Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹24.6 L
EMD Value
₹49,200
Closing Date
28 Nov 2026, 2:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
The Executive Engineer,Howrah Division,PHE Dte.
43 N.S. ROAD, SUSAMA MANSION (4th Floor) , HOWRAH - 711101
Restoration of Pump House, Boundary Wall for security purposes and Land Development belongs to Flood prone area at Head Work and 2nd Tube Well site for Kumirmora W/S scheme at Udaynarayanpur Block under Howrah Division, P.H.E. Dte.
2026_PHED_5084056_3
WBPHED/EE/HD/NIeT-17 OF 2026-27
Open Tender
CIVIL WORKS
Fixed-rate
45 days
Howrah
Please refer Tender documents.
7 documents required · 7 mandatory
₹49,200
5 Nov 2026
5 Nov 2026
30 Nov 2026
5 Nov 2026
28 Nov 2026
5 Nov 2026
180 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing compound premises of shurbs, plants, jungles etc. by cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared) | - | Sqm. | 11 | - |
| 2 | Earth work execavation of foundation trnches in all sorts of soil (including mixed soil but excluding laterite and sand stone) including removing spreading or stacking the spoils within a lead of 75mtr as directed and including rimming the sides of trenche bottom bailing out pumping out, water etc as required complete.
a) Depth of excavation not exceeding 1.5m, shoring not required. | - | cum | 119.27 | - |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. (including plinth protection) | - | sqm | 357 | - |
| 4 | Earth work filling in foundation trenches or plinth with good earth in layers not exceeding 15 cm including watering and ramming etc layer by layer complete. (a) With earth obtained from excavation of foundation. | - | cum | 77.54 | - |
| 5 | Earth work in filling in compound, tank, low land, ditches etc. with good earth, in layers not exceeding 150 mm. including breaking clods and consolidating the same by ramming and dressing complete. (Payment will be made on profile measurement before and after the work). (b)(i) With carried earth arranged by the contractor within a radius of 3 km. including cost of carried earth. | 320 | cum | 379.82 | ₹1,21,542.4 |
| 6 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | - | cum | 711.81 | - |
| 7 | (I) Cement concrete with graded stone ballast (40 mm size excluding
shuttering) In ground floor (A) [Pakur Variety] (a) 1:3:6 proportion | - | cum | 4,912 | - |
| 8 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
a) Pakur Variety. | - | cum | 6,046.83 | - |
| 9 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a)For works in foundation, basement and upto roof of ground floor/upto 4m.(i) Tor steel/Mild steel. Other than SAIL/TATA/RINL | - | MT | 84,015.38 | - |
| 10 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works(upto roof of ground floor). Above 30 mm & upto 37 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. | - | sqm | 347 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
WBF2911.pdf
Tender Documents • 0.50 MB
BOQ_5203422.xls
BOQ • 0.34 MB
ImportantDocuments.pdf
Tender Documents • 0.15 MB
SpecificationConstBuilding.pdf
Tender Documents • 0.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .