| Sl No | Description | Qty | Unit | KP Nazar L1 | mazearc engineers L2 |
|---|---|---|---|---|---|
| 1.00 | Removing the existing filter media carefully lifting, conveying without making any damages to the existing structure and stacking the different sizes of sand and gravel separately within a lead of 200M and including tackles, all labour charges, hire for tools, scaffolding charges, all safety precautions etc., complete.
1.1) Sand | 46.87 | Cu.M | 1,475 ₹69,133.25 Lowest | 1,600 ₹74,992 |
| 1.20 | Gravel | 30.14 | Cu.M | 1,475 ₹44,456.5 Lowest | 1,590 ₹47,922.6 |
| 2.00 | Sieving after washing removal of dirt drying perfectly and separating coarse gravel of 15mm x6mm, 35mm x 15 and 50 x 35mm and again washing and cleaning them and separately stacking for reuse, including hire for tools, plants, all labour chrges, all safety precautions etc., complete. | 23.44 | Cu.M | 1,475 ₹34,574 Lowest | 1,540 ₹36,097.6 |
| 3.00 | Supplying, cleaning filter media of approved quality and sizes, hard and clean, free from clay, dust and other impurities, stacking the same near the Water Treatment Plants and sieve test report shall be produced for each materials,including cost of all materials, labour charges, conveyance charges, all safety precautions etc., complete.
3.1) Fine sand 0.60mm | 46.87 | Cu.M | 12,000 ₹5,62,440 Lowest | 14,100 ₹6,60,867 |
| 3.20 | Fine gravel 10mm x 3mm | 6.7 | Cu.M | 11,500 ₹77,050 Lowest | 12,990 ₹87,033 |
| 3.30 | Medium gravel 15mm x 6mm | 4 | Cu.M | 8,000 ₹32,000 Lowest | 10,910 ₹43,640 |
| 3.40 | Coarse gravel 35mm x 15mm size | 2 | Cu. M | 8,000 ₹16,000 Lowest | 9,910 ₹19,820 |
| 3.50 | Very coarse (rounded pebbles) 50mm x 35mm | 2 | Cu. M | 8,000 ₹16,000 Lowest | 9,910 ₹19,820 |
| 4.00 | Washing and cleaning thoroughly the inside of filter shell with wire brush or coir brush, suitable scrubbers and water, including all labour charges, hire for tools, including suitable scrubbers, scaffolding charges, all safety precautions etc., complete. | 510 | Sq.M | 45 ₹22,950 | 41 ₹20,910 Lowest |
| 5.00 | Chipping and removing all loose/damaged portions of cement plastering/ concrete surfaces, washing thoroughly with water and re-plastering with cement mortar 1:4, 12mm thick with a neat cement flushing coat, including cost of all materials, labour charges, hire for tools and scaffolding, curing etc., complete. (Required cement will be issued free of cost by TCC) | 20 | Sq.M | 65 ₹1,300 | 61 ₹1,220 Lowest |
Tender Value
Refer Docs
EMD Value
₹32,000
Closing Date
28 Jul 2026, 2:00 pmClosed
AGMMT
TCCL UDYOGAMANDAL PO KOCHI
Replacement of filter media and maintenance works to Filter No.3 in Water Treatment Plant
2026_TCCL_855882_1
TCCL/WC/C/1103/2026
Open Tender
Civil Works - Others
Item Rate
365 days
THE TRAVANCORE COCHIN CHEMICALS LTD
Please refer Tender documents
7 documents required · 7 mandatory
₹1,000
Yes
₹32,000
Yes
19 Aug 2026
16 Jun 2026
29 Jul 2026
16 Jun 2026
28 Jul 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing the existing filter media carefully lifting, conveying without making any damages to the existing structure and stacking the different sizes of sand and gravel separately within a lead of 200M and including tackles, all labour charges, hire for tools, scaffolding charges, all safety precautions etc., complete.
1.1) Sand | 46.87 | Cu.M | 100 | ₹4,687 |
| 1.2 | Gravel | 30.14 | Cu.M | 10 | ₹301.4 |
| 2 | Sieving after washing removal of dirt drying perfectly and separating coarse gravel of 15mm x6mm, 35mm x 15 and 50 x 35mm and again washing and cleaning them and separately stacking for reuse, including hire for tools, plants, all labour chrges, all safety precautions etc., complete. | 23.44 | Cu.M | 10 | ₹234.4 |
| 3 | Supplying, cleaning filter media of approved quality and sizes, hard and clean, free from clay, dust and other impurities, stacking the same near the Water Treatment Plants and sieve test report shall be produced for each materials,including cost of all materials, labour charges, conveyance charges, all safety precautions etc., complete.
3.1) Fine sand 0.60mm | 46.87 | Cu.M | 10 | ₹468.7 |
| 3.2 | Fine gravel 10mm x 3mm | 6.7 | Cu.M | 10 | ₹67 |
| 3.3 | Medium gravel 15mm x 6mm | 4 | Cu.M | 10 | ₹40 |
| 3.4 | Coarse gravel 35mm x 15mm size | 2 | Cu. M | 10 | ₹20 |
| 3.5 | Very coarse (rounded pebbles) 50mm x 35mm | 2 | Cu. M | 10 | ₹20 |
| 4 | Washing and cleaning thoroughly the inside of filter shell with wire brush or coir brush, suitable scrubbers and water, including all labour charges, hire for tools, including suitable scrubbers, scaffolding charges, all safety precautions etc., complete. | 510 | Sq.M | 10 | ₹5,100 |
| 5 | Chipping and removing all loose/damaged portions of cement plastering/ concrete surfaces, washing thoroughly with water and re-plastering with cement mortar 1:4, 12mm thick with a neat cement flushing coat, including cost of all materials, labour charges, hire for tools and scaffolding, curing etc., complete. (Required cement will be issued free of cost by TCC) | 20 | Sq.M | 100 | ₹2,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
WCC1103WTP.pdf
Tender Documents • 1.15 MB
BOQ_1446630.xls
BOQ • 0.23 MB
1103CORR3.pdf
PDF • 0.55 MB
1103CorrigendumWTP2.pdf
PDF • 0.55 MB
1103WTP.pdf
PDF • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].