| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹16.0 L+₹2.5 L (18.2%)Rejected-AOC | L2 | Rejected-AOC 2nd Lowest |
Tender Value
₹16.9 L
EMD Value
₹42,365
Closing Date
2 Feb 2023, 5:00 pmClosed
Executive Engineer
Idamalayar Irrigation Division No1 Angamaly
Rectification Works to Prevent Leakage and Providing Side protection wall
2023_Irrig_551135_1
7/ET/EE/IIP/2022-23/S
Open Tender
Civil Works - Canal
Item Rate
180 days
Angamaly
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹42,365
Yes
15 Mar 2023
24 Jan 2023
4 Feb 2023
24 Jan 2023
2 Feb 2023
24 Jan 2023
Amount
1 Side Protection Wall (Left Bank of Canal)
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
2Appendix B-Canal lining
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
Eldho Varghese
Bidder Name
Shaji Varghese
Eldho Varghese
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_808438.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .