| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹9.2 CrAccepted-AOC G1 12 INDEXEL ENGINEERING ROAD NO 4 I P I A KOTA KOTA RAJASTHAN 324005 | KOTA | RAJASTHAN | 324005 | ₹9.2 Cr Quoted ₹9.3 Cr | L-1 | Accepted-AOC L-1 bidder |
| 2 | Rejected-Technical 801802 SAKAR IV OPP MJ LIBERARY ELLISBRIDGE ASHRAM ROAD AHMEDABAD AHMEDABAD GUJARAT 380006 | 801802 | - | - | Rejected-Technical Rejected. (Being enlisted in Class B-66/CECC i.e. two class below the eligible class, enlistment was valid upto 31 Dec 2020, Declared un-enlisted, banned for issue of tender by HQ CECC, already secured 03 works in MES and still not get registered. |
| Sl No | Description | Qty | Unit | Indexel Engineering Pvt LTd L1 |
|---|---|---|---|---|
| 1.00 | PART-I
Design, Develop, Integrate and Commissioning SCADA System alongwith controller system of existing DG sets for integration of SCADA system with existing DG sets and various analysing equipment for Water Supply System as indicated in the layout diagram enclosed and as per details attached at Table (Appendix 'F' to Particular Specification). The SCADA system shall comprise of following:-
(a) Master Control station with personal computer with latest processor and monitor of suitable size.
(b) UPS with half an hour backup
(c) Laser Printer
(d) Server
(e) Data Gateway
(f) SCADA software which can be operated, programmed and modified by agencies other than developer
(g) PLC/Microprocessor Controllers with panel indoor/outdoor applications for water sensing display, pump oprations with RTU/without RTU or Microprocessor controller and microprocessor transmitter as required at site along with UPS of half an hour backup.
(h) Suitable communication system including payment of bills to telecom service provider.
Item Continued as 1.01 to 1.02 | 1 | EACH JOB | 7,00,00,000 ₹7,00,00,000 Lowest |
| 1.01(j) Motorised butterfly valves as per site requirement direct/indirect type (k) Pressure transmitters (l) Ultrasonic sensors/ Radio frequency sensors (m) Flow meters and switches (n) Smart motor protection (o) Online residual Cholorine analyser (p) Ultrasonic Level Sensor (q) Turbidity, PH Transmitter & Sensors (r) Omini or Bi directional Parabolic antennas (s) PLC based MIMIC panel. (t) Fuel level Sensors (u) Temperature sensors for monitoring radiator (v) Low oil level pressure sensors (w) Any left out items/components required for complete the SCADA system. (x) Neccessory communication cable/control cable and power cables defferent size, any length and qty may be required for implementation of SCADA in pump houses/control station shall deemed to be included. | ||||
| 1.02NOTES : (i) Design of Communication System shall be done by the bidder. Cloud based server/ data storage/ communication shall not be used and only local server based system shall be designed. (ii) The cost of each item shall also be attached to arrive at pricing in case of some addition/reduction at site. (iii) Operating system, system software and programming shall not be intellectual property of any agency. (iv) The memory in the hard disk shall be suitable for six months data. The backup storage device/devices shall be provided for archiving of data more than six months old. (v) In case of addition of installations, the system shall be capable of integrating the same. (vi) The responsibility of the agency is restricted to intimate mechanical and electrical failures such as failure of pumps, leakages etc. Such repairs shall be carried out by MES. (vii) Operation and maintenance charges of operation for two years of defect liability period and maint and operation including comprehensive maintenance for eight years after defect liability period shall be paid separately. (viii) The SCADA system should have provision of both manual and automatic operation of installations. (ix) Third party inspection of the whole scheme and SCADA system for ensuring satisfactory and smooth functioning of SCADA system shall be carried out by Central Govt approved agency / firm before issuing the completion certificate to the contractor. | ||||
| 2.00 | Operate SCADA system during Defect Liability Period for two years after completion of work (Contractor to provide month wise breakdown details of data / information) including payment of bills by telecom service provider (not to exceed 4% of item No-1). | 2 | EACH YEAR | 22,00,000 ₹44,00,000 Lowest |
| 3.00 | Operation and comprehensive maintenance of SCADA system including cost of upgradation, cost of spares for 04 years post defect liability period, operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of data / information) complete. (Not to exceed 4% of item No -1)
Note :- Cumulative payment shall be made (after expiry of DLP) on not exceeding basis as per following schedule :-
(i) After 1st Year
(ii) After 2nd Year Not to exceed 4% of item No 1
(iii) After 3rd Year
(iv) After 4th Year | 4 | EACH YEAR | 20,00,000 ₹80,00,000 Lowest |
| 4.00 | Operation and comprehensive maintenance of SCADA system including cost of upgradation, cost of spares for 04 years i.e. from 05th to 08th year post defect liability period of Phase-I, operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of data / information) complete. (Not to exceed 5% of item No -1)
Note :- Cumulative payment shall be made (after expiry of DLP) on not exceeding basis as per following schedule :-
(i) After 5th Year
(ii) After 6th Year Not to exceed 5% of item No 1
(iii) After 7th Year
(iv) After 8th Year | 4 | EACH YEAR | 20,00,000 ₹80,00,000 Lowest |
| 5.00PART - II ( Items required for addition/altration for SCADA system) | ||||
| 5.01 | Taking down carefully old sluice/Gate valves of size 50 mm complete all as specified and directed.
NOTE : Old removed Sluice valves deposited to E/M store yard. | 2 | EACH | 900 ₹1,800 Lowest |
| 5.02 | Taking down carefully old sluice/Gate valves of size 80 mm complete all as specified and directed.
NOTE : Old removed Sluice valves deposited to E/M store yard. | 2 | EACH | 1,000 ₹2,000 Lowest |
| 5.03 | Taking down carefully old sluice valves of size 100 mm complete all as specified and directed.
NOTE : Old removed Sluice valves deposited to E/M store yard. | 23 | EACH | 1,200 ₹27,600 Lowest |
Tender Value
₹9.3 Cr
EMD Value
₹7.9 L
Closing Date
25 Aug 2025, 6:00 pmClosed
CE SILIGURI ZONE
HQ CE SILIGURI ZONE, MES, SEVOKE ROAD, PO SALUGARA, DIST JALPAIGURI, PIN 734 008 (WB)
AUTOMATION AND UPGRADATION OF EXISTING WATER SUPPLY SYSTEM INCLUDING OUTSOURCING FOR MONITORING, MANAGEMENT AND OPERATION OF THE SAME AT BINNAGURI MIL STATION UNDER GE (S) BINNAGURI
2025_MES_693316_3
98797/BIN(S)/SZ/E8
Open Tender
Civil Works
Item Rate
3960 days
BINNAGURI
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,000
GE (S) BINNAGURI
₹7.9 L
Yes
7 Jan 2026
29 Jul 2025
1 Sept 2025
29 Jul 2025
25 Aug 2025
5 Aug 2025
29 Jul 2025 - 2 Aug 2025
Amount
PART-I Design, Develop, Integrate and Commissioning SCADA System alongwith controller system of existing DG sets for integration of SCADA system with existing DG sets and various analysing equipment for Water Supply System as indicated in the layout diagram enclosed and as per details attached at Table (Appendix 'F' to Particular Specification). The SCADA system shall comprise of following:- (a) Master Control station with personal computer with latest processor and monitor of suitable size. (b) UPS with half an hour backup (c) Laser Printer (d) Server (e) Data Gateway (f) SCADA software which can be operated, programmed and modified by agencies other than developer (g) PLC/Microprocessor Controllers with panel indoor/outdoor applications for water sensing display, pump oprations with RTU/without RTU or Microprocessor controller and microprocessor transmitter as required at site along with UPS of half an hour backup. (h) Suitable communication system including payment of bills to telecom service provider. Item Continued as 1.01 to 1.02
(j) Motorised butterfly valves as per site requirement direct/indirect type (k) Pressure transmitters (l) Ultrasonic sensors/ Radio frequency sensors (m) Flow meters and switches (n) Smart motor protection (o) Online residual Cholorine analyser (p) Ultrasonic Level Sensor (q) Turbidity, PH Transmitter & Sensors (r) Omini or Bi directional Parabolic antennas (s) PLC based MIMIC panel. (t) Fuel level Sensors (u) Temperature sensors for monitoring radiator (v) Low oil level pressure sensors (w) Any left out items/components required for complete the SCADA system. (x) Neccessory communication cable/control cable and power cables defferent size, any length and qty may be required for implementation of SCADA in pump houses/control station shall deemed to be included.
NOTES : (i) Design of Communication System shall be done by the bidder. Cloud based server/ data storage/ communication shall not be used and only local server based system shall be designed. (ii) The cost of each item shall also be attached to arrive at pricing in case of some addition/reduction at site. (iii) Operating system, system software and programming shall not be intellectual property of any agency. (iv) The memory in the hard disk shall be suitable for six months data. The backup storage device/devices shall be provided for archiving of data more than six months old. (v) In case of addition of installations, the system shall be capable of integrating the same. (vi) The responsibility of the agency is restricted to intimate mechanical and electrical failures such as failure of pumps, leakages etc. Such repairs shall be carried out by MES. (vii) Operation and maintenance charges of operation for two years of defect liability period and maint and operation including comprehensive maintenance for eight years after defect liability period shall be paid separately. (viii) The SCADA system should have provision of both manual and automatic operation of installations. (ix) Third party inspection of the whole scheme and SCADA system for ensuring satisfactory and smooth functioning of SCADA system shall be carried out by Central Govt approved agency / firm before issuing the completion certificate to the contractor.
Operate SCADA system during Defect Liability Period for two years after completion of work (Contractor to provide month wise breakdown details of data / information) including payment of bills by telecom service provider (not to exceed 4% of item No-1).
Operation and comprehensive maintenance of SCADA system including cost of upgradation, cost of spares for 04 years post defect liability period, operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of data / information) complete. (Not to exceed 4% of item No -1) Note :- Cumulative payment shall be made (after expiry of DLP) on not exceeding basis as per following schedule :- (i) After 1st Year (ii) After 2nd Year Not to exceed 4% of item No 1 (iii) After 3rd Year (iv) After 4th Year
Operation and comprehensive maintenance of SCADA system including cost of upgradation, cost of spares for 04 years i.e. from 05th to 08th year post defect liability period of Phase-I, operation including payment of bills by telecom service provider (Contractor to provide month-wise breakdown details of data / information) complete. (Not to exceed 5% of item No -1) Note :- Cumulative payment shall be made (after expiry of DLP) on not exceeding basis as per following schedule :- (i) After 5th Year (ii) After 6th Year Not to exceed 5% of item No 1 (iii) After 7th Year (iv) After 8th Year
PART - II ( Items required for addition/altration for SCADA system)
Taking down carefully old sluice/Gate valves of size 50 mm complete all as specified and directed. NOTE : Old removed Sluice valves deposited to E/M store yard.
Taking down carefully old sluice/Gate valves of size 80 mm complete all as specified and directed. NOTE : Old removed Sluice valves deposited to E/M store yard.
Taking down carefully old sluice valves of size 100 mm complete all as specified and directed. NOTE : Old removed Sluice valves deposited to E/M store yard.
Taking down carefully old sluice valves of size 150 mm complete all as specified and directed. NOTE : Old removed Sluice valves deposited to E/M store yard.
Taking down carefully old sluice valves of size 200 mm complete all as specified and directed. NOTE : Old removed Sluice valves deposited to E/M store yard.
Taking down carefully old sluice valves of size 250 mm complete all as specified and directed. NOTE : Old removed Sluice valves deposited to E/M store yard.
S & F DI pipe fittings Flanged/socketed type such as bend, reducer , socket, Tee etc of various size complete all as specified and directed.
M&L for masonary valve chamber of size 900x900x900 mm (Internal dimensions) including excavation and earth work in any type of soil and 100 mm thick PCC (1:4:8) type D2 foundation, brick work in cement mortar (1:6), plastering internal and external surface 15mm thick in cement mortar (1:4), PCC (1:3:6) type C1 (using 20mm graded crushed stone aggregate) coping, 50x50x6mm mild steel angle iron, 5 mm thick mild steel plate cover complete with locking arrangement painting steel and iron surfaces with synthetic enamel paint two coats over a coat of zinc chrome primer complete all as specified and directed.
M&L for masonary valve chember of size 1200x1200x1200 mm (Internal dimensions) including excavation and earth work in any type of soil and 100 mm thick PCC (1:4:8) type D2 foundation, brick work in cement mortar (1:6), plastering internal and external surface 15mm thick in cement mortar (1:4), PCC (1:3:6) type C1 (using 20mm graded stone aggregate) coping, 50x50x6mm mild steel angle iron, 5 mm thick mild steel plate cover complete with locking arrangement painting steel and iron surfaces with synthetic enamel paint two coats over a coat of zinc chrome primer complete all as specified and directed.
Supply and laying pipe ductile Iron ,Flanged/socketed type including specials (bend, socket, reducer ,rubber gasket, washer, nut/bolts etc) all as per IS:-8329 (2000) class K-7 of 200 mm dia and laying of pipe as per IS:-12288(1987) complete all as specified and directed.
Supply and laying pipe ductile Iron ,Flanged/socketed type including specials (bend, socket, reducer ,rubber gasket, washer, nut/bolts etc) all as per IS:-8329 (2000) class K-7 of 150 mm dia and laying of pipe as per IS:-12288(1987) complete all as specified and directed.
Supply and laying pipe ductile Iron ,Flanged/socketed type including specials (bend, socket, reducer ,rubber gasket, washer, nut/bolts etc) all as per IS:-8329 (2000) class K-7 of 100 mm dia and laying of pipe as per IS:-12288(1987) complete all as specified and directed.
Supply and laying pipe ductile Iron ,Flanged/socketed type including specials (bend, socket, reducer ,rubber gasket, washer, nut/bolts etc) all as per IS:-8329 (2000) class K-7 of 80 mm dia and laying of pipe as per IS:-12288(1987) complete all as specified and directed.
Refixing of sluice/Gate valves of size 50 mm complete all as specified and directed. NOTE : Sluice valves will be issue from E/M store yard.
Refixing of sluice/Gate valves of size 80 mm complete all as specified and directed. NOTE : Sluice valves will be issue from E/M store yard.
Refixing of sluice valves of size 100 mm complete all as specified and directed. NOTE : Sluice valves will be issue from E/M store yard.
Refixing of sluice valves of size 150 mm complete all as specified and directed. NOTE : Sluice valves will be issue from E/M store yard.
Refixing of sluice valves of size 200 mm complete all as specified and directed. NOTE : Sluice valves will be issue from E/M store yard.
Refixing of sluice valves of size 250 mm complete all as specified and directed. NOTE : Sluice valves will be issue from E/M store yard.
Excavation in trenches in soft / loose soil not exceeding 1.5 meter wide and not exceeding 1.5 meter deep in soft / loose soil for laying of pipe line and getting out complete all as specified and directed.
Returning, filling in including spreading, levelling, watering and well ramming in layer not exceeding 25 cm thick after laying and testing of pipes complete all as specified and directed.
Removing excavated material to a distance not exceeding 50 meter and depositing where directed at a level not exceeding 1.5 meter above the starting point complete all as specified and directed.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_809521.xls
BOQ • 0.32 MB
Complete_Tender_Except_BOQ.pdf
BOQ • 5.82 MB
176942822.pdf
Tender Documents • 0.19 MB
176942826.html
Tender Documents • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .