Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 8 C 1 SECTOR NO 21 MIHAN AREA NAGPUR | NAGPUR | NAGPUR | MAHARASHTRA | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
Closing Date
8 Aug 2026, 3:00 pmClosed
Regional Officer, MorRTH Raipur
Regional Officer MoRTH Pension Bada NH Campus Raipur 492001 Chhattisgarh Ph 07712436637
Consultancy Services for preparation of DPR for upgradation of NH30 Chilpi to Simga Section km 0 to km 117538 for 2 Lane to 4 Lane with Paved Shoulders configuration in the State of Chhattisgarh
2026_MoRTH_912477_1
RW/RO/CG/DPR/CS/NH-30/2nd
Open Tender
Consultancy
Works
Chilipi Simga
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,900
Regional Pay and account officer MoRTH Raipur
Exempted
RO Morth Raipur, Chhattisgarh
10 Aug 2026
10 Jun 2026
10 Aug 2026
10 Jun 2026
8 Aug 2026
10 Jun 2026
10 Jun 2026 - 27 Jun 2026
3 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Detailed Project Report for | |||||
| 1.01 | Preparation of DPR for up-gradation of NH-30 (Chilpi–Simga Section) to Four-Lane with Paved Shoulders configuration (km. 117.54)in the State of Chhattisgarh. | 0.14 | Nos | - | - |
| 1.02 | Brick work in C.M 1:5 mix including all labour charges etc complete | - | Nos | - | - |
| 1.03 | Brick work in C.M 1:5 mix including all labour 111charges etc complete Brick work in C.M 1:5 mix including all labour 1charges etc complete | - | mm | 100 | - |
| 1.04 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | - | km | 53 | - |
| 1.05 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and in | - | KK | 10 | - |
| 1.06 | Brick work in C.M 1:5 mix including all labour 1charges etc complete Brick work in C.M 1:5 mix including all labour 1charges etc complete | - | Nos | 11 | - |
| 2Laying and Jointing PVC Pipe. Heading | |||||
| 2.01 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using | - | Nos | 10 | - |
| 2.02 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost | - | Nos | 22 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
BOQ_958946.xls
BOQ • 0.30 MB
RFP_2nd.pdf
Tender Documents • 2.48 MB
Corrigendum05.pdf
PDF • 0.43 MB
BOQ_958946.xls
PDF • 0.39 MB
BOQ.pdf
PDF • 0.05 MB
CorrigendumNHCS.pdf
PDF • 1.39 MB
momCS.pdf
PDF • 0.39 MB
Pre-Bidmeeting.pdf
PDF • 0.50 MB
Corrigendum01NH30.pdf
PDF • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .