| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAdmitted-Finance A 27 NAVBHARAT APARTMENT R C MARG CHEMBUR MUMBAI MAHARASHTRA MUMBAI MAHARASHTRA 400074 | MUMBAI SUBURBAN | MAHARASHTRA | 400074 | ₹4.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.9 Cr+₹40.8 L (9.19%)Admitted-Finance M2ZX4 OPP DUKES PEPSI COMPANY WAMAN TUKARAM PATIL MARG AMAR NAGAR CHEMBUR MUMBAI MAHARASHTRA 400071 | MUMBAI SUBURBAN | MAHARASHTRA | 400071 | ₹4.9 Cr+₹40.8 L (9.19%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Continent Engineers L2 | Jyotsna Enterprises L1 |
|---|---|---|---|---|---|
| 1.00 | Sulfuric Acid Plant(SAP):Replacement of Catalyst in Convertor Bed 1 ( V2O5 Catalyst Rings/Star rings supported on & covered on top with Honey Comb structure 80 mm /100 mm ) | 2 | Per activity | 3,33,105 ₹6,66,210 Lowest | 3,35,690 ₹6,71,380 |
| 2.00 | Sulfuric Acid Plant(SAP):Replacement of Catalyst in Convertor Bed 2 ( V2O5 Catalyst Rings/Star rings supported on & covered on top with Honey Comb structure 80 mm /100 mm ) | 2 | Per activity | 3,36,460 ₹6,72,920 | 3,36,310 ₹6,72,620 Lowest |
| 3.00 | Sulfuric Acid Plant(SAP):Replacement of Catalyst in Convertor Bed 3 ( V2O5 Catalyst Rings/Star rings supported on & covered on top with Honey Comb structure 80 mm /100 mm ) | 2 | Per activity | 3,15,325 ₹6,30,650 Lowest | 3,16,330 ₹6,32,660 |
| 4.00 | Sulfuric Acid Plant(SAP):Replacement of Catalyst in Convertor Bed4 ( V2O5 Catalyst Rings/Star rings supported on & covered on top with Honey Comb structure 80 mm /100 mm ) | 2 | Per activity | 2,46,985 ₹4,93,970 Lowest | 2,47,650 ₹4,95,300 |
| 5.00 | Sulfuric Acid Plant(SAP):Replacement of packing in Drying tower | 2 | Per activity | 3,57,540 ₹7,15,080 Lowest | 3,65,090 ₹7,30,180 |
| 6.00 | Sulfuric Acid Plant(SAP):Replacement of packing in Intermidiate Absorption Tower (IAT) | 2 | Per activity | 3,84,685 ₹7,69,370 Lowest | 3,96,570 ₹7,93,140 |
| 7.00 | Sulfuric Acid Plant(SAP):Replacement of packing in Final Absorption Tower (FAT) | 2 | Per activity | 3,76,695 ₹7,53,390 Lowest | 3,88,010 ₹7,76,020 |
| 8.00 | Sulfuric Acid Plant(SAP):SO2 Scrubber packing washing and refilling | 2 | Per activity | 1,32,775 ₹2,65,550 | 1,32,567 ₹2,65,134 Lowest |
| 9.00 | Sodium Nitrate / Nitrite Plant:Absorption tower C-1 | 2 | Per activity | 3,38,035 ₹6,76,070 Lowest | 3,40,840 ₹6,81,680 |
| 10.00 | Sodium Nitrate / Nitrite Plant:Absorption tower C-2 | 2 | Per activity | 3,41,750 ₹6,83,500 Lowest | 3,43,290 ₹6,86,580 |
Tender Value
Refer Docs
EMD Value
₹3 L
Closing Date
17 Aug 2022, 10:00 amClosed
DGM CC AND PHS
ROOM NO.27 ADMIN BUILDING
Biennial rate contract to carry out catalyst replacement and tower packing replacement related jobs in various plants of RCF Trombay unit year 2022-24.
2022_RCFL_703860_1
ET-CC/TS/607/L/22-24/512
Open Tender
Miscellaneous Services
Lump-sum
730 days
RCF TROMBAY
Please refer Tender documents.
13 documents required · 13 mandatory
₹0
₹3 L
Yes
1 Sept 2022
29 Jul 2022
17 Aug 2022
29 Jul 2022
17 Aug 2022
29 Jul 2022
Amount
Sulfuric Acid Plant(SAP):Replacement of Catalyst in Convertor Bed 1 ( V2O5 Catalyst Rings/Star rings supported on & covered on top with Honey Comb structure 80 mm /100 mm )
Sulfuric Acid Plant(SAP):Replacement of Catalyst in Convertor Bed 2 ( V2O5 Catalyst Rings/Star rings supported on & covered on top with Honey Comb structure 80 mm /100 mm )
Sulfuric Acid Plant(SAP):Replacement of Catalyst in Convertor Bed 3 ( V2O5 Catalyst Rings/Star rings supported on & covered on top with Honey Comb structure 80 mm /100 mm )
Sulfuric Acid Plant(SAP):Replacement of Catalyst in Convertor Bed4 ( V2O5 Catalyst Rings/Star rings supported on & covered on top with Honey Comb structure 80 mm /100 mm )
Sulfuric Acid Plant(SAP):Replacement of packing in Drying tower
Sulfuric Acid Plant(SAP):Replacement of packing in Intermidiate Absorption Tower (IAT)
Sulfuric Acid Plant(SAP):Replacement of packing in Final Absorption Tower (FAT)
Sulfuric Acid Plant(SAP):SO2 Scrubber packing washing and refilling
Sodium Nitrate / Nitrite Plant:Absorption tower C-1
Sodium Nitrate / Nitrite Plant:Absorption tower C-2
Sodium Nitrate / Nitrite Plant:Absorption tower C-5
NITRIC ACID GROUP OF PLANTS-NEW NITRIC ACID PLANT'CHANGING OF PACKING OF DEGASSING COLUMN -CO3
MPNA PLANT:'Removal and recharging of SCR Catalyst
P.A.P.PLANT:Removal and recharging of the balls in the ball mill
NEW WATER TREATMENT PLANT-'Removing, Cleaning and refilling of WTP I & II Degasser Tower packing
NEW WATER TREATMENT PLANT-Pressure sand filters WTP-1 ( with manhole cover Dia 20")
NEW WATER TREATMENT PLANT-Pressure sand filters WTP-2 ( with manhole cover Dia 20")
NEW WATER TREATMENT PLANT-Activated carbon filter for WTP-1 & 2( with manhole cover of Dia 20")
A.N.P. PLANT-Removal & recharging of the balls in the Ball Mill
ANP Plant -Removal,recharge and replacement of Final Tail Gas scrubber packings in granulation section
ANP Plant -Removal,recharge and replacement of 29 m scrubber packings in CN section
Urea/ABC PLANT:Removal, cleaning/replacement of Carbonation Tower (C-1) Packing
Urea/ABC PLANT:MP decomposer packing cleaning
Urea/ABC PLANT:LP decomposer packing cleaning
Urea/ABC PLANT:Vent Gas Scrubber (C-607) Packing Removal & Cleaning - Manual
Urea/ABC PLANT:Instrument Air Dryer - Alumina Balls Removal & Cleaning
Urea/ABC PLANT:Cooling Tower Sand filter : Sand/Gravel Removal & Cleaning (No of sandfilters:2)
Ammonia - V Plant:AMMONIA - V Secondary Reformer Catalyst Replacement.
Ammonia - V Plant:Turbine condensate sand filtersV-901' ( with 3 manhole covers Dia 20")( No. of Vessels = 2)
Ammonia - V Plant:Activated carbon filter for Process Condensate V-903 ( with 3 manhole covers Dia 20") ( No. of Vessels = 3)
Ammonia - V Plant:Activated Carbon Removal & Filling in Carbon Filter 'of Benfield Section
Ammonia - V Plant:HYDROGENATION REACTOR
Ammonia - V Plant:DESULPHURIZATION REACTOR
Ammonia - V Plant:H.T.CONVERTER
Ammonia - V Plant:L.T.GUARD
Ammonia - V Plant:L.T.CONVERTER (MAIN)
Ammonia - V Plant:METHANATOR
Ammonia - V Plant:External Cleaning of Primary Reformer Tubes )'(No.of Tubes=168) rate to be quoted per tube
Ammonia - V Plant:Ammonia-V Purge Gas Recovery Unit.ADSORBER MOLECULAR SIEVES REPLACEMENT - A-201 & A-201B
Methanol Plant:Synthesis gas converter R-301, R-302,R-303 catalyst replacement
Methanol Plant:Reformer Tubes external cleaning Total tubes 52 Nos.
Methanol Plant:Primary Reformer Catalyst removal and filling (Total 52 tubes)
Methanol Plant:Replacement & manual cleaning of packing in scrubber tower.
Methanol Plant:Replacement & manual cleaning of packing in HP Separator
Methanol Plant:Desulphurizer:R-1,Catalyst replacement
Methanol Plant:Desulphurizer:R-2,Catalyst replacement
Methanol Plant:Sand filter : Sand/Gravel replacement (No of sand filters:2)
AMMONIA-I PLANT:Packing Replacment of MDEA stripper 01.32 C-3(T-3)
AMMONIA-I PLANT:Packing Replacment of CO2 absorber 01.32 C-2 ( T-1)'Top Column 3 beds bottom column 2 beds)
AMMONIA-I PLANT:Packing Replacment of HP/LP flash column 01.32 C-4 (T-2)'(HP-1bed,L-P 1 bed)
AMMONIA-I PLANT:Packing Replacment of Process condensate flash vessel 01.32 SD-1
AMMONIA-I PLANT:Catalyst Replacement Jobs of Hydro-Desulpheriser 01.23 R1
AMMONIA-I PLANT:Catalyst Replacement Jobs of HT Shift Converter 01.31 R1
AMMONIA-I PLANT:Catalyst Replacement Jobs of LT Shift converter-1 01.31 R2
AMMONIA-I PLANT:Catalyst Replacement Jobs of LT Shift converter-2 01.31 R3
AMMONIA-I PLANT:Catalyst Replacement Jobs of Methanator 01.31 R1
AMMONIA-I PLANT:Primary Reformer Ammonia -I 01.23 F-1 96 tubes CATALYST REPLACEMENT JOB Rate in Rs. Per Tube ( rate to be quoted per tube)
AMMONIA-I PLANT:Secondary reformer Ammonia-I 01.32 R2
Continent Engineers
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .