| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.3 Cr+₹1.7 L (0.77%)Admitted-Finance | ₹2.3 Cr+₹1.7 L (0.77%) | L2 | Admitted-Finance |
| 3 | L3₹2.3 Cr+₹7.4 L (3.27%)Admitted-Finance | ₹2.3 Cr+₹7.4 L (3.27%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | m/s kumar infratech L2 | PURNAGIRI CONSTRUCTION CO. L3 | CHAND CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Part A Construction Work
WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means | 245.83 | Cum | 2,000 ₹4,91,660 | 1,950 ₹4,79,368.5 Lowest | 2,200 ₹5,40,826 |
| 2.00 | Prime Coat
Medium porosity Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502. | 3,277.55 | Sqm | 20 ₹65,551 Lowest | 26 ₹85,216.3 | 37 ₹1,21,269.35 |
| 3.00 | Tack Coat Before BM
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 25,227.56 | Sqm | 10 ₹2,52,275.6 Lowest | 11 ₹2,77,503.16 | 11 ₹2,77,503.16 |
| 4.00 | Bituminous Macadam (BM)
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) with Bitumen VG-10 | 1,387.54 | Cum | 7,400 ₹1,02,67,796 | 7,800 ₹1,08,22,812 | 7,000 ₹97,12,780 Lowest |
| 5.00 | Tack Coat before SDBC
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 41,069.44 | Sqm | 10 ₹4,10,694.4 Lowest | 10 ₹4,10,694.4 Lowest | 10 ₹4,10,694.4 Lowest |
| 6.00 | Semi Dense Bituminous Concrete (SDBC)
Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Grading II - 10mm using VG - 10 bitumen (bituminous binder @ 5 % of mix) | 1,026.75 | Cum | 8,500 ₹87,27,375 Lowest | 9,200 ₹94,46,100 | 9,000 ₹92,40,750 |
| 7.00 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per technical Specification Clause 303.1. | 771.41 | Cum | 400 ₹3,08,564 | 175 ₹1,34,996.75 Lowest | 400 ₹3,08,564 |
| 8.00 | Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6 | 40 | Cum | 5,000 ₹2,00,000 | 4,500 ₹1,80,000 Lowest | 5,000 ₹2,00,000 |
| 9.00 | Cement Concrete (PCC M-30) Pavement:- Construction of Un-reinforced, Cement concrete pavement, thickness as per design, over a prepeared sub base with 43 grade cement or any other type PCC Grade M-30, coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of wedges, steel plates including levelling the formwork and laying and fixing of 125 micron thick polythene film, as perdrawing), spreading the concrete with shovels, rakes, compacted using needle, and plate vibrators, finished in continuous operation and curing of concrete slabs for 14 days, using curing compound where specified and water finishing to lines and grade as per drawings and technical specification | 203.45 | Cum | 6,000 ₹12,20,700 | 5,350 ₹10,88,457.5 Lowest | 5,800 ₹11,80,010 |
| 10.00Part B : Maintenance Work Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908 | ||||||
Tender Value
Refer Docs
EMD Value
₹5.1 L
Closing Date
6 Mar 2024, 1:00 pmClosed
SE 3rd Circle PWD Pithoragarh
SE 3rd Circle PWD Pithoragarh
Improvement work by Hotmix (B.M./S.D.B.C.) at internal roads in Tanakpur and Banbasa constituency area and district Champawat under Hon. CM announcement no. 35/2023 under state sector and 3 years maintenance work.
2024_pwd_70553_1
489/208C(YataD)-03/2023 Dated 26-02-2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Champawat
As per bid documents
3 documents required · 3 mandatory
₹5,900
EE PD PWD Champawat
₹5.1 L
SE 3rd Circle PWD Pithoragarh
11 Mar 2024
29 Feb 2024
6 Mar 2024
29 Feb 2024
6 Mar 2024
29 Feb 2024
2 Mar 2024
Amount
Part A Construction Work WBM Grading 3 Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. By Mechanical Means
Prime Coat Medium porosity Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90- 1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.
Tack Coat Before BM Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Bituminous Macadam (BM) Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. (Bitumen VG-10 @ 3.3% of the weight of mix has been used for analysis purpose. The choice of bitumen will depend upon the prevailing site conditions and shall be in accordance with Clause 504 of MORD) with Bitumen VG-10
Tack Coat before SDBC Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
Semi Dense Bituminous Concrete (SDBC) Providing and laying Semi Dense Bituminous Concrete with the use of batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Grading II - 10mm using VG - 10 bitumen (bituminous binder @ 5 % of mix)
Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per technical Specification Clause 303.1.
Providing concrete for plain/ reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6
Cement Concrete (PCC M-30) Pavement:- Construction of Un-reinforced, Cement concrete pavement, thickness as per design, over a prepeared sub base with 43 grade cement or any other type PCC Grade M-30, coarse and fine aggregates conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (Steel channel, laying and fixing of wedges, steel plates including levelling the formwork and laying and fixing of 125 micron thick polythene film, as perdrawing), spreading the concrete with shovels, rakes, compacted using needle, and plate vibrators, finished in continuous operation and curing of concrete slabs for 14 days, using curing compound where specified and water finishing to lines and grade as per drawings and technical specification
Part B : Maintenance Work Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion repair, repairs to cracks, parapet wall and protection work as per drawing and technical specification Clause 1908
1st year
2nd year
3rd year
Maintenance of Slab type Culverts by way of clearing, Cleaning, Erosion repair, repairs to cracks, parapet walls and Protection works as per drawing and technical specification Clasue 1908
1st Year
2nd Year
3rd Year
Trimming of grass and weeds from the shoulders/berms and disposing off the same to suitable locations as per technical specifications Clause 1914
1st Year
2nd Year
3rd Year
Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat with bitumen emulsion, 20 mm thick pre-mix carpet using catonic bitumen emulsion and seal coat type B with bitumen emulsion. 13.1 - 1st Year - NIL 13.2 - 2nd Year - NIL
3rd year
Maintenance of Earhen shoulder (stripping of excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor at OMC as per drawings and Technical Specification Clause 1903.
1st Year
2nd Year
3rd Year
m/s kumar infratech
PURNAGIRI CONSTRUCTION CO.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .