| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC EDAKKANDY MANNIL AVALA P O KOYILANDI TALUK KOZHIKODE DISTRICT | KOZHIKODE | KERALA | 612906 | ₹10.6 L | L1 | Accepted-AOC accepted via resolution no 1(1) dtd 29/08/25 |
| 2 | L2₹10.6 LRejected-AOC AVALA THIRUVALLUR GRAMA PANCHAYATH | ₹10.6 L | L2 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | KAREEM M L1 | KUNHAMMAD E M L2 |
|---|---|---|---|---|---|
| 1.00ROAD TARRING | |||||
| 1.00 | 3.15.1:Compacting Original Ground (i) Compacting original ground supporting embankment Loosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. | 105.75 | cum | 15.04 ₹1,590.48 | 15.04 ₹1,590.48 |
| 1.00 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) (A) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material | 68.5 | cum | 3,124.47 ₹2.1 L | 3,124.47 ₹2.1 L |
| 1.00 | 4.9:Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. By Mechanical Means with 1 km lead | 105.75 | cum | 3,504.6 ₹3.7 L | 3,504.6 ₹3.7 L |
| 1.00 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen Rates Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 | 705 | sqm | 80.21 ₹56,548.05 | 80.21 ₹56,548.05 |
| 1.00 | 75.5.2.3pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 705 | sqm | 18.76 ₹13,225.80 | 18.76 ₹13,225.80 |
| 1.01 | 75.5.2.2pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 360 | sqm | 18.76 ₹6,753.60 | 18.76 ₹6,753.60 |
| 1.01 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 34.82 | sqm | 309.77 ₹10,786.19 | 400 ₹13,928 |
| 1.01 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 1,065 | sqm | 291.87 ₹3.1 L | 291.87 ₹3.1 L |
| 1.01 | 75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 8.4 | cum | 8,917.26 ₹74,904.98 | 8,917.26 ₹74,904.98 |
Tender Value
₹10.6 L
EMD Value
₹26,482
Closing Date
22 Aug 2025, 4:00 pmClosed
Assistant Engineer
OFFICE OF THE ASSISTANT ENGINEER, LIDEW VELOM GP
THACHARKANDIMUKKU - SUBCENTREROAD
2025_LSGD_785788_2
31/TENDER/2025/AE/LIDEW/VELOM
Open Tender
Civil Works - Roads
240 days
VELOM GRAMA PANCHAYATH
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹26,482
Yes
8 Apr 2026
13 Aug 2025
25 Aug 2025
13 Aug 2025
22 Aug 2025
13 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1291788.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.02 MB
Tendernotice_3.pdf
PDF • 0.02 MB
BOQ_1291788.xls
BOQ • 0.30 MB
a.pdf
Additional Documents • 0.11 MB
f.pdf
Tender Documents • 0.01 MB
p.pdf
Tender Documents • 0.12 MB
s.pdf
Tender Documents • 1.79 MB
Download all tender documents and submit your bid