| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical JAGANNATHPOSH HAMIRPUR PANCHAMAHALA SUBDEGA SUNDARGARH | MALKANGIRI | ODISHA | 764044 | Accepted-Technical Qualified |
| 3 | Accepted-Technical R O WARD NO 2 PO PS SUNDARGARH DIST SUNDARGARH ODISHA PIN 770001 | SUNDARGARH | SUNDARGARH | ODISHA | 770001 | Accepted-Technical Qualified |
| 4 | Accepted-Technical | Accepted-Technical Qualified |
| 5 | Accepted-Technical | Accepted-Technical Qualified |
Tender Value
₹1.7 Cr
EMD Value
₹1.7 L
Closing Date
24 Jul 2026, 5:00 pmClosed
Circle Officer
RURAL WORKS CIRCLE, SUNDARGARH
Construction of 4 nos E type quarter buildings at RW division colony Sundargarh for the year 2024-25
2026_CERWI_135408_1
RWCCESNG-12 of 2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
365 days
Sundergarh
3 documents required · 3 mandatory
₹10,000
₹1.7 L
Yes
17 Sept 2026
10 Jul 2026
27 Jul 2026
10 Jul 2026
24 Jul 2026
10 Jul 2026
10 Jul 2026 - 23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for foundation of in hard soil including dressing and leveling the bed fit for laying concrete and deposited the excavated materials away from work site etc complete. | 633.72 | cum | 311.5 | ₹1,97,403.78 |
| 3 | Filling Foundation & Plinth with sand watered and rammed including cost of sand, conveyance of material, labour, T & P etc. complete. | 765.45 | cum | 607.2 | ₹4,64,781.24 |
| 5 | Cement concrete (1:3:6) using 40mm and down gradedhard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. | 161 | cum | 6,680.6 | ₹10,75,576.6 |
| 7 | Cement concrete (1:2:4) using 12mm hard granite crusher broken metal including all cost , carriage, royality, taxes, and all labour involved for completion of item of work as per the direction of Engineer- in - charge. | 7.88 | cum | 8,273.3 | ₹65,193.6 |
| 9 | R.C.C work with R.C.C M-25 using 20mm downgraded size hard granite chips of approved quality from approved quarry having a minimum comprresive strength (in work test) 25 kg/Cm2 in 15 cm cubes at 28 days after mixing and test conducted including hoisting,lowering laying and compacting concrete by using vibrator with watering and curing for 28 days centering and shuttering and finishing the exposed surface smooth providing grooves or beds whereever necessay including cost conveyance,royalties and all taxes of all materials and cost of all labour with T&P required for the work etc.complete in all respect but excluding cost of M.S.Rods or Tor Steel and binding wires and labour charge for bending binding and tying the grills etc.complete in all respect as per direction of Engineer-in-charge. | 0.01 | cum | 0.01 | ₹0 |
| 10 | Column Base- | 122.58 | cum | 7,470.9 | ₹9,15,782.92 |
| 11 | Column and Beam- | 90.35 | sqm | 16,853.7 | ₹15,22,731.8 |
| 12 | Plinth Band- | 20.41 | cum | 8,345.3 | ₹1,70,327.57 |
| 13 | Lintel- | 4.38 | cum | 15,184.6 | ₹66,508.55 |
| 14 | Roof Slab- | 59.57 | cum | 14,788 | ₹8,80,921.16 |
stage.html
html • 0.12 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 4.32 MB
Tendernotice_1.pdf
PDF • 0.45 MB
BOQ_601013.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .