| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹14.6 Laccepted-aoc | accepted-aoc |
Tender Value
₹15.3 L
EMD Value
₹15,350
Closing Date
25 Feb 2026, 4:00 pmClosed
Executive Engineer RWS and S Division Guntur
ZP Compound Nagaram Palem Guntur
Construction of Clear water sump to the PWS Scheme in Venigandla Village Pedakakani Mandal, Est. Cost Rs. 22.00 Lakhs
897661
28 GPGF 15 FC 2025 26 EE RWS S GNT
OPEN - NCB
Water Supply
GUNTUR, ANDHRA PRADESH
7 documents required · 7 mandatory
₹543
₹15,350
12 Mar 2026
11 Feb 2026
11 Feb 2026
Earth work excavation in BC soils and depositing on bank with initial lead and lift for excavation of Valve pits foundations portion of all materials and labour charges for 1st Mattu etc.,,Complete including over heads and contractors profit @ 13.615%.
Earth work excavation in BC soils and depositing on bank with initial lead and lift for excavation of Valve pits foundations portion of all materials and labour charges for 2nd Mattu etc.,,Complete including over heads and contractors profit @ 13.615%.
CC (1:4:8) using 40 mm HBG metal for filling the foundation including cost and conveyance of all materials etc., Complete including overheads and contractors profit @ 13.615%
Filling the foundation with sand including cost, conveyance watering and ramming etc complete including over heads and contractors profit @ 13.615%.
M-30 grade concrete using 20 mm HBG metal including cost and conveyance of all materials and labour for bottom Raft excluding cost of steel etc., Complete including overheads and contractors profit @ 13.615%
M-30 grade concrete using 20 mm HBG metal including cost and conveyance of all materials and labour for Side Walls excluding cost of steel etc., Complete including overheads and contractors profit @ 13.615%
M-30 grade concrete using 20 mm HBG metal including cost and conveyance of all materials and labour for Top Doome excluding cost of steel etc., Complete including overheads and contractors profit @ 13.615%
M-30 grade concrete using 20 mm HBG metal including cost and conveyance of all materials and labour for Ring Beam excluding cost of steel etc., Complete including overheads and contractors profit @ 13.615%
Acco proof plastering with CM (1:3), 12mm thick including cost and conveyance of all materials etc., Complete including overheads and contractors profit @ 13.615%
Cement plastering with CM (1:3) 12 mm thick including cost and conveyance of all materials etc., Complete including overheads and contractors profit @ 13.615%
Snowcem painting including cost and conveyance of all the materials for side walls out side, Ring beam & Top Dome etc., Complete including overheads and contractors profit @ 13.615%
Providing High Yield Deformed (HYSD) /Thermo Mechanically Treated (TMT) /Mild Steel (MS) steel bars( Fe 415 / Fe 500 grade as per ISI 1786-1979 )of difference diameters for RCC works,including labour charges for straightening, cutting, bending to required sizes and sapers, placing in position with cover bolcks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars, including cost and conveyance of binding wire, cover blocks and all incidental ,operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all mterials etc,.completd for finished item of work in all floors ( APSS No 126 ) etc complete including over heads and contractors profit @ 13.615%.
Supply and placing of the Manhole cover including cost and conveyance of the materials etc.,complete including over heads and contractors profit @ 13.615%.
Construction of pipe line for water supply with 200 mm dia HDPE 6 Kg/Sq cm pipe -PE-100 grade (from Department Empanelled Manufacturer) Pipe line for water supply including earth work excavation and depositing on bank with an initial lead and lift in B. C. Soils and other soils except hard granite soils as per S.S. No 20 B for Pipe line trench of size 0.70 x1.00m by 2/3rd Machine and 1/3rd manual including lowering and laying of HDPE PE 100 grade Pipes true to alignment and gradient and jointing them using required specials and refilling the trenches with excavated earth after testing the pipe line with water to required pressure including cost and conveyance of all materials and all labour charges etc., Complete including over heads and contractors profit @ 13.615%.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
NITVol I_Venigandla-22.00L.doc
TENDER_DOCUMENT • 0.16 MB
NIT-Vol-II_Venigandla-22.00L.doc
TENDER_DOCUMENT • 0.14 MB
Venigandla AS.pdf
TENDER_DOCUMENT • 0.39 MB
Venigandla Schedule-22.00.xlsx
TENDER_DOCUMENT • 0.06 MB
Venigandla tender reqest letter.pdf
TENDER_DOCUMENT • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .