| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 LAccepted-AOC 200 NAVAGAM NAVAGAM TA SAYLA SURENDRA NAGAR GUJARAT 363430 | SURENDRANAGAR | GUJARAT | 363430 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹32.3 L+₹6.3 L (24.4%)Rejected-Finance | L2 | Rejected-Finance Other then lowest bidder | |
| 3 | L3₹35.6 L+₹9.6 L (37.0%)Rejected-Finance B 39 UPPER GROUND FATEH NAGAR NEW DELHI 110018 | WEST | DELHI | 110018 | L3 | Rejected-Finance Other then lowest bidder | |
| 4 | L4₹48.7 L+₹22.7 L (87.3%)Rejected-Finance 1763 JOSHI VAS OPP RAMJI MANDIR B H NAVRANGPURA POLICE STATION NAVRANGPURA AHMEDABAD GUJARAT 380009 | AHMADABAD | GUJARAT | 380009 | L4 | Rejected-Finance Other then lowest bidder |
Tender Value
₹32 L
EMD Value
₹64,000
Closing Date
6 Jan 2025, 6:00 pmClosed
Col Manish Dhaka CWE
HQ CWE (AF) Chiloda Military Engineer Services P.O CRPF Campus Vayu Shakti Nagar Gandhinagar 382042
COMPREHENSIVE MAINTENANCE AND REPAIR OF CENTRALISED AIR CONDITIONING PLANT AT VSN GANDHINAGAR
2024_MES_687605_1
82230/CHL/E8
Open Tender
Electrical and Maintenance Works
Item Rate
334 days
Chiloda
As per tender documents
7 documents required · 7 mandatory
₹500
Yes
GE (AF) Chiloda
₹64,000
5 Feb 2025
7 Dec 2024
14 Jan 2025
7 Dec 2024
6 Jan 2025
23 Dec 2024
8 Dec 2024 - 22 Dec 2024
Amount
M & L Comprehensive maintenance for chilling package of (350X2=700 TR) Screw type refrigeration Compressor with R134A refrigerant with Microprocessor panel and suction and Discharge control valves including one annual and three periodical inspection during the contract period at approximately equal intervals by the OEM and the maintenance programme will proceed as and when required as per the inspection report provided by company representative and servicing of complete power supply system of the AC Plant including sub panels complete all as specified and directed by the Engr in Charge.
M & L Comprehensive maintenance for chilling package of (50X3=150 TR) Scroll type refrigeration Compressor with R407C refrigerant with Microprocessor panel and suction and Discharge control valves including one annual and three periodical inspection during the contract period at approximately equal intervals by the OEM and the maintenance programme will proceed as and when required as per the inspection report provided by company representative and servicing of complete power supply system of the AC Plant including sub panels complete all as specified and directed by the Engr in Charge.
NOTE FOR SERIAL ITEM NO 01 & 02 ABOVE:- (a) Carry the proper functioning of microprocessor panel and take the control test (b) Check the electrical panels for tripping, overheating, chattering in electrical parts and terminals for proper tightness. (c) Check for proper working of all Ammeters, voltmeters, Hour mtrs, KWH Mtrs and overload relays, fan belt etc and replacing the same if found unserviceable (d) Checking the operation of MCCB's up to 250 Amps, MCB, Isolators, etc and replacing the same if found unserviceable. Proper load balancing should be carried out by the contractor of electric supply system to the chiller machines and necessary arrangements will be carried out for measurement of electric load in all phases by the contractor at no additional cost and the subject report of load in the electrical panel will be submitted at the time of inspection report of the chillers. (e) Clean electrical panels and chiller machine periodically. (f) Check functioning of water flow switch and interlock in the system. (g) Check all safety and operating controls for proper functioning and replace if the same is defective for proper sequence of operation of the machine (h) All the breakdowns including compressor failure will be attended and the visit shall not be counted in periodical inspection. (j) Check refrigerant filter and drier core, replace the same , if found necessary. (k) Check oil level and oil heater in the system. (l) Check chilled water flow by checking pressure drop across the chiller (m) Check evaporator and condenser approach and compare the chilled water temperature at full load with the chilled water temperature control (n) Seasonal adjustment of controls if required and software upgrade (o) Inspect entire system for any unusual condition such as noise, vibration etc (p) Supply of electrical parts except electrical spares for incoming panel. (Electrical Spares Like:- fuses, incoming electrical controls, flexible wire, All type of starter parts including wiring etc)
(q) All changes/ repair shall be valid only after satisfaction of Engr in Charge / GE. Contractor shall submit all related documents of expenditure of AMC time to time to avoid delay on payment(r) Checking the operation of all suction and discharge control valves etc If found faulty /leakage to be replaced by the contractor without any extra cost.(s) Filling of oil.(t) The contractor shall also arrange require tools for attend routine services/minor breakdown call like an adjustable spanner, clamp meter, pressure gauge with gorging line, digital temperature gun, fix spanner set, Allen key set, screw driver set, cotton waste software support if require.(u) The contractor shall also arrange require equipment's for attend major breakdown call like as a vacuum pump, Digital Vacuum gauge, Refrigerant recovery unit, Empty refrigerant cylinders, dehydration tank and require spanners.(v) clean the cooling tower and Drain the water and clean the sump of cooling tower, Clean pot strainer/y-strainer, check the condition of fills, if required, clean the fills with detergent, check for operation of shut off valves.(s) If AC Plant have occur any breakdown take immediate action arrange to provide all necessary material, T&P and labour, unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done on the base of Rs.3000/- per hourNote:- Descaling of condenser and chiller tubes, Checking leakage of refrigerant and nitrogen pressure testing including nitrogen, Gas (Refrigerant), Temperature sensor, Bellows, Differential pressure switch unit, Expansion Valve, Compressor Oil, Servicing of Secondary pump, Servicing of primary & Secondary pump, Servicing of chiller water pumps/condenser water pump, Servicing of blowers for AHU's with induction motor, single phasing preventer, electronic timer will be under items of BOQ
M & L Descaling of 350X2=700 TR (chemical cleaning and physical cleaning) of condenser and chiller tubes all as specified and directed by Engr-in-Charge.
M & L Descaling of 50X3=150 TR TR (chemical cleaning and physical cleaning) of condenser and chiller tubes all as specified and directed by Engr-in-Charge.
M & L Checking leakage and shortage of refrigerant in the machines of 350X2=700 TR/ 50X3=150 TR with soap solution and rectify the system defect causing leakage rectification including topping up of refrigerant. If leakage is not rectified by the soap solution, then nitrogen pressure testing will be carried out to identify the refrigerant leakage through the chiller machine and refilling/topping up of refrigerant. Amount quoted by the contractor should be inclusive of cost of nitrogen pressure testing including Nitrogen complete all as specified and directed by Engr-in Charge
Supply & filling Gas R134A/ R407C of 350X2=700 TR/50X3=150 TR unit for AC Plant complete all as specified and directed by Engr-in Charge
S&F Temperature chilled water sensor/Temperature cooling water sensor as per existing sample of AC Plant complete as in repairs all as specified and directed by Engr-in Charge
S & F Bellows of size 250x200 mm as per existing complete as in repairs all as specified and directed by Engr-in Charge.
S&F Differential pressure switch unit as per existing sample of 350X2=700 TR/ 50X3=150 TR Ac plant complete as in repairs all as specified and directed by Engr-in Charge.
S & F Expansion Valve as per existing sample including all connected accessories of AC Plant complete as in repairsall as specified and directed by Engr-in Charge.
Supply & filling Compressor Oil of AC Plant complete all as specified and directed by Engr-in Charge.
M&L Servicing of back pull out primary chilled water pump with induction motor of Cap- 20 HP operated on 240V, 50 Hz with replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete all as specified and directed by Engr-in-charge.
M&L Servicing of back pull out Secondary chilled water pump with induction motor of Cap- 30 HP operated on 240V, 50 Hz with replacing of box set-04 Nos, mechanical seal -01 no, cut off switch 01 no, bearing 02 Nos, Air filling in tank complete all as specified and directed by Engr-in-charge.
M&L Servicing of back pull out condenser water pump with induction motor of Cap- 40 HP operated on 240V, 50 Hz with replacing of defective parts such as box, mechanical seal , cut off switch, bearing , complete all as specified and directed by Engr-in-charge.
M&L Servicing of back pull out chiller water pumps/condenser water pump with induction motor of Cap- 5 HP operated on 240V, 50 Hz with replacing of box set-04 Nos, mechanical seal -01 no, cut off switch 01 No, bearing 02 Nos, Air filling in tank complete all as specified and directed by Engr-in-charge.
M&L Servicing of blowers for AHU's with induction motor of Cap- 10 HP operated on 240V, 50 Hz with replacing of defective parts such as box, mechanical seal , cut off switch, bearing , Fan Belt complete all as specified and directed by Engr-in-Charge.
Note for item No.12 to 16 (a) Check the alignment and conditions of coupling to prevent damage to shaft and impeller. (b) Lubricate bearings with grease guns. (c) Replace gland thread if required. (d) Check lubricant oil level and make up the oil if required. (e) Check packing and mechanical seals for leakage. (f) Half yearly inspection and service for pumps (g) Inspect shaft sleeves, shaft, bearings, bearing housing and overhauling of all pumps. (h) The impeller and shaft to be repaired and made functional. If they are found not repairable, then same will be replaced. (i) The packing, mechanical seal, bush, bearing, Shaft sleeves, coupling Fan belt etc. If found faulty to be replaced by the contractor without any extra cost.
M&L Rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity 5 HP, three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & DE moisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete as in repairs all as specified and directed by Engr-in-Charge.
M&L Rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity 10 HP, three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & de moisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete as in repairs all as specified and directed by Engr-in-Charge.
M&L Rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity from 20 HP, three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & de moisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete as in repairs all as specified and directed by Engr-in-Charge.
M&L Rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity from 30 HP, three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & de moisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete as in repairs all as specified and directed by Engr-in-Charge.
M&L Rewinding the existing unserviceable burnt motors of condenser/chiller water pumps (Pressure pumps) of capacity from 40 HP, three phase, 50 cycles by disconnecting electrically and mechanically and transporting to the locally workshop. Dismantling the motor and removing the old burnt copper winding & de moisturise, cleaning, rewinding the coils with same gauge supper enamelled copper wire, with suitable F class paper insulation, varnishing, and reassembling by replacing bearings reinstalling at the installation and testing, commissioning etc complete as in repairs all as specified and directed by Engr-in-Charge.
M & L Spray oil painting of AC plant including motor, pipe Colling tower etc on existing colour complete all as specified and directed by Eng-in-Charge.
S&F MCCB 3 pole 630 Amp, 50 KA, 415 volts 50 Hz including operating handle complete as in repairs all as specified and directed by Eng-in-Charge.
Supply and laying PVC insulated unsheathed, multi stranded copper conductor flexible cable 1100 volt grade of size 2.5 Sqmm 3 core. laid in trenches / duct passing through pipe / duct or fixed on pole and connecting and testing complete all as specified and as directed.
Supply and laying PVC insulated unsheathed, multi stranded copper conductor flexible cable 1100 volt grade of size 2.5 Sqmm 4 core. laid in trenches / duct passing through pipe / duct or fixed on pole and connecting and testing complete all as specified and as directed.
S&F MCCB 3 pole 250 Amp, 36 KA, 415 volts 50 Hz including operating handle complete as in repairs all as specified and directed by Eng-in-Charge.
S&F MCCB 3 pole 125 Amp, 16 KA, 415 volts 50 Hz including operating handle complete as in repairs all as specified and directed by Eng-in-Charge.
Supply, laying and testing of cable XLPE insulated screened PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 95 sqmm 3.5 core complete all as specified and directed.
Supply, laying and testing of cable XLPE insulated screened PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 50 sqmm 3.5 core complete all as specified and directed.
S&F Thermometer gauge with connected assembly as per existing sample including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.
S&F AHU Micro Fibber Primary HEPA filter as per existing sample including all connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.
M & L Motor starter of any type, carrying out repair and including replacement of defective minor spare parts such as connector, burn control copper cable, insulator, Terminal block, copper thimbles, NO NC aux block and ON/OFF push button etc or if any other required minor spare parts at site for including testing to ensure efficient and smooth functioning of starter complete as in repairs all as specified and directed by Engr-in-Charge.
S&F Contactor of AC3, 10/20A 415 Volt, 50 Hz as per existing sample including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.
S&F Contactor of AC3, 32/40A 415 Volt, 50 Hz as per existing sample including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.
S&F Single phasing preventer as per existing sample, including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.
S&F Electronic timer as per existing sample, including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.
S&F Overload relay, 14-23A 415 Volt, 50 Hz as per existing sample including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.
S&F Overload relay, 24-40A 415 Volt, 50 Hz as per existing sample including all electrical connections, testing complete as in repairs all as specified and directed by Engr-in-Charge.
Note : In case of any AC Plant breakdown has occurred, the contractor shall take immediate action arrange all necessary material, T & P and labour and the contractor is, unable to provide material and delay in smooth operation/working of AC Plant/AHU etc recovery will be done on the base of Rs. 3000/- per hour.
Dighard Electricals (BID ID -3207372)
Abhishek Enterprises (BID ID -3205241)
MK Aircon Systems Pvt. Ltd. (BID ID -3206948)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .