Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H3₹2.3 L−₹2,501 (0.81%)Accepted-AOC 15 DASEDA COMPLEX SITAMOU DISTT MANDSAUR | SITAMOU | MANDSAUR | MADHYA PRADESH | ₹2.3 L−₹2,501 (0.81%) Quoted ₹3.0 L | H3 | Accepted-AOC Lower rate Quoted |
| 2 | H1₹3.1 LRejected-Finance | ₹3.1 L | H1 | Rejected-Finance Higher rate quoted |
| 3 | H2₹3.1 L−₹1,281 (0.42%)Rejected-Finance KEM NAGAR BABHUIYA RED SEVMI DISTT SEONI 480651 MP | 480651 | ₹3.1 L−₹1,281 (0.42%) | H2 | Rejected-Finance Higher rate quoted |
| Sl No | Description | Qty | Unit | Nityam Enterprises H3 | nitin KUMAR NEMA ELECTRICAL CONTRACTOR H2 | MAA ASHAPURA ENTERPRISES H1 |
|---|---|---|---|---|---|---|
| 1.00 | 220KV Substation Ratlam :- 1.5 Tanker Par day Water Supply for the duration from dated 01.03.2026 to dated 30.06.2026. (Total =122 Days).6000 ltr. Per day & Tanker Capacity @ 4000 liters (122 days x 1.5 tanker per day = 183 tankers) | 183 | Nos | 91,317 ₹91,317 Lowest | 91,683 ₹91,683 | 91,866 ₹91,866 |
| 2.00 | 220KV Substation Daloda :- 1 Tanker Par day Water Supply for the duration from dated 01.03.2026 to dated 30.06.2026. (Total =122 Days). 4000 ltr. Per day & Tanker Capacity @ 4000 liters
(122 days x 1 tanker per day = 122 tankers) | 122 | Nos | 60,878 ₹60,878 Lowest | 61,122 ₹61,122 | 61,000 ₹61,000 |
| 3.00 | 220KV Substation Nagra :- 1 Tanker Par day Water Supply for the duration from dated 01.03.2026 to dated 30.06.2026. (Total =122 Days). 4000 ltr. Per day & Tanker Capacity @ 4000 liters
(122 days x 1 tanker per day = 122 tankers) | 122 | Nos | 60,878 ₹60,878 Lowest | 61,122 ₹61,122 | 61,000 ₹61,000 |
| 4.00 | 220KV Substation Jaora :- 1 Tanker per second day Water Supply for the duration from dated 01.03.2026 to dated 30.06.2026. (Total =122 Days). 4000 ltr. Per Second day & Tanker Capacity @ 4000 liters
(122 days x 1 tanker per second day = 61 tankers) | 61 | Nos | 30,439 ₹30,439 Lowest | 30,561 ₹30,561 | 30,500 ₹30,500 |
| 5.00 | 132KV Substation Sailana :- 1 Tanker per second day Water Supply for the duration from dated 01.03.2026 to dated 30.06.2026. (Total =122 Days). 4000 ltr. Per Second day & Tanker Capacity @ 4000 liters
(122 days x 1 tanker per second day = 61 tankers) | 61 | Nos | 30,439 ₹30,439 Lowest | 30,561 ₹30,561 | 30,805 ₹30,805 |
| 6.00 | 132KV Substation Tal :- 1 Tanker per second day Water Supply for the duration from dated 01.03.2026 to dated 30.06.2026. (Total =122 Days). 4000 ltr. Per Second day & Tanker Capacity @ 4000 liters
(122 days x 1 tanker per second day = 61 tankers) | 61 | Nos | 30,439 ₹30,439 Lowest | 30,561 ₹30,561 | 31,720 ₹31,720 |
Tender Value
₹3.2 L
EMD Value
₹6,400
Closing Date
3 Mar 2026, 3:00 pmClosed
Executive Engineer
Office of Executive Engineer T Dn MPPTCL Ratlam
Supply of drinking and earth pit water through private tankers from dated 01.03.2026 up to dated 30.06.2026 at various EHV Substation under Testing Division MPPTCL Ratlam
2026_MPPTC_481751_1
2025-26/TS-07
Open Tender
Miscellaneous Services
Fixed-rate
120 days
EHV S/s Under Testing Dn. Ratlam
Please refer tender document enclosed
6 documents required · 6 mandatory
₹590
₹6,400
Yes
21 Apr 2026
11 Feb 2026
4 Mar 2026
12 Feb 2026
3 Mar 2026
12 Feb 2026
stage.html
html • 0.05 MB
technical_566344.pdf
techsummary_566344.pdf
finance_566344.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.32 MB
TENDER.pdf
Tender Documents • 12.74 MB
BOQ_566344.xls
BOQ • 0.28 MB
EXTII.pdf
PDF • 0.28 MB
EXT.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .