Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.8 LAccepted-AOC | L1 | Accepted-AOC Lowest reasonable tenderer | |
| 2 | L2₹18.3 L+₹54,750 (3.08%)Rejected-Finance | L2 | Rejected-Finance Not Lowest tenderer | |
| 3 | L3₹18.8 L+₹1.1 L (6.01%)Rejected-Finance 22 1755A KANNANKATTU TEMPLE ROAD EDAKOCHI KOCHI 682010 ERNAKULAM KERALA 682010 | ERNAKULAM | KERALA | 682010 | L3 | Rejected-Finance Not Lowest tenderer | |
| 4 | L4₹19.7 L+₹1.9 L (10.9%)Rejected-Finance | L4 | Rejected-Finance Not Lowest tenderer | |
| 5 | L5₹20.5 L+₹2.7 L (15.3%)Rejected-Finance | L5 | Rejected-Finance Not Lowest tenderer |
Tender Value
Refer Docs
EMD Value
₹38,560
Closing Date
29 May 2021, 6:00 pmClosed
GE Ranikhet
GE Ranikhet
Provn of Gas pipe line oxygen compressed air of medical grade in covid 19 ICU at MH ranikhet under GE Ranikhet
2021_MES_443672_1
GE/RKT/06 OF 2021-2022
Limited
Electrical and Maintenance Works
Item Rate
30 days
Ranikhet under GE Ranikhet
Class E cat b (i)
6 documents required · 6 mandatory
₹500
Yes
GE Ranikhet
₹38,560
Yes
2 Jun 2021
18 May 2021
31 May 2021
18 May 2021
29 May 2021
24 May 2021
Amount
BOQ ( Sch A ) Oxygen Gas pipeline works Supply and fixing of point wiring for one 6 pin socket outlet, 16 Amp (independent point), controlled by one, one way switch with 2.50 sqmm size PVC insulated unsheathed 1100 volts grade single core (multi-stranded) copper conductor cable (FRLS) drawn into and including medium grade PVC casing caping /PVC conduit concealed (not less than 20 mm dia) all necessary fittings and accessories fixed concealed (including chase cutting in brick/stone masonery wall for fixing conduit and plastering the external surfaces and matching the same with existing suface) and sunk cast iron or pressed steel terminal boxes for mounting fitting like switches, sockets, lamp holders, sketch fittings and covered with 3 mm thick plastic laminated bakelite sheet cover fixed with brass screws and cup washers including one continuous run of PVC insulated (green colour) 2.50 sqmm size copper conductor cable as in earth wire and connected to common earth dolly complete all as specified and directed. (Note:- wiring shall be in done in colour coding as directed by Engineer in charge )
Supply and fixing of switch piano flush type single pole one-way 15 Amp complete all as specified and directed.
Supply and fixing of socket outlet two-in-one, 3 pin each suitable for 5 and 15 Amp flush type, complete all as specified and directed.
Supply, fixing, testing and commissioning Fully Automatic Oxygen Control Panel: Automatic control panel should be constructed in accordance with the requirement of international standards. The fully automatic oxygen control panel should comply with HTM 02-01/DIN/EN/ISO. It should be European CE Certified body 0482 with 1000 LPM and should meet with the provisions of Council Directive 93/42/EEC concerning Medical Devices Directive. The manifold assembly should provide two stages of pressure regulation. A single stage primary regulator, one for each cylinder bank should be used to initially reduce cylinder pressure and two single stage pressure regulators should be provided in the control cabinet for final delivery pressure regulation. One delivery pressure regulator in service and one should be ready for service in a standby mode. The Manifold control panel should be digital, fully automatic type and switches from “Bank in Use” to “Reserve bank “ without fluctuation in delivery supply line pressure. 01 Each 155,000.0 0 155,000.00Changeover should be performed by electrically/pneumatically operated valves contained in the control cabinet. In the event of an electrical power failure the valves should automatically open to provide an uninterrupted gas flow. It should be 100% automatic and should not require manual adjustment. red LEDs to indicate depleted cylinders, one for each supply bank x 2Nos All components inside the Control Panel like Pressure Regulators, piping and control switching equipment should be cleaned for Oxygen Service and installed inside the cabinet to minimize tampering with the regulators or switch settings. The Control Panel shall include two pressure relief valves, one high pressure approx.200psi and one low pressure approx.75 psi. The heavy duty control panel should be provided with a flow capacity of 1000 LPM at 50 to 60 psi complete all as specified and directed . (CERTIFIED :- 18-04-57) ( MAKE MEDICAL GASES SYSTEM, BALA JI, KRISHNA SURGICAL and MN LIFE CARE) Note: Material shall be purchase from authorised dealers or directly from company. Purchase voucher and all test certificate shall be produced to Engineer-in-charge before execution of work
Supply, fixing, testing and commissioning Copper Piping size of Copper pipe 28mm. D×0.9mm.thick , all copper pipes would be solid drawn ,seamless ,deoxidized , non arsenical , half hard , tempered and degreased materials conforming to BS:EN :13348:2001+A1 :2005 Pipe size would be used as under: Copper Fittings : Fitting would be made of copper and suitable for a stem of working pressure of 17 bar and would confirm to BS 864 with specially made for brazed socket type connections complete all as specified and directed . (CERTIFIED :- 18-04-57) (Make Metal Alloys , Mex Flow)
Supply, fixing, testing and commissioning Copper Piping size of Copper pipe 22mm. D×0.9mm.thick , all copper pipes would be solid drawn ,seamless ,deoxidized , non arsenical , half hard , tempered and degreased materials conforming to BS:EN :13348:2001+A1 :2005 Pipe size would be used as under: Copper Fittings : Fitting would be made of copper and suitable for a stem of working pressure of 17 bar and would confirm to BS 864 with specially made for brazed socket type connections complete all as specified and directed . (CERTIFIED :- 18-04-57) (Make Metal Alloys , Mex Flow)
Supply, fixing, testing and commissioning Copper Piping size of Copper pipe 15mm.D×0.9mm.thick, all copper pipes would be solid drawn ,seamless ,deoxidized , non arsenical , half hard , tempered and degreased materials conforming to BS:EN :13348:2001+A1 :2005 Pipe size would be used as under: Copper Fittings : Fitting would be made of copper and suitable for a stem of working pressure of 17 bar and would confirm to BS 864 with specially made for brazed socket type connections complete all as specified and directed . (CERTIFIED :- 18-04-57) (Make Metal Alloys , Mex Flow)
Supply, fixing, testing and commissioning OXYGEN GAS OUTLET POINT Would have terminated properly Double locking Front Loaded which have a parking facility which also avoids interchanging of outlet and Keys (Gas specific probes) Gases complete all as specified and directed . Oxygen/Nitrous Oxide/ Carbon Di-Oxide/Med Air 4Bar/Surgical Air 7 Bar/Vacuum (MAKE MEDICAL GASES SYSTEM, KRISHNA SURGICAL, Oasis Medical , Amico and MN Life care) complete all as specified and directed . Note: Material shall be purchased from authorised dealers or directly from company. Purchase voucher and all test certificate shall be produced to Engineer-in-charge before execution of work
Supply, fixing, testing and commissioning BPC Oxygen Flow Meter with Humidifier Bottle: Flow meter would be Backpressure Compensated. Flow meter would be accurate gas flow measurement and control within range of 0-15 liters per minute. It would meet strict precision and durability standards. Flow Meter body would be made of brass material. Flow tube and shroud components would be made of clear impact resistant polycarbonate. The humidifier bottle would be unbreakable polycarbonate. Material and auto cleavable at 134 degrees centigrade. The humidifier would have built in safety valve complete all as specified and directed. (CERTIFIED :- 18-04-57) (MAKE MEDICAL GASES SYSTEM: , KRISHNA SURGICAL, and MN Life care) complete all as specified and directed . Note: Material shall be purchased from authorised dealers or directly from company. Purchase voucher and all test certificate shall be produced to Engineer-in-charge before execution of work
Supply, fixing, testing and commissioning Isolation Valves 28mm, Leak Class Would be 900 turn, ball valves of brass body, duly chrome plated on the outer periphery , SS ball with high quality Teflon seated, connected to pipeline with brass ferrule for easy maintenance. lD of the copper pipe and the ball valve would have same dimensions to avoid the flow friction complete all as specified and directed. (CERTIFIED :- 18-04-57) (MAKE ZOLOTO, RN , JSI )
Supply, fixing, testing and commissioning Isolation Valves 22mm Leak Class Would be 900 turn, ball valves of brass body, duly chrome plated on the outer periphery , SS ball with high quality Teflon seated, connected to pipeline with brass ferrule for easy maintenance. lD of the copper pipe and the ball valve would have same dimensions to avoid the flow friction complete all as specified and directed. (CERTIFIED :- 18-04-57) (MAKE ZOLOTO, RN , JSI )
Supply, fixing, testing and commissioning Isolation Valves 15mm Leak Class Would be 900 turn, ball valves of brass body, duly chrome plated on the outer periphery , SS ball with high quality Teflon seated, connected to pipeline with brass ferrule for easy maintenance. lD of the copper pipe and the ball valve would have same dimensions to avoid the flow friction complete all as specified and directed. (CERTIFIED :- 18-04-57) (MAKE ZOLOTO, RN , JSI )
Supply, fixing, testing and commissioning Zonal Valve Boxor One Gas Services, An Zonal area valve box would have of specification . Wall mounted M.S box with powder coated & lockable . Front glass mounting easily visible & using imported brass body quarter turn ball valves Using for opening & closing position. The valve box door cannot be close during valve closing position complete all as specified and directed. (CERTIFIED :- 18-04-57) (MAKE : MEDICAL GASES SYSTEM ,KRISHNA SURGICAL, MN LIFE CARE)
Supply, fixing, testing and commissioning Area Alarm for (One Gas)Service , Area gas alarm panel six lines , would audio –Visual alarms for each gas used on the floor and come fitted with test and mute button .Running on electricity 220 V ,these units are suggested to be fitted on each floor as well as areas of heavy usage. it would be fitted with a pressure gauge. It indicates low ,medium & high pressure sensors complete all as specified and directed. (MAKE MEDICAL GASES SYSTEM, KRISHNA SURGICAL, and MN Life care) (CERTIFIED :- 18-04-57)
Supply, fixing, testing and commissioning Bed Headed panel and Double Railing. 4 feet Efficient, Safe & Robust design in extruded aluminum section. Smooth curved surfaces, and choice of base color and fascia plates. Unit should have integrated rail system to mount accessories The headwall system should be constructed of aluminum extrusions joined together to form a carcass to suit the particular application. Unit should be factory assembled for electrical and mechanical components. Segregation of services i.e. Low voltage supplies, High Voltage supply and Medical gases should be maintained throughout. Bed space management system with optional equipment rail. With all Equipment Rail mount Accessories. All down drops should be installed at one end preferably & Vertical drop installed at one end should be covered with Aluminum boxing with matching color. Each bedhead unit shall be supplied with electrical and electrical outlets prefitted, wired and certified. (wired up to the distribution box provided with leakage protection) Facility per unit as under: 1 IV Stand 2 Monitor Stand Wall mounted. 3 Ward Vacuum unit clip . 4 Two duplex × 230 V5/15Amp.Electrical Sockets provision Gas/ Vacuum outlets as follows:- Two/ one oxygen outlet . One vacuum outlet . One compressed Air outlet 4Bar complete all as specified and directed. (CERTIFIED :- 18-04-57) ( MAKE MEDICAL GASES SYSTEM: , BALA JI, KRISHNA SURGICAL and MN Life care)
Supply, fixing, testing and commissioning OXYGEN MANIFOLD SYSTEM, Manifold shall consist of two high pressure header bar assemblies to facilitate connection of 32 nos of primary which will be the primary (main) supply source and 8 nos of secondary cylinder supplies which will be the Emergency supply source. The number of cylinder in each bank shall able to feed the Hospital consumption for a day along with 32 nos. of primary and 4 nos. of secondary cylinder in each bank for emergency. Each header bar shall be provided with 32 numbers of cylinder pigtail connections to suit cylinder valves as per IS.3224 incorporating a check valve at the header connection. The high-pressure header bar shall be designed in such a manner that it can be extended to facilitate additional cylinder connections. Each header bar assembly shall be provided with a high pressure shut off valve. Oxygen Manifold should consist of 2 rows of 16 no of class D?type bulk oxygen cylinders (1 Set) and 2 rows of 4 no of class D- type bulk oxygen cylinders for emergency. The manifold should be so designed that it shall suit easy cylinder changing and positioning. The system should have non – return valves for easy changing of cylinders without closing the bank along with individual cylinder valve and pressure relief valve. The cylinder should be placed with the help of cylinder brackets and fixing chains which should be galvanized complete all as specified and directed . (CERTIFIED :- 18-04-57) (MAKE : MEDICAL GASES SYSTEM , KRISHNA SURGICAL and MN Life care Note: Material should be purchased from authorised dealers or directly from company and purchased voucher and all test certificate should be produced to engr-in-charge before execution of work
D type oxygen cylinder 7000 kv ltr of oxygen at 145kg/sqcm all as per OEM
6+6 Oxygen Cylinder Manifold
Emergency set for three cylinder (without cylinder)
kumar automobiles
Sanjay Traders
Amit Engineering
R P G ELECTRONIC REGD
aditya construction
S S CONSTRUCTION CO
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .