| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹1.7 LAccepted-AOC SREENILAYAM MANNADI P O | IDUKKI | KERALA | 685501 | ₹1.7 L | l1 | Accepted-AOC L1 |
Tender Value
₹1.8 L
EMD Value
₹4,449
Closing Date
10 Oct 2025, 5:00 pmClosed
Assistant Executive Engineer
KIP O and M Sub Division No 1 Adoor
GENERAL Annual Maintenance 2025 26 KIP O and M Annual maintanence of canals 2025 2026 Jungle clearence and removal of floating bodies during water distribution from Enathu III distributory between ch 0 m to 2824 m and its 9 field boothies General C
2025_Irrig_799006_2
IRR/PII/TR/2713/2025_5_4_3/1
Open Tender
Civil Works - Canal
180 days
ENATH
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹4,449
Yes
7 Jan 2026
27 Sept 2025
13 Oct 2025
27 Sept 2025
10 Oct 2025
27 Sept 2025
Amount
Annual maintanence of Enath III distributory and its field boothies
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
OD17917/2025-2026:Engaging coolie for removing floating bodies and other vegetations from canals and deposited silt from canal bed , construction of temporary bunds across canals for control and regulate the flow of water and for greasing of shutters etc complete during water distribution period as per the departmental officers at site.
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
Bidder Name
R.Rajendran Pillai
stage.html
html • 0.02 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1335461.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid