| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹79.8 LAccepted-Finance | ₹79.8 L | L-1 | Accepted-Finance Accepted |
| 2 | L-2₹42.5 L−₹37.3 L (46.7%)Accepted-Finance S 117 PANDAV NAGAR DELHI 110092 | SHAHDARA | DELHI | 110092 | ₹42.5 L−₹37.3 L (46.7%) | L-2 | Accepted-Finance Accepted |
| 3 | L-3₹84.8 L+₹5.0 L (6.26%)Accepted-Finance | ₹84.8 L+₹5.0 L (6.26%) | L-3 | Accepted-Finance Accepted |
| 4 | L-4₹98.2 L+₹18.4 L (23.1%)Accepted-Finance E 2 124 SECTOR 11 ROHINI NEW DELHI 110085 | NORTH WEST | DELHI | 110085 | ₹98.2 L+₹18.4 L (23.1%) | L-4 | Accepted-Finance Accepted |
| 5 | L-5₹1.0 Cr+₹20.8 L (26.1%)Accepted-Finance 1849 JUGRAJPUR SACHENDI KANPUR KANPUR NAGAR UTTAR PRADESH 208023 UDYAM UP 43 0012110 | KANPUR NAGAR | UTTAR PRADESH | 208023 | ₹1.0 Cr+₹20.8 L (26.1%) | L-5 | Accepted-Finance Accepted |
Tender Value
₹1.3 Cr
EMD Value
₹2.5 L
Closing Date
24 Jul 2026, 3:00 pmClosed
Executive Engineer, PWD, SER-1, New Delhi
O/o Executive Engineer, PWD, SER-1, New Delhi-110065
(SH - Improvement of repair / renovation and other Miscellaneous work at Shiv Kuttiya Mandir Community Centre, Hari Nagar Ashram and under Nehru Nagar ROB).
2026_PWD_295543_1
64/EE/SER-1/PWD/2026-27
Open Tender
Civil Works
Percentage
90 days
Assistant Engineer, SER-13
As per NIT
15 documents required · 15 mandatory
₹0
₹2.5 L
4 Aug 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 263 | Cum | 260.3 | ₹68,458.9 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 42 | Cum | 196 | ₹8,232 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 14 | Cum | 7,878.5 | ₹1,10,299 |
| 4Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; without pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering and finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.. All works upto plinth level : | |||||
| 4.1 | Concrete of M10 grade with minimum cement content of 220 kg /cum | 209 | Cum | 8,479.5 | ₹17,72,215.5 |
| 4.2 | Concrete of M25 grade with minimum cement content of 300 kg /cum | 303 | Cum | 9,083.4 | ₹27,52,270.2 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,890 | Kg | 107.85 | ₹2,03,836.5 |
| 6 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete.
Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.
All works upto plinth level
Concrete of M25 grade with minimum cement content of 330 kg /cum | 21 | Cum | 9,149.1 | ₹1,92,131.1 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:
Cement mortar 1:6 (1 cement : 6 coarse sand) | 174 | Cum | 7,132.25 | ₹12,41,011.5 |
| 8 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approvedmake, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. | 131 | Sqm | 1,267.95 | ₹1,66,101.45 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.83 MB
BOQ_393205.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .