrete surfaces have uniform colour.
For all kind of exposed concrete work only one brand (to be approved by the Engineer-in charge) of
cement shall be used.
Removal of Moulds:
Specific time shall be identified for removal of moulds, such that the concrete of the precast blocks shall
gain strength to withstand the stresses generated due to self weight and handling to drying yards
without any deformation to shape/ dimensions/ edges.
Sufficient time shall be given to the block after it is removed from the mould so that it can gain strength
and dry in shade to prevent any cracks due to shrinkage. This shall be done in drying yards.
Curing of block shall be done only in curing pond and curing shall be done for minimum 14 days.
Drying period after removing from pond & before delivery to site: Water should be drained of from the
block before it is actually sent to the site. Time should be provided for proper draining of water which
may be present in the block kept for curing in the pond.
Precaution shall be taken while transporting of the blocks to site.
The blocks should be loaded and unloaded with due care so as to avoid generation of stresses leading to
breaking of block. Care should be taken to prevent the block from breaking during transporting.
The pits of the size 150mm in width and required depth shall first be excavated, true to line and level.
The relevant specifications of item A- 1 shall be followed for excavation work. The pits shall be filled
with a layer of 50mm. thick sand bedding. The curbs then shall be placed in position of which 50mm.
shall be below road. Care should be taken to maintain proper line and level. The joints between the
kerbs shall be pointed with C.M. 1:2 and cured for minimum seven days.
Sampling and testing of concrete:
Samples from fresh concrete shall be taken as per IS : 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with IS : 516-1959. A random sampling
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of being
tested i.e. the sampling should be spread over the entire period of concreting and cover all mixing units.
At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each sample,
for testing at 7 days, and the remaining 5 at 28 days. The samples of concrete shall be taken on each
day of the concreting as per above frequency. The number of specimens may be suitably increased as
deemed necessary by the Engineer-in-charge when procedure of tests given above reveals a poor
quality of concrete and in other special cases. The average strength of the group of cubes cast for each
day shall not be less than the specified cube strength of 200 Kg/cm2 at 28 days. 20% of the cubes cast
for each day may have value less than the specified strength provided the lowest value is not less than
85% of the specified strength. If the concrete made in accordance with the proportions given for a
particular grade, does not yield the specified strength, such concrete shall be classified as belonging to
the appropriate lower grade. Concrete made in accordance with the proportions given for a particular
grade shall not, however, be placed in a higher grade on the ground that the test strength are higher
than the minimum specified. If rock pockets/honeycombs in the opinion of Engineer-in-charge are of
such an extent or character so as to affect the strength of the structure, materially or to endanger the
life of the steel reinforcement, he may declare the concrete defective and require the removal and
replacement of the portion of the structure affected.
Precast Kerb Stones:
The relevant specifications of concreting as per item above shall be followed except that work shall be
carried out for precast concrete kerb stones as specified in the item. All Precast members shall be cast
at workshop. Sufficient curing shall be done before placement of the same the method of transporting
and placing the precast members shall be as approved by the Engineer-in-charge. Members shall be so
transported that no breakage or undue stresses are induced in them. If required, all members shall have
a key provided on both the faces i.e top and bottom surfaces, of adequate size so as to fill the same
with concrete while laying. The function of this key is to avoid the leakage through the joint between
the precast member and the member on which it is laid.
Mode of Measurements and Payment :
The rate shall include cost of formwork and cost of reinforcement. The volume occupied by
reinforcement shall not be deducted from R.C.C. work.
The rate shall be for a unit of Rmt.
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for Footpath in M-20 grade
using 20 mm nominal size black trap aggregate of Sevaliya/Timba/Ankodiya/Othwad or equivalent
quality for pre-cast blocks, reasonably exposed finish/ formwork , mould with well equipped with
vibratory system for kerb stones of approved design including curing, etc. complete, including the
cost of formwork etc. complete. The rate shall also include necessary cutting of asphalt, fixing the
Kerb stones in line and level on 5 cm thick sand bedding with necessary equipments and materials.
The rate shall also include the flush pointing in CM (1:3) for all joints of the kerbstones. Filling of zari
alone the sides of the kerb stone fixed with Bituminous concrete mixed in proper position as directed
by Engineer in change to form a portable mixture. In any case Gravel or such type of materials shall
not be allowed for production.
Specification as per Item No. 42 only size of kerb as mentioned in Abstract.
Pre cast concrete kerb Providing and fixing M25 Grade of concrete precast exposed / Fair finish /
texture finish kerb stones of approved make as per approved sample of any size and any type. Kerbs
shall be fixed on the foundation prepared as per approved design. The rate shall also include for
erecting and fixing the pieces in position for complete kerb system with chamfered type of kerbs
including necessary accessories of kerb like radius kerb, angles and quadrant kerbs, droplet kerbs etc.
complete as per drawing. Kerb shall be fixed as paper joint without any jointing material. However
cement mortar shall be provided at the backside of kerb stone joint. (Sample must be approved) Cost
of excavation, cutting , base , side filling shall includes as directed engineer - incharge in above item
description as per BOQ (a) 450 mm high median kerb*600*150mm
Specification as per Item No.
Pre cast concrete kerb Providing and fixing M25 Grade of concrete precast exposed / Fair finish /
texture finish kerb stones of approved make as per approved sample of any size and any type. Kerbs
shall be fixed on the foundation prepared as per approved design. The rate shall also include for
erecting and fixing the pieces in position for complete kerb system with chamfered type of kerbs
including necessary accessories of kerb like radius kerbs, angles and quadrant kerbs, droplet kerbs
etc. complete as per drawing. Kerb shall be fixed as paper joint without any jointing material.
However cement mortar shall be provided at the backside of kerb stone joint. (Sample must be
approved) Cost of excavation, cutting , base , side filling shall includes as directed engineer - incharge
in above item description as per BOQ (b) 380 mm high Footpath kerb*600*150mm
Material: (1) Water shall conform to M-1. (2) Cement shall conform to M-3. (3) Sand shall
conform to M-6. (4) Stone aggregate shall conform to M-12 (5) Pre cast kerb shall be of
approved make and as per approved sample.
1.0 Workmanship :
2.1 All Precast exposed/ fare finish/ texture finish kerb stones shall be of approved make.Sufficient
curing shall be done before placement of the same.
2.2 The method of transporting and placing the precast members shall be as approved by theArchitect
and Engineer-in-charge. Members shall be so transported that no breakage orundue stresses are
induced in them.
2.3 The pits of the size 0.15 M in width and 0.23 M. in depth or as per site condition shall first be
excavated, true to line and level. The specifications for excavation shall be followed as per relevant
2.4 The pits shall be filled with a layer of 0.15 M. thick lean concrete M15. The kerbs shall be laid on
existing PCC base in true line and plumb. The specifications for PCC work shall be followed as per
2.5 The rate shall also include for erecting and fixing the pieces in position for complete Kerb systems
with Chamfered type of kerbs including all type of necessary accessories of kerb like Radius Kerbs,
Angles and Quadrant Kerbs, inlet kerbetc complete as per drawing.
The rate shall also include the flush pointing in CM (1:2) for all joints of the kerb stones.
3.0 Mode of Measurement & Payment:
3.1 The rate shall include the cost of material and labour for fixing the kerb system including laying,
jointing and finishing but excluding the cost of excavation, bitumen cutting, base PCC, zari filling with
bitumen material
3.2 The Measurement of the item shall be in Rmt basis.
Providing and fixing pre-cast concrete kerb stone of gray cement based concrete block 30cm
length,30cm height and 15cm thick of M200 grade concret as per approved design and including
excavation for fixing in proper line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
Work shall be carried out as per item description including cost of all labour and materials etc. complete
as directed. General standard practice of work is applicable.
Measurements for Payment:
The rate shall be for a unit of one Running meter.
Supplying and fixing for central verge 230 mm L x 235 mm Width x 680 mm H Supplying & Fixing in
M-20 grade using 20 mm nominal size black trap aggregate of Sevaliya/Timba/Ankodiya/Othwad or
equivalent quality for pre-cast blocks,reasonably exposed finish/formwork,mould with well equipped
with vibratory system for kerb stones of approved design including curing,etc.complete,including the
cost of formwork etc.complete.THe rate shall also include necessary cutting of asphalt,fixing the kerb
stones in line and level on 5 cm thick sand bedding with necessary equipments and materials.The rate
shall also include the flush pointing in CM(1:3)for all joints of the kerbstones.Filling of Zari alone the
sides of the kerb stone fixed with bituminous concrete mixed in proper position as directed by
engineer in charge to form a portable mixture.In any case gravel or such type of materials shall not be
allowed for production.
Work shall be carried out as per item description including cost of all labour and materials etc. complete
as directed. General standard practice of work is applicable.
The measurements shall be on Rmt basis.
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any
size ; shape (Usually Uni-Paver Blocks) using black trap good quality aggragate of 20 mm nominal size
for footpath, parking areas, service lanes and other areas as mentioned in the drawing / instruction of
Engineer-in-Charge and/or his authorized representative. Cost includes formworks using rubber
mould, Rate providing and laying paver blocks as per required grading and specification. The paver
block shall be mechanically compacted. The work of paving blocks shall be executed in line and level
by skill mason of flooring work only. It should be laid in such a way that the no cutting of the paver
block to be necessary. if cutting of paver block necessary then it should be cut by machine only and
carting. The finished surface of the paver block shall have resonably good, plain finished. Paver blocks
shall be compacted and shall be relaid if necessary. Gravel or such type of materials shall not be
allowed for production. Laying on 50 mm thick sand bedding.
• Laying on 50 mm thick sand bedding.
28.1 Scope of work :
Excavation and compaction up to 300 mm in height for footpath paving in all sorts of soil
murrumincluding sorting outs and stacking of useful materials stuff up to 50mt.
The scope of work includes manufacturing, supplying, and lying of precast paver blocks at various Retail
outlets. The work includes: Verification of the existing site condition and advising our project in charge
to lay suitable base course if required. Contractors are required to satisfy themselves with quality of sub
grade, sub-base course before the paver blocks are laid and suggest strengthening if required.
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
Manufacturing of paver blocks in your plant as per requirements in technical specification enclosed.
Supplying of paver blocks at site, including handling at both ends.
Laying of paver blocks at site as per requirement in technical specification on 50 mm thick sand
bedding, within shortest possible time the site is public place hence care should be taken to ensure that
the routine activities should not be disturbed. The job of laying may required to be carried out during
Testing of paver blocks shall through reputed Govt. /Non Govt. Test house only and submission of test
results as per requirements in Technical Specifications. AMC reserves the right to carryout test at
random. Cost for such tests to be borne by party. The contractor shall guarantee that all material and
components designed, fabricated, supplied, and laid by him shall be free from any type of defect due to
faulty material and/or workmanship/erection for a period of One year from the date of completion of
work. However, the contractor one year's shall render free maintenance.
TECHNICAL SPECIFICATIONS:
28.2 Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
28.2.1 Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of
compaction by application of hydraulic compaction and also by high intensity vibration to the
moulds. The machine should have automatic control panel
for uniformity in strength.
28.2.2 Concrete Batching & Mixing Plant: (Not essential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient
should be mixed in concrete Batching & Mixing plant with minimum capacity of 30 cum/hour.
The plant should equipped with automatic control panel for maintaining water cement ratio
from batch to batch to obtain concrete of uniform quality and strength. The plant should be
equipped with adequate mechanism for mechanized loading of raw materials into mixer and
conveyor belt for transportation of concrete from mixer to concrete block making machine to
maintain quality of wet cement.
28.2.3 The factory should have well designed curing area to ensure adequate curing of paver blocks.
28.2.4 Laboratory (Desirable but not essential) :
The testing equipment should have required in the Laboratory as per the following:
A Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
Systematic record of test results of various paver blocks manufactured in the factory.
Concrete Mix Design for various grade of concrete used for making of paver blocks.
28.3 Specifications For Coloured Paver Blocks:
Coloured concrete paver blocks shall be manufactured as per attached specifications using or
equivalent approved colour Pigment of “BAYER” Make “BAYFERROX IRONOXIDE PIGMENTS”
with minimum colour pigment of 3% by weight of cement. The colour shade shall be “RED” as
selected by AMC before commencement of the work. White cement shall be used for colored
pavers to obtain the desired colour shade. The job also includes providing 50 mm thick sand
bedding to match the shade of the paver block.
The colour of the paver block shall be guaranteed against fading of colour for period of
months from the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of coloured pavers
will be as per attachment.
28.4 Pavers Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same
should be retained until the laying. The surface should be reasonably smooth and of anti skid
and anti glare type. The paver should have uniform chamfers to facilitate easy drainage surface
run off. The pavers should have uniform interlocking space of 2mm to 3mm to ensure
compacted sand filling after vibration on the paver Surface. The concrete mix design should be
followed for each batch of materials separately and automatic batching plant is to be used to
achieve uniformity in strength and quality. The pavers shall be manufactured in single layer
only. Skilled labour should be employed for laying blocks to ensure line and level of laying,
desired shape of the surface and adequate compaction of the sand in the joints. The pavers shall
be of cement gray colour without any pigment & for coloured pavers refer “specifications for
coloured pave`” The pavers are to be skirted all round with kerbing using solid concrete blocks of
size 150mm X 250mm X 380mm. The kerbing should be embedded for 100mm depth. The
concrete used for kerbing shall be cured properly for 7 days minimum.
28.5 Paver Block Dimensions:
Thickness 60 mm
Shape Unipaver, I shape or directed by Addl.C.E.
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey colour without use of any
For coloured pavers refer “specifications for coloured
Dimensional (+/-) 2mm for length & width,
Tolerance (+/-) 3mm for Height (Thickness)
28.6 Testing of Paver Blocks :
* TEST Average Values Frequency
1. Compressive Min. 35 N/Sq mm for 250 Smt / 1 Test
Strength 60mm thick
Minimum 4.5 N/Sq
2. Flexural Strength
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
* Sampling and testing procedure as per enclosed specifications
28.7 Sampling and Testing Procedure for Paver Blocks
INTERNAL – Average of minimum 3 samples per 5000 Blocks.
28.7.1 Sampling for Testing
Sampling of Paver blocks.
Method of sampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks,
shall be divided into ten approximately equal groups. Three blocks shall be drawn from each
Marking and identification :
All samples shall be clearly marked at the time of sampling in such a way that the designated
section of part thereof, and the consignment represented by the sample, are clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid
damage to the paving in transit. Protect the paving from damage and contamination until they
have been tested. The testing shall be carried as soon as possible, after the sample has been
taken. As soon as practicable after sampling. The samples shall be stored in water at 20 degree C
5 degree C for 24 hours prior to testing.
The item is to be executed as per instructions and to the entire satisfaction of Engineer-in-
Charge and/or his authorized representative using Rubber mould and Table vibrator for Kerb
instead of mechanical press system.
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt
carpet, metal, soling etc. complete with stacking the materials as directed. The road surface of
asphalt shall carefully be opened to full width as directed by the Engineer-in-Charge and/or his
authorized representative.
Excavation area shall be properly identified and marked in rectangular shape. The road crust
shall be opened up to entire depth i.e. including soling. All the materials shall be separately
deposited in such a way and in places as may be determined by the Engineer-in-Charge and/or
his authorized representative. In case rubble not being so deposited or being mixed up with the
excavated materials will not be allowed for refilling. The cost of materials shall be charged from
the contractor. The decision of the C.E. shall be final and binding to the contract
For detailed specification for Laying of Paver Block on sand bedding, refer R & B Department
booklet for General Technical Specification for building works.
The rate shall be for a unit of SMT
Providing and laying of interlocking grey paver blocks of high density 80mm thick made from M-40
grade concrete using 6 mm to 20 mm machine crushed well graded stone aggregate, sand of
approved quality, OPC 53 grade cement with contractor's own concrete mix design as approved by
AMC, for parking, road. Cost Includes formwork, using rubber/FRP mould, laying paver block as per
required grading and specification laid paver block shall be mechanically compacted. The work of the
paving blocks shall be executed in line and level by skilled mason of flooring work only. It should be
laid in such a way that the no cutting of the paver block to be necessary. Cutting of paver block by
machine cut only and carting to be done. The Finished surface of the Paver Block shall have
reasonably good plain finish. Paver blocks shall be compacted and shall be re-laid if necessary. Gravel
or such type of materials shall not be allowed for production. Laying on 5 Cms thick sand
bedding.(AMC approved Rate )
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or his
authorized representative.
The mode of payment for this item shall be on RMT. Basis.
Providing and laying shot blasted Non - interlocking, Paver blocks of specified thickness, size, grade of
concrete and colour machine made and blasting by automatic shot blasting machine and high density
of as per approved sample of approved make for footpath, parking areas, service lanes,cross over and
other areas as mentioned in the drawing. Including providing and laying 50 mm thick averave bedding
layer of coarse sand below paver block as per required grading and specification. Laid paver block
shall be mechanically compacted. The work of the paving blocks shall be executed in line and level by
skilled mason of flooring work only. Small size of paver block with same specification shall be used at
residue or at end. It should be laid in such a way that the no cutting of the paver block to be
necessary. If cutting of paver block shall be required , than cut by machine only and laying to be done
by skilled flooring mason. The finished surface of the paver block shall have coarse sand Texture
Finish. Pave blocks shall be compacted and shall be re-laid if necessary. Actual laid area shall be
measured and paid without any wastage. (A) 60 mm thick M-35 grade Grey Paver block of size
Specification as per Item No.
Providing and laying shot blasted Non - interlocking, Paver blocks of specified thickness, size, grade of
concrete and colour machine made and blasting by automatic shot blasting machine and high density
of as per approved sample of approved make for footpath, parking areas, service lanes,cross over and
other areas as mentioned in the drawing. Including providing and laying 50 mm thick averave bedding
layer of coarse sand below paver block as per required grading and specification. Laid paver block
shall be mechanically compacted. The work of the paving blocks shall be executed in line and level by
skilled mason of flooring work only. Small size of paver block with same specification shall be used at
residue or at end. It should be laid in such a way that the no cutting of the paver block to be
necessary. If cutting of paver block shall be required , than cut by machine only and laying to be done
by skilled flooring mason. The finished surface of the paver block shall have coarse sand Texture
Finish. Pave blocks shall be compacted and shall be re-laid if necessary. Actual laid area shall be
measured and paid without any wastage. (A) 80 mm thick M-35 grade Grey Paver block of size
1.0 The scope of work: It includes supplying and laying of Precast shot blasted by automatic shot
blasting machine in factory (not on site) paver blocks at footpath, parking area, service lane and other
The work includes:
1.1 Paver block should be laid over prepared sub grade.
1.2 Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks.
1.3 Manufacturing of paver blocks by one of the approved suppliers as per requirements intechnical
specification enclosed.
1.4 Supplying of paver blocks at site, including handling at both ends. The type of paver block may be
interlocking or non-interlocking.
1.5 Providing and laying average 50 mm coarse sand bedding for laying blocks.
1.6 Laying of paver blocks at site as per requirement in technical specification, within shortest possible
1.7 Testing of paver blocks through reputed Govt. /Non Govt. Test house and submission of test results
as per requirements in Technical Specifications. Client reserves the right to carryout test at random.
Cost for such tests to be borne by contractor.
1.8 The contractor shall guarantee that all material and components designed, fabricated, supplied and
laid by him shall be free from any type of defect due to faulty material and/or workmanship/erection
for a period of five year from the date of completion of work at individual sites. However, the
contractor for five years shall render free maintenance.
2.0 Technical Specifications:
2.1 Paver Block Manufacturing Facilities:
The Paver Block shall be made in factory with following minimum facilities:
Concrete Block making Machines:
The machine should be capable of producing high quality Paver Blocks by obtaining high level of
compaction by application of hydraulic compaction and also by high intensity vibration to the moulds.
The machine should have automatic control panel for uniformity in strength.
Concrete Batching & Mixing Plant: (Not essential) The concrete Mix Design should be followed for each
batch of materials. The concrete ingredient should be mixed in concrete Batching & Mixing plant with
minimum capacity of 30 cum/hour. The plant should be equipped with automatic control panel for
maintaining water cement ratio from batch to batch to obtain concrete of uniform quality and strength.
The plant should be equipped with adequate mechanism for mechanized loading of raw materials into
mixer and conveyor belt for transportation of concrete from mixer to concrete block making machine
to maintain quality of wet cement.
The factory should have well designed curing area to ensure adequate curing of paver blocks. Steam
curing facility of the paver blocks is preferable.
Laboratory (Desirable but not essential) :
The factory should have the following:
Compression testing machine of adequate capacity.
Other tools and equipment for testing raw materials and paver blocks.
(1) Systematic record of test results of various paver blocks manufactured in the factory.
(2) Concrete Mix Design for various grade of concrete used for making of paver blocks.
2.2 Specifications for Coloured Paver Blocks:
Colour concrete paver blocks shall be manufactured as per attached specifications using approved
colour Pigment of iron oxide of approved brand like Bayer, Tata etc. with minimum colour pigment of
3% by weight of cement. The colour shade shall be as selected by Architect before commencement of
the work. The job also includes providing 50 mm thick sand bedding to match the shade of the paver
The colour of the paver block shall be guaranteed against fading of colour for period of 12 months from
the date of laying of the same at site.
All other technical specifications & Procedure for testing, laying & sampling of Color pavers will be as
per attachment.
2.3 Paver Block Characteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should
be retained until the laying.
The surface should be reasonably smooth and of anti skid and anti glare type. The paver should have
uniform chamfers to facilitate easy drainage surface run off.
The pavers should have uniform interlocking space of 2mm to 3mm to ensure compacted sand filling
after vibration on the paver Surface.
The concrete mix design should be followed for each batch of materials separately and automatic
batching plant is to be used to achieve uniformity in strength and quality.
The pavers shall be manufactured in Double layer only.
Skilled labour should be employed for laying blocks to ensure line and level of laying, desired shape of
the surface and adequate compaction of the sand in the joints.
2.4 Paver Block Dimensions:
Layers Double layered, top layer minimum 8 to 10 mm
Shape Irregular (Uniform Shape with no Hollow Or Cracks) / as per drawing
Chamfer 4mm to 6mm along top edges
Colour Natural cement grey Colour without use of any pigment.
For Colour pavers refer “specifications for Colour pavers”
Dimensional (+/-) 2mm for length & width,
Tolerance (+/-) 3mm for Height (Thickness)
2.5 Testing of Paver Blocks:
* Sampling and testing procedure as per enclosed specifications
3.0 Sampling & Testing Procedures for Paver Blocks:
3.1 Sample Size:
INTERNAL – Average of minimum 3 samples per 10000 Blocks for compressive strength and water
EXTERNAL – Minimum 2 Blocks per 10000 blocks for abrasion and flexure.
3.2 Sampling For Testing: Sampling for testing of paver blocks shall be done in accordance with
Compressive Strength: Testing for compressive strength shall be undertaken in accordance with
Appendix-B. The average compressive strength of the blocks tested shall be 30/40 N/Sq.mm as per
Abrasion Resistance: Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement
Concrete Floor Tiles).
Flexural Strength: Testing for flexural shall be in accordance with IS 1237 (Specifications for Cement
Concrete Floor Tiles).
Water Absorption: Testing for water absorption shall be in accordance with IS 2185:1979: Part I
(Specifications for Concrete Masonry Units).
Method of sampling: Before laying paver blocks, each designated section comprising not more than
10000 blocks, shall be divided into five approximately equal groups. One block shall be drawn from each
group i.e. 3 for internal testing and 2 for external testing.
Marking and identification: All samples shall be clearly marked at the time of sampling in such a way
that the designated sections of part thereof, and the consignment represented by the sample, are
clearly defined.The sample shall be dispatched to the approved test laboratory taking precaution to
avoid damage to the paving in transit. Protect the paving from damage and contamination until they
have been tested. The testing shall be carried as soon as possible, after the sample has been taken. As
soon as practicable after sampling. The samples shall be stored in water at 20 degree oC for 24 hours
prior to testing.
SR.NO. * TEST SPECIFICATION Average Values
(Average of Minimum Five Samples/Site)
1. Compressive Strength Min. 30 N/Sq.mm for 60mm thick and Min. 40 N/Sq.mm
2. Flexural Strength Minimum 3.80 N/Sq.mm and 4.5 N/ Sq. mm for 60 and
mm thick paver block respectively.
3. Abrasion Resistance Maximum
4. Water Absorption Maximum 5.80%
5. Minimum Cement Content 380 Kg/Cum for M 30 concrete and 430 Kg/Cum for M 40 concrete
3.0 Sampling & Testing Procedures for Paver Blocks:
3.1 Sample Size:
INTERNAL – Average of minimum 3 samples per 10000 Blocks for compressive strength and water
EXTERNAL – Minimum 2 Blocks per 10000 blocks for abrasion and flexure.
3.2 Sampling For Testing: Sampling for testing of paver blocks shall be done in accordance with
Compressive Strength: Testing for compressive strength shall be undertaken in accordance with
Appendix-B. The average compressive strength of the blocks tested shall be 30/40 N/Sq.mm as per
Abrasion Resistance: Testing for abrasion shall be in accordance with IS 1237 (Specifications for Cement
Concrete Floor Tiles).
Flexural Strength: Testing for flexural shall be in accordance with IS 1237 (Specifications for Cement
Concrete Floor Tiles).
Water Absorption: Testing for water absorption shall be in accordance with IS 2185:1979: Part I
(Specifications for Concrete Masonry Units).
Method of sampling: Before laying paver blocks, each designated section comprising not more than
10000 blocks, shall be divided into five approximately equal groups. One block shall be drawn from each
group i.e. 3 for internal testing and 2 for external testing.
Marking and identification: All samples shall be clearly marked at the time of sampling in such a way
that the designated sections of part thereof, and the consignment represented by the sample, are
clearly defined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to
the paving in transit. Protect the paving from damage and contamination until they have been tested.
The testing shall be carried as soon as possible, after the sample has been taken. As soon as practicable
after sampling. The samples shall be stored in water at 20 degree C 5 degree C for 24 hours prior to
Test For Compressive Strength:
Testing Machine: The testing machine shall be of suitable capacity for the test and capable of applying
the load of the rate specified. It shall comply, as regards repeatability and accuracy, with the
requirements of clause 2.1 of BS: 1881-Part
Procedure: The sample specimen shall be tested in a wet condition after being stored for at least
hours in water maintained at a temperature of 20 oC + or – 5 oC. Before thespecimens are submerged in
water, the necessary area shall be determined.
The plates for testing machines shall be wiped clean and any loose grit or other material removed from
the contact faces of the specimen. Plywood, nominally 4 mm thick shall be used as packing between the
upper and lower faces of the specimen and the machine plates and these boards shall be larger than
the specimen by the margin of at least 5 mm
at all points. Fresh Packing shall be used for every specimen tested.
The specimen shall be placed in the machine with the wearing surface in the horizontal plane and in
such a way that the axes of the specimen are aligned with those of the machine plates.
The load shall be applied without shock and increased continuously at the rate of approximately 15 N/
Sq.mm per minute until no greater load can be sustained. The maximum load applied to the specimen
shall be recorded.
Calculation of corrected strength for individual Blocks: The compressive strength of each block
specimen shall be calculated by dividing the maximum load by full cross section area of the block and
multiplying with an appropriate factor of:-
a) For 100 mm thick blocks –
b) For 80 mm thick blocks –
c) For 60 mm thick blocks –
Compressive Strength Calculation: The average corrected compressive strength for the designed block
section shall be calculated.
4.0 Method of laying:
Blocks shall be placed on the sand bedding etc. which were well rammed so as to act as firm bed. Blocks
shall be laid in such manner that no gap shall be left in between. Blocks so laid shall be compacted by
means of mechanical compactor or equivalent compacting method so as to obtain required finished
surface. All the joints shall be matched and if any manufacturing defect is detected the lot shall be
replaced and relaying shall be done with out any extra cost up to satisfaction of Engineer in charge.
50 to 80mm thick coarse sand shall be laid as cushioning layer for arranging the paver blocks. Joints of
the paver blocks shall be filled with the sand.
The paver blocks shall be laid properly on the prepared sub-base as per manufacturer's specification
and as per Architect and Engineer-in-charge's instruction.
Paver block shall be laid by the approved agency only. If manufacturer of the paver block providing the
laying services, then it shall be laid through the supplying agency only. The labourers for paver block
fixing shall be skilled flooring mason only. Only cutting tool shall be used for cutting the paver block. Full
depth cutting toll shall be used for proper finished surface after cutting. Manual cutting or breaking of
the paver block is not permitted.
After laying of the paver block fine sand shall be spread over it and paver block shall be compacted with
mechanical compactor. Any settlement or undulation in the laid area shall be repaired immediately.
5.0 Mode of Measurement and payment:
Measurement shall be done as per actual area laid without considering any wastage.
The Measurement of the item shall be in Sqmt basis.
Labour work of fixing kurb any design of central verge, (both side) footpath kurb, items includes
necessary excavation, asphalt cutting of any thickness, erecting in line and position and pointing with
cement mortar (1:3), watering, etc complete, filling with zari along the side of the kurb, the kurb
stone fix prepared with bitumnious top surface, as directed by engineer in charge.
Work shall be carried out as per item description including cost of all labour and materials etc. complete
as directed. General standard practice of laying of paver blockis applicable.
The measurements shall be on RMT basis.
Paver Block Providing and laying, Dished Channel specified thickness, size, grade of concrete and
colour machine made and blasting by automatic shot blasting machine and high density of as per
approved sample of approved make for suite drain besides paking area and other areas as mentioned
in the drawing. Including providing and laying 50 mm thick average bedding layer of coarse sand
below dished channel as per required grading and specification. Laid dished channel shall be
mechanically compacted. The work of the dished channel shall be executed in line and level by skilled
mason. Small size of dished channel with same specification shall be used at residue or at end. If
cutting of dished channel shall be required , than cut by machine only and laying to be done by skilled
flooring mason. Actual laid area shall be measured and paid without any wastage. (A) 600 mm X
mm X 100 mm thick M-25 grade Grey dished curved channel
As per item decription or as decided by engineer in charge.
The Measurement of the item shall be in rmt.
Supply and installation of concrete bollard of size 300mm diameter x 900mm height, constructed
using M-30 concrete and 4nos 8mm dia MS Fe500 reinforcement through the section as directed by
EIC including supply of all material, labour and equipment upto any lead and lift
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge, M.O.R.T
& H. latest Specifiaction& IS CODE and/or his authorized representative. refer R & B Department
booklet for General Technical Specification for building works.
The mode of payment for this item shall be on No. Basis.
Construction of RCC nosing in central verge using M-200 grade cement concrete. The item includes
cost of centering & shuttering, reinforcement, both side cement plaster in C:M 1:3 mortar & curing
etc. complete. Half round portion of the nosing shall be made by using mild steel.
Work shall be carried out as per item description including cost of all labour and materials etc. complete
as directed. General standard practice of work is applicable.
As per Item and instructed by engineer incharge
The rate shall be for a unit of Nos
Providing, supplying and fixing precast C.C. blocks (M-20) edge kerb having size of 75 x 300 x 300 mm
depth and as per design conveying it to the site, jointing into C:M 1:3 and racking out the joints incl.
necessary excavation of asphalt, soil etc..completed.
The specifiction of following materials shall be conforming with specification mentioned for relavent
material / items in General technical specification for building work of R&B Department of Gujarat.
Water shall conform to M-1Cement to M-2
Sand to M-5Grit to M-7.
Graded stone aggregate 20 mm. nominal size to M-10
Contractor shall have to manufacture the blocks as per the dimensions given in the drawing. Specific
machineries shall be used to manufacture the precast blocks. These machineries should be
compatible to produce blocks of required strength and dimensions. The machine shall contain
hydraulic Press or advanced equipment to generate required compaction & Grade and finish.
Moulds/ Steel Plates/ Dies of the machine shall be dimensionally checked & to be got approved
before commencing the production. Contractor shall prepare proper Drying Yard for keeping the
blocks before curing. The drying yard shall be levelled and covered so that no shrinkage cracks are
formed. Contractor shall prepare adequate size curing pond to cure the blocks for not less than
Days. No other means of curing shall be allowed. The technical specification of concrete shall confirm
2000. The concrete mix is not required to be designed and only nominal mix as per IS: 456-2000 shall
be followed. The proportion of the concrete mix shall be 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded
stone aggregate 20 mm. nominal size) by volume. Concrete work shall have fairly exposed concrete
surface or as specified in the item. The designation ordinary M-10, M-15, M-20, M-25 specified as per
I.S. corresponds approximately to 1:3:6, 1:2:4, 1:1.5:3 and 1:1:2 nominal mix of ordinary concrete, by
volume respectively. The ingredients required for ordinary concrete containing one bag of cement of
50 Kg. by weight (0.0342 m3.) for different proportions of mix shall be as per IS 456-2000. The
proportion of the aggregate for the kerb stone shall be modified as per the approval of the engineer-
in-charge. The water cement ratios shall not be more than those specified as per IS. The cement of
the mix shall be increased, if the quantity of water in a mix has to be increased to overcome the
difficulties of placement and compaction so that the water cement ratio specified in the table is not
exceeded. The maximum size of coarse aggregate shall be as large as possible within the limits
specified but in no case greater than 1/4th of the minimum thickness of the member, provided that
the concrete can be placed without difficulty so as to surround all reinforcement thoroughly and to
fill the corners of the form. For reinforced concrete work, coarse aggregates having a nominal size of
20 mm. are generally considered satisfactory. Admixture shall be used in concrete only with approval
of the Engineer-in-charge based upon the evidence that with the passage of time, neither the
compressive strength of concrete is reduced nor are other requisite qualities of concrete impaired by
the use of such admixtures.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of
50 kg weight. The volume of one such bag can be taken as 0.0342 m3. Boxes of suitable sizes shall be
used for measuring sand and aggregate. The size of the boxes (internal) shall be 30cm. x 30 cm. and
38 cm. deep. While measuring the aggregate and sand, the box shall be filled without shaking
ramming or hammering. The proportioning of sand shall be on the basis of its dry volume and in case
of damp sand; allowances for bulk age shall be made.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall
be kept in first class working condition and maintained throughout the construction. Measured
quantity of aggregate, sand, and cement required for each batch shall be poured into the drum of the
mechanical mixer while it is continuously running. After about half a minute of dry- mixing, measured
quantity of water required for each batch of concrete mix shall be added gradually and mixing
continued for another one and a half minute. Mixing shall be continued till materials are uniformly
distributed and uniform colour of the entire mass is obtained and each individual particle of the
coarse aggregate shows complete coating of mortar containing its proportionate amount of cement.
In no case shall the mixing be done for less than 2 minutes after all ingredients have been put into the
mixer. Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned
before putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge, the first batch
of concrete from the mixture shall contain only 2/3rds of normal quantity of coarse aggregate. Mixing
plant shall be thoroughly cleaned before changing from one type of cement to another.
The degree of consistency which shall depend upon the nature of the work and methods of vibration
of concrete shall be determined by regular slump tests in accordance with IS: 1199-1959. The slump
of 10 mm. to 25 mm. shall be adopted when vibrators are used.
All Moulds shall be cleaned and made free from standing water, dust, snow, or ice immediately
before placing of concrete. Formwork/Metal Mould for exposed concrete surface (If indicated):
All the moulds shall be checked for exact dimensions of the precast blocks. All the edges of the
precast blocks shall confirm the
profile of the final drawing & edges/ curvatures of the moulds shall be checked accordingly. Moulds
shall be regularly checked for correctness of dimensions of Blocks, twists, bends due to handling, etc.
Before starting every days work.
Care shall be taken to set all form work/Mould in perfect line, level (or in required camber or slope as
specified) and plumb. Form work/Mould propping shall be strong, rigid, and sturdy. The form
work/Mould shall be as per pattern & design shown in drawings. Form work/Mould shall be done
accurately and precisely so as to achieve neat, clean and smooth concrete surface, in line, level and
plumb. Clinks, twists, offsets, warps, riveting etc. in plates or forms shall not be allowed. Before
placing concrete, forms shall be thoroughly cleaned off of all rust, dust, and loose materials.
Colourless oil or grease of approved quality shall be applied before placing steel. Also the form
work material will be of wood/plywood/steel or any sort of such material, as
approved by the Engineer-in-Charge and/or his authorized representative; so that all exposed
concrete surfaces have uniform colour.
For all kind of exposed concrete work only one brand (to be approved by the Engineer-in charge) of
cement shall be used.
Removal of Moulds:
Specific time shall be identified for removal of moulds, such that the concrete of the precast blocks
shall gain strength to withstand the stresses generated due to self weight and handling to drying
yards without any deformation to shape/ dimensions/ edges.
Sufficient time shall be given to the block after it is removed from the mould so that it can gain
strength and dry in shade to prevent any cracks due to shrinkage. This shall be done in drying yards.
Curing of block shall be done only in curing pond and curing shall be done for minimum 14 days.
Drying period after removing from pond & before delivery to site: Water should be drained of from
the block before it is actually sent to the site. Time should be provided for proper draining of water
which may be present in the block kept for curing in the pond.
Precaution shall be taken while transporting of the blocks to site.
The blocks should be loaded and unloaded with due care so as to avoid generation of stresses
leading to breaking of block. Care should be taken to prevent the block from breaking during
The pits of the size 150mm in width and required depth shall first be excavated, true to line and level.
The relevant specifications of item A- 1 shall be followed for excavation work. The pits shall be filled
with a layer of 50mm. thick sand bedding. The curbs then shall be placed in position of which 50mm.
shall be below road. Care should be taken to maintain proper line and level. The joints between the
kerbs shall be pointed with C.M. 1:2 and cured for minimum seven days.
Sampling and testing of concrete:
Samples from fresh concrete shall be taken as per IS : 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with IS : 516-1959. A random sampling
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of
being tested i.e. the sampling should be spread over the entire period of concreting and cover all
At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each sample,
5 for testing at 7 days, and the remaining 5 at 28 days. The samples of concrete shall be taken on
each day of the concreting as per above frequency. The number of specimens may be suitably
increased as deemed necessary by the Engineer-in-charge when procedure of tests given above
reveals a poor quality of concrete and in other special cases. The average strength of the group of
cubes cast for each day shall not be less than the specified cube strength of 200 Kg/cm2 at 28 days.
20% of the cubes cast for each day may have value less than the specified strength provided the
lowest value is not less than 85% of the specified strength. If the concrete made in accordance with
the proportions given for a particular grade, does not yield the specified strength, such concrete shall
be classified as belonging to the appropriate lower grade. Concrete made in accordance with the
proportions given for a particular grade shall not, however, be placed in a higher grade on the ground
that the test strength are higher than the minimum specified. If rock pockets/honeycombs in the
opinion of Engineer-in-charge are of such an extent or character so as to affect the strength of the
structure, materially or to endanger the life of the steel reinforcement, he may declare the concrete
defective and require the removal and replacement of the portion of the structure affected.
Precast Kerb Stones:
The relevant specifications of concreting as per item above shall be followed except that work shall
be carried out for precast concrete kerb stones as specified in the item. All Precast members shall be
cast at workshop. Sufficient curing shall be done before placement of the same the method of
transporting and placing the precast members shall be as approved by the Engineer-in-charge.
Members shall be so transported that no breakage or undue stresses are induced in them. If
required, all members shall have a key provided on both the faces i.e top and bottom surfaces, of
adequate size so as to fill the same with concrete while laying. The function of this key is to avoid the
leakage through the joint between the precast member and the member on which it is laid.
Mode of Measurements and Payment :
The rate shall include cost of formwork and cost of reinforcement. The volume occupied by
reinforcement shall not be deducted from R.C.C. work.
The rate shall be for a unit of Rmt.
Supplying & Fixing Nimbhada ladi 37 to 50 mm thick for walk way covering the activity of
excavation,ramming,laying on sand bedding as per requirement to fix the Nibhada stone in Line &
Level with cement pointing in cement mortar 1:2 etc complete as directed.
The mode of measurnment shall be on Smt basis.
Labour work for fixing interlocking blocks / any kind of pavement on up to 50 mm th sand bedding,
levelling, watering and fixing in line & level as well cleaning the site etc.comp. as directed.
Work shall be carried out as per item description including cost of all labour and materials etc.
complete as directed. General standard practice of laying of paver block is applicable.
The measurements shall be on SMT basis.
Bitumen Cutting Labour Charges Of Cutting in bituminous pavement.Cutting to be done with heavy
duty tandom cutting machine consist of dianond level.Minimum Cutting Depth Shall be 75 mm From
the finished Level.Cutting Shall be perfectly in line.the width and depth of the removal of asphalt
towards kerb stone shall be as per the drawing.bitumin Shall be Carefully Removed so that the
cutting edge towards the road should not be disturbed.The work of Removal of asphalt will be
considered in this item as running meter of the cutting done by machine.one cutting line will be
considered per length of the kerb stone.Bitumen and Other Debrise shall be disposed within
km.as per the instruction of the engineer in charge.Surroundings Shall be cleaned to the satisfaction
of engineer in Charge.
The measurements shall be on RMT basis.
Supplying, fabricating and placing in position reinforcement TMT bars Fe- 500, yield stress not less
than 500 N/mm2 bars confirming to IS- 1786 reinforcement for RCC structure / items as per
design including transporting steel to the work site, handling wastage, decoiling, cutting, bending,
cranking, fabricating to required shape, placing in position, binding with 18 guage (1.22 mm) GI
wires, welding if necessary by using approved welding rods etc. for all levels, all place, all height
as per drawing etc. complete as directed by the engineer-in-charge. The quoted rate should
be inclusive the cost of binding wire, chairs, pins, brackets and the same will not be measured
and paid separately. (Rolling margin's and wastage shall not be paid.) Measurement shall be made on
the length basis and convert into weight by using standard co- efficient.
SOR 23-24 IT CD NO :05014C
For relevant Specification of Item as per item description & instruction of Engineer-in-Charge and/or his
authorized representative.
Mode of measurements shall be on Kg basis.
Providing Formwork of ordinary timber planking so as to give a rough finish including centering
shuttering strutting and propping etc. Height of propping and centering below supporting floor to
ceiling not exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete
work in. (A)Foundations Footings Bases of Columns etc. and Mass concrete. (Item Code : 09001AA,
SOR 2021-22, R & B Ahmedabad City
Providing Formwork of ordinary timber planking so as to give a roughfinish including centering shuttering
strutting and propping etc. Height of propping and centering below supporting floor to ceiling not
exceeding 4 M. and removal of the same for in situ reinforced concrete and plain concrete work in.
(A)Foundations Footings Bases of Columns etc. and Mass concrete.
Mode of measurements shall be on SMT basis
P/A Tremix with dewartering machine and floater machine on constructed CC work for finishing the
surface as per requirement. The rate including all machinaries, labor, loading, unloading,
transportaion etc complete as per direction given by engineer in charge.
Providing & Applying Trimix with dewatering machine and floater machine on constructed RCC work
incl.cost of machine and labour etc comp as directed. As directed by engineer in charge
Making 15 mm. Groove in RCC work on road & filling it with polysulfied selant & finished ot good
incl. all labour charges etc. comp.as directed.
Making 15 mm groove in RCC work on road and filling it with polysulfied selant and finished it good
incl.all labour charges etc comp as directed. As directed by engineer in charge.
The mode of measurement shall be on Rmt of basis.
Providing & Supplying JCB Machine on rental basis in case of emergency situation and break down
type work & also during unavoidable condition as per instruction of engg.incharge , rate includes all
nece. shifting, fuel and operating charges and stacking of useful & non-useful materials separately up
to store. (No payment should be allowed for non working condition of machinery and for pipe line
excavation and laying work)
Item includes Providing & Supplying JCB machine for RCC/ Asphalt cutting and heavy excavation
in Case of heavy traffic Main road, rate includes all necessary shifting, fuel and operating charges and
stacking of usefull & unusefull materials separatly up to store Measurement shall be paid by Hr. basis.
Hiring of Tractor with trolley considering 8 Hrs. As working Day hours inclu. Driver (GWSSB SOR 2021-
The M/s shall be on Day basis.
Supplying, labour for excavation of all types of soil at any depth including excavation of asphalt
pavement of any thickness,demolit ion of brick work in CM of any proportion including stacking of
serviceable materials and disposal of unserviceable material etc. comp. as directed.
The M/s shall be on No basis.
Providing and suppplying Roller for compacting the road bhuva with available building waste and
Road waste material as and where directed by engineer in charge.
The measurement shall be in Shift.
Rent for Providing Chota Hathi (Light weight vehicle) with Driver at shown site incl. necessary
oil/diesel/petrol for vehical and all other charges.Work Done as per Instruction of incharge etc.
Complete as Directed.
The measurement shall be in Shift.
Contractor’s Signature Add.City Engineer
13. કો ાકટર ારા ESIC અને EPFO ર શન ગેના અ. .ુ કોપ . નાણાં ખાતા સર લ
ુ ર નં- ૨૭, તા ૦૭/૦૧/૨૦૨૬ ુ બ ESIC અને EPFO
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
FOR BANK GUARANTEE
Seal and Signature of the Bidder Add. City Engineer (South Zone)
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
General terms & conditions
1. A booklet of FORM B-1 of Gujarat State Roads & Building Department / Water Resources
Department with the latest correction slips may be referred for quality of construction &
standard of Procedure (SOP). (only English version)
2. In the specification “as directed" / "approved" shall be taken to mean "as directed /
"approved" by the Engineering in charge.
3. Wherever a reference to any Indian standard appears in the specifications, it shall be taken
to mean as reference to the latest edition of the same of force on the date of agreement.
4. In "Mode of measurement" in the specifications wherever a dispute arises in the absence of
specific mention for a particulars point / aspect, the same in the relevant Indian Standards
shall be referred to.
5. All measurement and computations, unless otherwise specified shall be carried out nearest
to the following limits :-
i) Length, width and depth, Height 0.01 Meter
ii) Areas 0.01 Sq.mts.
iii) Cubic contents 0.01 Cu. mts.
In recording dimensions of work, the sequence of length, width and height (Depth) or
thickness shall be followed.
6. Definite particulars covered in the items of work, though not mentioned or elucidate in its
specifications shall be deemed to be included therein.
7. Approval of the samples of various materials given by the Engineer in charge or AMC's
Consultant shall not absolve the contractor from the responsibility of replacing defective
materials brought on site or materials used in the work found defective at a later date. The
contractor shall have no claim to any payment or compensation whatsoever on account of
any such materials being rejected by the Engineer in charge.
8. The contractor’s rate for the item of work shall be for the work completed in all respect.
9. All materials including those of electrical shall be got approved by the Engineer in charge/
Architect before using them in the work.
10. Materials as and when rejected by the Engineer in charge or AMC's Consultant shall be
removed from the site of work within 24 hours.
11. All work shall be carried out in a manner applying the best technique.
12. All tools, templates, machinery and equipment for correct execution of the work as well as
for checking lines, levels, alignment of the works & all precautionary measures during
execution shall have to be kept in sufficient numbers and in good working condition at the
site of the work.
13. Special modes of the construction not adopted in general Engineering practice, if proposed
to be adopted by the contractor shall be considered only if the contractor provided
satisfactory evidence that such special mode of construction and completion of work to the
required strength and quality. Acceptance of the same by the Engineer in charge shall not
however, absolve the contractor from the responsibility of any adverse effect and
concordance of adopting the same in the course of exaction or completion of the work.
14. The contractor shall be responsible for observing the rules and regulation imposed under
the "Minor Mineral Act", and such other laws and rules prescribed by the Government
from time to time.
15. All necessary safety measures and precautions (incl. those laid down in the various relevant
Indian Standard) shall be taken to engrave the safety of men, materials and machinery on
the work and also of the work itself.
16. Quantity measured in the tender is approximate. It may increase or decrease looking to the
quantum of actual work for which no any claim shall be entertained by A.M.C.
17. Contractor shall have to execute extra item if required only after necessary permission from
18. The work in general shall be carried out as per standard specifications of the relevant items
to be executed & as per the instruction of Engineer in charge & as per the guidance of
AMC's Consultant for this project.
19. The general terms & conditions of the contract shall be applicable & shall be binding on
the contractor. The contract agreement shall have to be executed between AMC & the
agency to which work is awarded for execution.
20. The time limit shall be reckoned after next day from the date of issue of the written work
order to the contractor after fullfillng the formality life SD & Agreement. No time
extension will be granted under any circumstances.
21. In case of any ambiguity in specifications mentioned in this tender, the interpretation given
by Additional City Engineer /Dy.M.C of A.M.C. will be final and binding to the
22. The contractor shall take no advantage of any apparent error or omission in drawing or
specification and the Engineer -in-charge shall make such corrections and interpretations as
necessary to fulfill the intent of the plants and specifications.
23. The quantities of items in BOQ (Bill of Quantities) may vary in case of necessity arises.
24. All prevailing taxes/duties chargeable by State Govt./Central Govt. and the Municipal
Corporation. will be payable by the contractor.
25. No any kind of price rise / price escalation / price variation for cement , steel or labour
26. Contractor is requested to see the site physically before tendering. He is also requested to
quote the rates keeping in view of all the points mentioned in relevant pages of tender
27. Water Supply: The contractor shall arrange at his own cost, a suitable supply of piped
water for the construction of the works and provide a satisfactory supply of potable water
for drinking, washing, sanitation and cleaning down. The contractor will be responsible for
all the costs where applicable of connection, meter installation, water consumed, water
required for testing purposes, disconnection and the laying, maintenances and ultimate
removal of any distribution system around the site.
28. Electricity: Electric supply will be made available at the site by the Contractor and the
contractor must make his own arrangements with the Corporation and Electricity Supply
Authorities and with other contractors to connect and to take a supply from such services,
paying all costs in connection therewith.
The Contractor shall be entitled to use supply Electricity as may be available on the site for
purpose of the work and shall pay such charges as is fixed by the appropriate supply
In case there is any delay in supply of power site of any interruption or fault in the power
during the work. No compensation shall be paid for idle labor staff, machineries and for
use of diesel operating sets etc. as the case may be.
29. Tenders shall submit all the valid/certified documents in support of their initial/eligibility
criteria mentioned above along with the bid. They shall have also to submit the income tax
clearance certificate and solvency certificate.
30. No advance such as secured advance machinery advance, mobilization advance or
materials advance will be given.
31. The contractor shall get the electrical works executed through the authorized Government
approved licensed electrical person or firm in appropriate category in accordance to
contractual provisions.
32. The electrical works shall be carried out strictly in accordance with the directives issued by
Engineer in charge.
33. Contractors shall not have any dispute or claim for any kind of compensations
(i) If the quantity stipulated in the tender items varies or the scope of work changes &
thereby total amount of work increases/ decreases.
thereby total amount of work increases/ decreases.
(ii) If the work gets delayed/ postponed for some administrative/ technical decision
34. In case of any dispute, decision of Municipal Commissioner shall be final and binding on
the contractors.
35. Tenders which do not fulfill all or any of conditions or are submitted incomplete in any
respect will be rejected. Municipal Commissioner reserves the right to increase/decrease
the scope of work. No any claim to that effect shall be entertained. The Municipal
Commissioner also reserves the right to reject any or all the tenders without assigning any
reason thereof.
36. The contractors are requested to quote their rates considering above tender conditions.
37. The contractor shall have to paid balance Security Deposit within 15 days from the date if
issue of Letter of Interest (LOI). And after paying the balance S.D. the time limit will be
started & Execution of Agreement to be done than after.
In case of delay in paying balance S.D. by more than 15 days penalty at the rate of
0.01% of sanction tender amount per day will be deducted from the Bill.
Eventhough in special case, If work is not started because of monsoon or any other
special reason (like site is not available), after evaluation of situation the actual date of
starting of work will be consider after approval of Dy.M.C. (South zone)
38. The Contractor shall not claim for increase or decrease in the quantity of the item or the
39. The payment shall be made as per the A.M.C policy for the work done by the contractor.
40. Conditional tenderes will not be accepted.
41. The Contractor must be followed the rules and regulations for COVID-19 as per guidelines
published by WHO/ Center government/State government /Ahmadabad municipal
Signature of contractor with seal Additional City Engineer (S.Z)
Date Ahmedabad Municipal Corporation
QUALIFICATION INFORMATION
1. The information to be filled in by the Bidder in these statements & supporting documents submitted
in physical form will be used for the purpose of pre qualification.
2. All statements given here under shall be submitted by bidders on their original letter pads only with
stamp of firm of bidder and sign of the bidder.
3. Photocopy of any statements shall not be considered as valid document.
4. Information / Details to be submitted by the Bidders in the Performa mentioned under Statement.
All the documents submitted in the support of these statements shall be duly attested and certified true
1. I/We hereby declared that I/We am/are not partner(s) blacklisted or connected with firm blacklisted
by AMC,Government of Gujarat,Ministry of Road Transport & Highways/NHAI.
2. The I / We also hereby certifies that our firm M/s ________________________________has
neither abandon any work in India nor rescinded any contract awarded to us during last five years prior to
the date of this bid.
3. At present I/We am/are registered as approved contractor (s), firms in any state, CPWD / MES /
4. We, the partners/owners of this firm, hereby give an undertaking that we are jointly and severally
responsible to meet all the liabilities ever and above the business of this firm and make good the above
financial loss sustained by the Amdavad Municipal Corporation as a result of our abandoning the works
entrusted to us.
5. I /We hereby certify that all the statements made in the required attachments are true and correct.
6. The I / We undersigned hereby authorise(s) and request(s) any bank, person, firm or corporation
to furnish pertinent information deemed necessary and requested by the Department to verify this
statement or regarding my (our) competence and general reputation.
7. I /We hereby declare that I / We understand and agree that further qualifying information may be
requested, and I / We also agree to furnish any such information at the request of the AMC within the
prescribed time.
8. I / We further declare that my / our near relatives are not working in AMC as an Addl. C.E., Dy.
C.E., A.C.E., A.E., and T.S. as on today.
(Signed by an Authorized Representative of the Firm)
Name of the Representative
1. I / We hereby declare that I / we have visited the site and fully acquainted myself / ourselves with
the local situations regarding materials, labour and other factors pertaining to the work before submitting
this tender. I/We certify that I/We have inspected the location of the proposed work before quoting my/our
2. I/We have also inspected the quarries and borrow areas and satisfied myself/ourselves regarding
the quality, quantity, availability, and transport facilities for earth, stone, bricks, and, cement etc. through
the network of available roads and path ways required for the work.
3. I / We hereby declare that I / we have carefully studied all the terms and conditions of contract,
specifications mentioned in the tender documents and I / we do agree for compliance with the same
4. I/We shall execute the contract agreement with the AMC after award of work and before start of
(Signed by an Authorized Representative of the Firm)
Name of the Representative
APPLICABILITY OF PROVIDEND FUND AND MISCELLANEOUS PROVISIONS ACT
Successful bidder i.e. the agency whose tender is accepted by the AMC shall have to comply the
necessary formalities under the employees provided fund and Miscellaneous Provisions Act, 1952 as
Contributory Provident Fund Scheme is applicable to laborers engaged in construction activity and shall
have to submit proofs regarding deduction of provident fund and other dues and depositing the same with
government department under the act and the scheme regularly on monthly basis failing which no running
/ final bill payment will be made by the AMC to the contractor in any circumstances.
A certificate to the above effect has to be given by the contractor as under.
Declaration of Depositing Provident Fund contribution
This to certify that we have deducted the employees’ P.F. and deposited the same along with
employer’s contribution towards provident fund on labour charges / wages paid by us to the laborers
with Provident Fund Authority under our Provident Fund Code No.___________
We produce herewith the copies of the challans for the provident fund deduction and contribution
deposited as mentioned above.
(Signed by an Authorized Representative of the Firm)
Name of the Representative
To be notarized by Notary
FORM OF BANK GUARANTEE
(hereinafter called the Tenderer) is desirous and preferred to tender for works in accordance with
the terms and conditions of tender for the work of
1 .Therefore. We hereby affirm that -we are guarantors on behalf of the Tenderer up to
(in figures) and we undertake to pay to Municipal Commissioner, Ahmedabad Municipal Corporation,
A'bad specified up to his first written demand, without demur without delay and without the necessity of a
previous of judicial or administrative procedures and without the necessity to prove to the Bank the
defects or short comings or debits of the contractor any sum within the limit of
2. We further agree that the Guarantee herein contemned shall remain in full force and effect during the
period that would be taken for the acceptance of tender.
However unless a demand of claim under this guarantee is made on its in writing on or before the
(Date to be specified will not he less than 180 days from the stipulated date of receiving the tender) we
shall be discharge form all liabilities under the guarantee thereafter.
3. We undertake not to revoke the guarantee during it currency except with the previous consent of the
Municipal Commissioner, Ahmedabad Municipal Corporation, A'bad in writing.
4. We lastly undertake not to revoke the guarantee for any charge in constitution of the Tenderer or of the
5. The contractors shall have to furnish income tax clearance certificate before his tender is accepted and
intimate assessment number and ward under which he is assessed.
6. Copies of certificate as regards previous experience, if any, must accompany the tender.
Signature of Contractor Add.C.E (S.Z) Dy. Municipal Commissioner (S.Z)
Date Ahmedabad Municipal Corporation
TENDER DECLARATION FORM
The Deputy Municipal Commissioner,
South Zone, Ahemedabad
Name of Works: - RCC Road construction and Paver Block Installation and other necessary work
as per requirement inside Kankaria Lake at maninagar ward south zone (ARC)
I/We the undersigned have carefully gone through and clearly understood the Tender documents
for the above work. I/We have satisfied myself/ourselves as to the location of site, examined drawings.
I/We have visited site & fully acquainted with local situations regarding materials, labours & others
factors pertaining to work before submitting tenders.
I/We do hereby offer to execute and complete the whole of the work within the time specified all
in accordance with the specification, designs, drawing and instruction in writing referred to in the said
document and with such materials as are provided for, at the respective rates which I/we have quoted in
the schedule-B or at such other rates as maybe fixed under the provisions of these conditions. In the event
of this tender being accepted I/We agree to enter into an agreement and when required and execute the
contract, according to your fom1 of agreement as or in default where of I/we bind myself/ ourselves to
forfeit the "Earnest Money Deposit."
I/We understand that if I/WE shall not enter in agreement within ten days or decided by AMC
from the date of receipt of letter of acceptance, you will forfeit the earnest money paid by me/us and take
necessary action as deemed fit.
I/We have enclosed a DEMAND DRAFT or PAY ORDER as an “Earnest Money Deposit", for the
sum as mentioned in tender notice, the full value of which is to be absolutely forfeited to the Employer If
I/We fail to commence the work specified. Otherwise the said sum shall be retained, by the Employer as
on account of such. Security) ' Deposit'.' as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other then those that may be approved in accordance
with Conditions in the aforesaid documents.
I/We understand that you are not bound to accept the lowest or any tender which you may receive.
I/We am/are bound to execute the job if the work order is issued within 120 days from the date of
opening of the tender.
I/We agree to pay the Government income-Tax, Sales-Tax (Central and State) ,Sales Tax on work,
octroi duties and other prevailing Government taxes/charges on such items on which the same are leviable
and therates quoted by me/us are inclusive of the same.
Yours faithfully
Signature of the contractor
ybœtJtœ BGþrlrmvj ftuvotuhuNl
ÆÂûtKÍtul - Esluh Ftðþ
1. mbgbgto>t ykdu yuj.ytu.ytR. ytÃgt ctœ 10 rœJm mw^ebtk sÁhe me¾gtuhexe rzvtuÍex
Che ðgth ctœ&e dKJtbtkk ytJNu. <ubs ðgth ctœ Jfo ytuzoh R~gw &gu&e mbtg bgtoœt NY
&guje dKtNu. <&t <u mt&u fhthvºt fhJtltu hnuNu. ylu <u bwsc ftb NÁ fhJtle <theF
dKJtbtk ytJNu. yuj.ytu.ytR. ytÃgt ctœ me¾gtuhexe rzvtuÍex ChJtbtkk rœl -15 fh<tk
J^w rJjkc ltk rfMmt btk <ubs Jfo ytuzoh ytvu&e ftb NY fhJtbtkk rJjkc &gu&e «r<rœl bkswh
xuLzh hfbltk 0.01 % juFu vulÕxe cej btk&e ftvJtbtk ytJNu. <ub A<tk rJrNÐ rfMmt btk
atubtmt ltk fthKu y&Jt yrlJtgo fthKtumh ftb NÁ &R Nfu <ub l ntug <u rfMmt btk
gtuøg<t aftme zu.Bgw.frb©h (œ.Ítul) le bkswhe bu¤Je ftb NÁ fhJtle <theF dKJtbtk
2. xuLzh Jujezexe 120 r>Jm Mþ^ele hnuNu.
3. xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
4. S.yum.xe. «J<obtl œh «btKu yjd&e awfJJtbtk ytJNu. xuût fu yLg ftuE vK mhfthe
fhJuht ChJtle sJtc>the ftuLx[tfxhle hnuNu.
5. htsg / fuL÷ mhfth©elt JF<tuJF<lt ftg>t Bþsc su ftuE hfble fvt< fhJtle &Nu <u
bwsc ftuLx[tfxlt cejbtk&e fvt< fhJtbtk ytJNu.
6. juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb Bþsc 1% (yuf xft) hfb
cejbtk&e ftve juJtbtk ytJNu.
7. bxehegj xuMxekdltu xuMxekdltu FhuFh &guj Fao ftuLx[tfxh©e vtmu &e Jmwj fhJtbtk
8. ftb ytv<e JF<u su <u ftuLx[tfxhLþk hSMx[uNl ægtlbtk htFelu <ule bgto>tbtk ftb ytvJtbtk
9. yt xuLzh su <u Jdolt btLg gtœe lt ftuLx[tfxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu
y.BGþ.ftuvotu.btk btLg ftuLx[tfxhtu le gtœebtk hSMxuNl fhtJJtLþk hnuNu.
10. yt Wvhtk< y.BGþ.ftuvotu. lt slhj ftuLx[ufx fLzeNl ylu xuLzhle Nh<tu ck^lf<ot hnuNu. su
BGþrl.ftuvtuohuNl Juc mtEx www.ahmedabadcity.gov.in Wvh Bþfuj Au.
11. ftuLx[tfxh lu vubuLx - hl´dcej BGþrl.ftuvotu.lt su <u atÕþ mbglt mhfGþjh Bþsc fhJtbtk
12. Nh<e xuLzh MJefthJtbtk ytJNu lrn.
13. xuLzh MJefthÔþ, h> fhÔþ, ftulu ytvÔþ ylu fgt CtJ&e ytvÔþ <u ykdu zu.BGþrl.frbNlh©eltu
rlKog ytFhe hnuNu.
14. œhuf ytExbltk MvuNeVefuNl ftuvtuohuNlltk bkswh &guj MvuNeVefuNl Bþsc <&t RLzegl
MxtLzzo ftuz ytuV «ufxem ltkk btLg ^tht ^tuhKtu Bþsc hnuNu ylu zu.mexe yuLSlegh©eltu
rlKog ytFhe hnuNu. Jtuxh´d fhJtbtk lrn ytJu fu >hhtus J^thtltu zucheÍ WvtzJtbtk lrn
ytJu <tu ftuLx[tfxhltk Fauo ylu òuFbu Jdh ltuxemu Jtuxh´d fhtJJtbtk <&t zucheÍ WvtzJtbtk
ytJNu ylu cejbtk&e hfb ftve juJtbtk ytJNu.
15. yufe JF<u yuf fh<tk Jæþ søgtytuyu ftbNY fhJtltu Jfoytuzoh b¤u <tu ftb yuf mt&u s yuf
s c<tJuj søgtyu fhJwk vzNu. yuf ftb ÃþÁ &tg vAe cesw ftb NY fheyu <uÔþk atjNu lrn.
16. atÕþ ftbu ftuEvK mrJom jtEllu LþfNtl l &tg <u he<u ftb fhÔþk vzNu, òu ftuE mrJom jtEl
lu LþfNtl &Nu <tu <ule mkÃËKo sJtcœthe (òlbtjle) ftuLx[tfxhle vtu<tle hnuNu. mtEx vh
ftb œhBgtl bswh fu sl<t lt ftuE btKmlt òlbtjlu lwfNtl &tg <ule sJtcœthe
ftuLx[tfxhle hnuNu. vtujem Vhegt> &tg <tu <ule sJtc>the vK ftuLx[tfxhle hnuNu. CuFz ^me
l vzu <ule sJtc>the vK vtujem Vhegt>btk ftuLx[tfxhle hnuNu. CuFz ^me l vzu <u btxu
mjtb<elt vdjtk (suJt fu >tuhzwk ctk^e bsqh Ftztbtk W<thJt, mtuh´d ylu Mx[x´d fhJt
rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vhegt>btk sJtct>h hnuNu
ylu BGþrl.ftuvtuohuNlltu ftuEvK MxtV ytlt btxu sJtc>th hnuNu lrn. ytxÕþk mbSlu s xuLzh
ChÔþk. Btswhtultu rJbtu vK W<thtJJtu.
17. juch yufx «btKu <ubs Bgw. frb§h©eltkk vrhvºt lkch 81 <t.26.02.2015 bwsc <btb
juch / bsqhtulwk dwsht< rcÕzekd yuLz y^h fLMx[[fNl Jfombtkk VhSgt< hSMx[uNl fhtJJt
ykdu ybj fhJtltu hnuNu <&t fuxjt juch jtJNtu <u vK sKtJJtLþk hnuNu. juch yufx «btKu
ftgoJtne lrn &E ntug <tu <u btxu ftuLx[tfxh mkÃËKovKu sJtc>th hnuNu. ylu <ulu vubuLx
ytvJtbtk ytJNu lrn <ubs ct¤ bswhtulu ftb Wvh htFe NftNu lrn. <ubs JF<tu JF<
Bgw. frBNlh©e îtht fhJtbtkk ytJuj mh¾gwjhtule Nh<tu ftuLx[[tfxhlu ckk^l f<to hnuNu.
18. ftuEvK ftgœtfeg jexeduNl ybœtJtœ Nnuhle ftuxobtk hnuNu.
19. ftuE fthKmh òu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu ftuLx[tfxh ftuEvK «fthltu
LþfNtle- J¤<hltu n¬ >tJtu fhe NfNu lrn fu ftg>tfeg ftgoJtne yt ykdu &E NfNu lrn.
xuLzh bkswh >ltu y&o ftb ytve s >uJtLþk Au <uJtu &E NfNu lrn.
20. ytuVh y&Jt xuLzhbtk œNtoJuj ytRxbltu sÚ&tu mkCrJ< sÚ&tu Au subt atjw ftb œhBgtl
VuhVth &Jtle N¾g<t hnuje Au.
21. M&¤ vrhÂM&r< / sYhegt< Bþsc ftb fhtJ<t xuLzhbtk sKtJuj fJtuLxexebtk J^ Dx &Nu <tu <u
ykdu ftuLx[tfxh îtht ftuEvK «fthle J^thtle ltKtkfeg btkdKe fhe NfNu lrn. ylu ftb
ytuAw &tg <tu ftuLx[tfxhle J¤<hle btkdKe MJefthJtbtk ytJNu lrn.
22. mtEx vh jtJJtbtk ytJuj btjmtbtl hesufx fhJtbtk ytJu <tu ðþhk< r>l-1btk vh< jE
sJtltu hnuNu. yLg&t ftuvtuohuNl îtht <u hesufx btjltu rlftj fhe >uJtbtk ytJNu ylu <ule
LþfNtlele sJtc>the ftuLx[tfxhle hnuNu.
23. su ftuLx[tfxh vtmu bswhtultu rJbtu, ydtW&e W<htÔgtu ntug <ublu «t^tLg ytve ftb ytve
24. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt< &tg <tu <ule vtujem ftgoJtnele fu juch
yufx bwscle ftgoJtnele sJtc>the yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu
lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k btuò rJduhu
ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu
VhSgt< hnuNu. juch yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh
ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
25. bsqhtu fu htn>theytulu ftuEvK «fthltu yfMbt< &tg <tu <ule vtujem ftgoJtnele fu juch
yufx bwscle ftgoJtnele sJtc>the yb.BGþrl.ftuvtuo.lt fboatheytule ftuEvK he<u hnuNu
lrn.btºt ftuLx[tfxh s yt btxu sJtc>th hnuNu. bswhtulu dbçËx, nuÕbux nt<k btuò rJduhu
ftuLx[tfxhu VhSgt< ytvJtltk hnuNu. bswhtu <&t MþvhJtEÍ fu Bþft>bltu rJbtu vK W<thJtltu
VhSgt< hnuNu. juch yufx Bþsc ltuk^Ke fhtJe <ult rlgbtuLþk vtjl fhJt ftuLx[tfxh
ck^tguj hnNu. ct¤ bswhtu htFe NftNu lrn.
26. rcÕz´d ftble ytExbtu btxu - slhj xuflefj MvuNeVefuNl ytuV rcÕz´d Jfomle çþf Bþsc
yLþmhJtltk hnuNu. Mt>h ÃþM<eft øþsht< çþf Mxtumo 20-ce, zeMx[ef Ntuv´d, mufxh-21,
dtk^eldh&e b¤e hnuNu. su Juc mtEx www.ahmedabadcity.gov.in Wvh Bþfuj Au.
27. bxehegj fu ceò xuMx´d hevtuxo ftuLxtfxhu vtu<tlt Fauo ftuvotuhuNl sKtJu <u søgtyu fhtJJtlt
hnuNu. yt ykdultu mkÃËKo Fao <&t Bgwrl.MxtVlu juctuhuxhe Mþ^e <&t buLGþVufah´d søgt Mþ^e
jtJJt -jE sJtltu Fao vK ftuLx[tfxhu CtudJJtltu hnuNu.
28. btj su <u Mxtumo Wvh y&Jt mtEx Wvh jtuftulu lz<h l &tg <u he<u MËalt Bþsc W<thJtltu
<ubs dtuXJJtltu hnuNu.
29. òu BGþ.yuLSlegh´d MxtV sKtJu <tu ftuLx[tfxhu atÕþ ftbu mtEx Wvh zeÍexj fubuht&e ftb
atÕþ > vnujt, atÕþ ftbu <&t ftb ÃËKo >ltk Vtuxtud{tVm BGþrl.yturVmbtk ytvJtltk hnuNu
<u rmJtg ftbLþk vubuLx fhJtbtk ytJNu lrn òu MxtV MËalt ytvu <tu fubuhtbtk&e ftuBÃGþxhbtk
Vtuxt x[tLmVh fhe ytvJtlt hnuNu. yt ykdu ftuE vK J^thtltu Fao ytvJtbtk ytJNu lrn.
30. ftuEvK fthKmh xuLzh h> fhJtbtk ytJu <tu ftuLx[tfxh <u ykdu ftuEvK «fthltu n¬ >tJtu fu
J¤<hle btkdKe fhe NfNu lrn. yt Nh< MJeftgo ntug <ubKu s xuLzh ChÔþk.
31. bxehegÕm suJt fu hu<e, #xtu, mebuLx, vtEv, rJduhu MxtLzzo bxehegÕm MvuNeVefuNl «btKult
jtJJtlt hnuNu. sgtk ftuE atuFJx l &E ntug ðgtk ytE.yum.ftuz «btKu bxehegÕm jtJJtLþk
<&t xuMx´d fhtJJtLþk hnuNu. <ubs ftuLx[tfxhu muBvj yu«wÔz fhtÔgt ct> ftb NY fhtJJtLþk
32. yt xuLzhbtk òu ftuE ytExb hne dE ntug <tu <u atÕþ yum.ytu.yth.btk&e juJtbtk ytJNu ylu
òu yum.ytu.yth.btk ytExb l ntug <tu btfuox huEx&e huEx yultjemem fhe su CtJ Ft<t
<hV&e ytvu <u ftuLx[tfxhu juJtltu hnuNu. yt mbSlu s xuLzh ChJtLþk hnuNu. J^tht le
ytRxb btk ftuLx[tfxhle btkdKe Bþsc CtJ b¤Nu lrn.
33. atÕþ ftb >hBgtl «tuxufNlle mkÃËKo sJtc>the ftuLx[tfxhle hnuNu subtk vevzt, >tuhzt,
CgMËaf ctuzo, jtj xul , cuhefuxekd xuv, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtLþk ylu
mtaJJtLþk hnuNu. ylu ftuEvK yfMbt< &Nu <tu <ule mkÃËKo sJtc>the ftuLx[tfxhle hnuNu.
34. MxtV MËalt ytvu <tu mtEx Wvh zuEje «tud{um hSMxh ftuLx[tfxhu htFJtLþk hnuNu. >hhtus
ytme.mexe yuLSlegh©ele <ubtk mne juJtle hnuNu, <ubtk >hhtus ftb fh<t bswhtule mkÏgt,
fhuj ftbdehe <&t yr^ftheytuyu ftb Mþ^thJt fu «tud{um J^thJt ltuk^ fhuj ntug <tu <uLþk
ftuBÃjtgLm ytvJtLþk hnuNu ytJe ltuk^ltk sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu
ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe yuLSlegh©elu hnuNu <u ykdu ftuLx[tfxh ftuE
Jtk^tu jE NfNu lrn.
35. rlg< mbgbgto>tbtk ftb ÃþY l &gu&e xuLzh ¾jtuÍ bwsc ctfe ftbltkk 10.00% juFu vulÕxe
BGþrl.ftuvtuohuNllu åþfJJtle hnuNu.
36. xuLzh le yt Nh<tu ce - 1 Vtubobtk sKtJuj Nh<tulu ytuJhYj fhNu.
Wvhtuf< <btb Nh<tu <&t rlgbtu buk ft¤SÃËJof Jtkauj Au ylu blu fçËj bksqh Au.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtKÍtul)
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu M&¤le bwjtft< je^e Au ylu
ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu xuLzhlu jd<t >M<tJustu
ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt mkb< Awk/Aeyu.
ftuLx[tfxhle mne - rm¬tu yuze.mexe yuLSlegh
btuctEj lkch mt&u (œrûtK Ítul)
" ybœtJtœ BGþrlrmrvj ftuvtuohuNl”
œrûtK Ítul- Esluh Ftðþ
vtKe, z[ulus, vuJ´d, heEMxuxbuLxlt ftuLx[tfxhu Ftm JtkaJt ylu ægtlbtk htFJtle ctc< leau Bþsc Au.
" yt ftblt œhuf ytExblt sÚ&tbtk ~ËLg &e cMmtu xftle JD^x &Jt mkCJ Au. ftuE ytExbltu CtJ J^thtu
ytvJtbtk ytJNu lrn. yBþf søgtyu swlt vÚ&h s VheJth heEMxux fhJtlt &Nu. <uJe œhuf ytExbbtk J^^x &tg fu
ytExb yufÍefGþx l &tg <uÔþk vK clNu. ytlt btxu ftuEvK «fthle J¤<hle btkdKe fhJtle hnuNu lrn fu CtJ
J^thtu, vK ytvJtltu &Nu lrn. <ult btxu Ãþh<tk mt^ltu ylu bsqhtu ntug, yuf mt&u yluf søgtytuyu ftb fhJtle ûtb<t
ntug <ubKu s rJathelu xuLzh ChÔþk. bsqhtu l&e fu dtbzu s<t hÌtt Au fu ntu¤e, lJhtºte, rœJt¤e, jøl meÍl fu yLg
<nuJthtubkt fu «mkdtubtk bsqhtu ytJ<t l&e <uJt fu ceò ftuEvK cntlt nuX¤ ftb ck^ htFe NftNu lrn yLg&t htuslt
Yt.250.00le J^thtle vulÕxe ftb ck^ hnu fu MËalt fh<t ytuAt bsqhtu ytJu <ulu je^u fhJtbtk ytJNu.”
ftuLx[tfxhle mne yuze.mexe.yuLS.
rm¬t ylu btuctEj lkch (œrûtK Ítul)
AHMEDABAD MUNICIPAL CORPORATION
ENGGNIERING DEPARTMENT
GENERAL SPECIFICATION
Time limit for the work shall be as per tender notice after the order to start the
works. Progress of work should be in proportion to time limit. The details of reinforcement
of R.C.C. work shall be as per design and instructions of Add. City Engineer and his order
will be considered final.
The contractor shall have to maintain account of steel, cement and other materials
that may be brought by him on site. This account shall be regularly maintained and kept
open for inspection by Municipal Staff. Watering of all the items shall be as per
instructions otherwise no payment shall be made to contractors. Mixing of concrete shall
be done by concrete mixer machine. Arrangements of binding vibrator for R.C.C. works if
required shall have to be made by the contractor.
The contractor shall be remain responsible for Workmen’s compensation if any
accident. The contractor shall arrange for barricading at night and arrangement of Pagi at
night to direct the traffic. He shall be responsible for any damage to public. If any incident
happen, during the execution of work. In case of dispute for unseen or overlooked items
the decision of the Dy. City Engineer shall be final. The contractor shall have to give site
clean of all rubbish during the work and at the time of completion of work and hand over
the site with final finishing of the work as directed. All the rejected materials shall be
removed from site within 24 hours by contractor at this risk and cost. Debris shall have to
cart daily from site.
For mixing mortar either for masonry or for plaster or for any other purpose
contractor shall have to prepare through of bigger size and mix the mortar in the required
proportion. In on case he shall be allowed to mix the mortar either on floor or any finished
surfaces. The contractor shall have to make his own arrangement for water required for the
If any extra item crops up during the progress of work the same shall be carried out
by the contractor and he shall be paid at the rate fixed by Add.C.E. as per the rate analysis
based on latest SOR or if item is not available in SOR than based on current market rates.
In case of extra item decision of Add. City Engg. shall remain final regarding rate.
If in the interest of the Corporation it is necessary to change either any site or the
design of the propose work the contractor shall carry out the same at his quoted rates
without charges any extra and the contractor will have to carry out the works and he will
be paid at the rate quoted by him. No claim for extra rate for subsequent changes in site
and design is entertained.
The cubical contents of the cement bag shall be taken as 1-20 cft. Per bag and the
contractors shall have to prepare the measures boxes according to this measure.
Octroi exemption passes shall not be given for any materials required for the work.
Contractor will be fully responsible for compliance of the various provisions under
contract Act. 1970 and the Rules framed the to under.
The tender for the work shall remain open for a period (120) days from the date of
opening of the tenders for this work and that the tenderer shall not be allowed to withdraw
on modify the offer on his own during the period. If any tenderer withdraw or makes any
modifications or addition in the terms and conditions of his tender not acceptable to the
Municipal Corporation the Municipal Corporation shall without prejudice to any right or
remedy be at liberty to forfeit in full the said earnest money and black list the contractor.
If work is not started within specified time limit i.e. within ten days from the date of
order to start the work the penalty of the 0.01% tender Amount per day of delay of start
shall be recovered separately from the immediate bills payable to the contractor.
Contractor has to make his own arrangement for procurement of steel and cement.
Contractors should note the following conditions carefully:-
i) Conditional tender shall not be accepted.
ii) All tenders are to be submitted in duplicate without which the tenders are liable to be
iii) In case of tender downloaded from website, tender fee & EMD should be submitted
in form of demand draft.
iv) Condition of Form - B1 only Standard Specification of material & code of practice
will be applicable. Form B1 can be is available in website. Specification shall be as
per ' R & B Dept. - Govt. of Gujarat booklets of Building Works & and Road
Works Specifications published by Gujarat Book Depot, Sector-21. Gandhinagar.
Other techinical condition will be applicable as per tender condition only.
Contractor's signature & Stamp ADD CITY ENGINEER
Mobile No.:- (South Zone)