| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC | ₹18.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹21.4 L+₹2.5 L (13.1%)Rejected-Finance | ₹21.4 L+₹2.5 L (13.1%) | L2 | Rejected-Finance L2 |
| 3 | L3₹26 L+₹7.1 L (37.6%)Rejected-Finance | ₹26 L+₹7.1 L (37.6%) | L3 | Rejected-Finance L3 |
| 4 | L4₹28 L+₹9.1 L (48.1%)Rejected-Finance | ₹28 L+₹9.1 L (48.1%) | L4 | Rejected-Finance L4 |
| 5 | L5₹35 L+₹16.1 L (85.2%)Rejected-Finance | ₹35 L+₹16.1 L (85.2%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | POWERTECH TRANSFORMER SERVICES L5 | EME L7 | BASAVARAJM L2 | ADHATA CORPORATION L3 | TRANSGEAR ELECTRICAL SERVICES PVT LTD L4 | M/S SCIENTECS PROCESS CONTROL L1 | vindhya construction L6 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | PART A
Dismantling, dragging and storage of main body of OLD generator transformer and its accessories to UPRUVNL specified location
(Lump sum rate per transformer shall be quoted here) | 1 | Lump sum per transformer | 3,20,000 ₹3,20,000 Lowest | 5,80,000 ₹6,84,400 | 3,60,000 ₹4,24,800 | 3,25,000 ₹3,25,000 | 5,00,000 ₹5,90,000 | 2,90,000 ₹3,42,200 | 16,53,560 ₹19,51,200.8 |
| 1.02 | PART A
Receipt, handling, storage, erection, testing and commissioning and handing over the TELK make transformer. Price for 1 No. 250MVA, 15.75/230kV, 3-Ph, GT at Anpara Site (Scope of Work as per Clause 4.1 to 4.5 of tender)
(Lump sum rate per transformer shall be quoted here) | 1 | Lump sum per transformer | 14,80,000 ₹14,80,000 | 22,00,000 ₹25,96,000 | 4,33,000 ₹5,10,940 Lowest | 13,75,000 ₹13,75,000 | 12,00,000 ₹14,16,000 | 11,40,000 ₹13,45,200 | 25,10,120 ₹29,61,941.6 |
| 1.03 | PART A
Turning of transformer tank of TELK make GT by 180 degrees for proper placement on plinth (HV side- LV side direction matching w.r.t site condition) as per Cl 4.2 of scope of work. (Rate per turn per transformer shall be quoted here) | 1 | Per turn for 1 transformer | 1,00,000 ₹1,00,000 | 65,000 ₹76,700 | 1,25,000 ₹1,47,500 | 2,00,000 ₹2,00,000 | 1,00,000 ₹1,18,000 | 20,000 ₹23,600 Lowest | 30,000 ₹35,400 |
| 1.04 | PART A
Dragging (new GT) on rails / sleeper & placement on plinth of 250MVA transformer up to 100m dragging (Basic lump sum rate per meter per transformer shall be quoted here) | 200 | Price per meter | 8,00,000 ₹8,00,000 | 70,00,000 ₹82,60,000 | 6,20,000 ₹7,31,600 | 4,00,000 ₹4,00,000 | 4,00,000 ₹4,72,000 | 2,20,000 ₹2,59,600 Lowest | 2,40,000 ₹2,83,200 |
| 1.05 | PART A
Dragging (Old GT) on rails / sleeper & placement on plinth of 250MVA transformer up to 100m dragging (Basic lump sum rate per meter per transformer shall be quoted here) | 200 | Price per meter | 8,00,000 ₹16,00,000 | 70,00,000 ₹82,60,000 | 6,00,000 ₹7,08,000 | 5,00,000 ₹10,00,000 | 4,00,000 ₹4,72,000 | 2,20,000 ₹2,59,600 Lowest | 2,40,000 ₹2,83,200 |
| 2.01 | PART B (OPTIONAL) Additional dragging of transformer on rail / sleeper either due to distance being more than that specified in scope of work
(Basic lump sum rate per meter per transformer shall be quoted here) | 1 | Price per meter | 4,000 ₹4,000 | 30,000 ₹35,400 | 3,000 ₹3,540 | 3,000 ₹3,000 | 2,000 ₹2,360 | 1,000 ₹1,180 Lowest | 1,200 ₹1,416 |
| 2.02 | PART- B (OPTIONAL) Additional Turning of transformer by 180 degree for dragging / placement of plinth (Basic lumpsum rate shall be quoted here) | 1 | Lump Sum | 1,00,000 ₹1,00,000 | 65,000 ₹76,700 | 1,20,000 ₹1,41,600 | 1,50,000 ₹1,50,000 | 1,00,000 ₹1,18,000 | 20,000 ₹23,600 Lowest | 50,000 ₹59,000 |
| 2.03 | PART- B (OPTIONAL) Processed Oil ( BDV>80kV/2.5mm gap and ppm <10 )filling under Vacuum for Main transformer tank along with all accessories and Conservator (For long storage purpose of Main body due to unexpected delay in ETC works).
(Basic lumpsum rate shall be quoted here) | 1 | Lump Sum | 8,00,000 ₹8,00,000 | 5,00,000 ₹5,90,000 | 15,00,000 ₹17,70,000 | 2,50,000 ₹2,50,000 | 8,00,000 ₹9,44,000 | 1,00,000 ₹1,18,000 Lowest | 1,20,000 ₹1,41,600 |
| 2.04 | PART-B(OPTIONAL)
Testing and Commissioning of GT (already Erection and oil processing completed) (Basic lumpsum rate shall be quoted here) | 1 | Lump Sum | 1,60,000 ₹1,60,000 | 5,00,000 ₹5,90,000 | 1,05,000 ₹1,23,900 | 2,00,000 ₹2,00,000 | 1,50,000 ₹1,77,000 | 80,000 ₹94,400 Lowest | 1,50,000 ₹1,77,000 |
| 2.05 | PART-B (OPTIONAL)
To carryout additional drying of transformer beyond the mandatory cycles) by N2 purging & heating under N2 filled condition. Supply of N2 cylinders having required dew point and heaters shall be contractor scope
(Rate per cycle shall be quoted here) | 1 | Price / Cycle | 2,00,000 ₹2,00,000 | 2,00,000 ₹2,36,000 | 4,10,000 ₹4,83,800 | 5,00,000 ₹5,00,000 | 4,50,000 ₹5,31,000 | 50,000 ₹59,000 Lowest | 65,000 ₹76,700 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
18 Jul 2025, 10:00 amClosed
SMRSM
TELK, ANGAMALY
DISASSEMBLING AND SHIFTING OF EXISTING 1 UNIT BHEL MAKE OLD GT FROM SERVICE BAY TO STORAGE BAY. ERECTION, TESTING AND COMMISSIONING AT SERVICE BAY OF 1 UNIT OF TELK MAKE 250MVA GT WITH OCTC FOR ANPARA UPRVUNL SONBHADRA DIST. UP.
2025_TEKL_770386_1
TELK/C AND M/OES/TRER/344/2025
Open Tender
Miscellaneous Works
Item Wise
365 days
ANPARA THERMAL POWER STATION UP
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,750
Yes
₹25,000
Yes
14 Nov 2025
19 Jun 2025
19 Jul 2025
19 Jun 2025
18 Jul 2025
19 Jun 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .