Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | L1 | Accepted-AOC L1 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
23 Feb 2024, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P AND P) CD
Repair and Refixing of Melting, Mixing and Pre-coat pit coils in SA Plant, FACT CD.
2024_FACT_793130_1
04097/2023-2024/E28876
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM105B).
4 documents required · 4 mandatory
₹0
₹5,000
Yes
15 Mar 2024
1 Feb 2024
24 Feb 2024
1 Feb 2024
23 Feb 2024
1 Feb 2024
Repair & Refixing of Melting, Mixing and Pre-coat pit coils in SA Plant, FACT- CD.
Repair & Refixing of Melting, Mixing and Pre-coat pit coils in Sulphuric Acid Plant: Work Involves: Collect the required material/tools and tackles from store/workshop. Lift and remove leaky coils from the pit after isolating the coils and providing equivalent quantity of blind flanges.Clean the coil/s, remove muck and other solid particles from the coil/s to identify the leak. Identification of leak comes under the scope of the contractor and shall be done in the presence of competent personnel from Process department. Once the leaks are identified they shall be rectified by preparing the spot necessarily by grinding, followed by welding using proper electrodes. Pressure test the coil with 8 ATA steam to the satisfaction of Process department and Engineer-in-Charge. Once the repair is complete, erect the coil back,with proper gasketting wherever necessary. Any rework on the coil pieces, like the correction of length involving cutting and welding on the existing coil/providing additional spool piece shall be done as per instructions from Engineer-in-Charge and will be under contractor's scope. The site shall be cleared from scrap and transport the scrap to area earmarked/scrap yard
Replacing of Melting, Mixing and Pre-coat pit coils in Sulphuric Acid Plant: If coils are found to be replaced with new coil, the coil used to be collected from the store and transport it to the site. Collection of coil/s, transportation of the same and preparation of steam inlet and outlet connections for the new coils falls under the scope of the contractor. Servicing and replacing of Steam trap, valve, fittings etc., are also to be done by the contractor. Cutting and reducing the overall height of the coil if required to suit the pit condition shall be done by the contractor after consultation with th Engineer-in-Charge. The erected coils shall be pressure tested using 8 ATA steam to the satisfaction of Process department and Engineer-in-Charge.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_833611.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .