Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance T10 3RD FLOOR RAYHILSORT RESIDENCY DR PICKLE ROAD UTTARA KANNADA KARNATAKA 581301 UDYAM GA 02 0002041 27AAJCM4307Q1ZY B 29AAJCM4307Q1ZU R | UTTARA KANNADA | KARNATAKA | 581301 | Admitted-Finance |
| 3 | Admitted-Finance C 440 1 MIDC TTC INDUSTRIAL AREA TURBHE NAVI MUMBAI THANE MAHARASHTRA 400705 | THANE | MAHARASHTRA | 400705 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance 31 NEELGIRI IND ESTATE T J ROAD SEWRI W MUMBAI MAHARASHTRA 400015 | MUMBAI | MAHARASHTRA | 400015 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
19 Apr 2023, 11:00 amClosed
THE ADMIRAL SUPERINTENDENT
Naval Ship Repair Yard Naval Base, Karwar 581308
NORMAL REFIT (NR) OF FB PURAN
2023_NAVY_586104_1
YCM/NR22/FB PURAN
Open Tender
Marine Services
Item Rate
180 days
Karwar
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
CoY, Karwar
11 Sept 2023
16 Mar 2023
20 Apr 2023
17 Mar 2023
19 Apr 2023
17 Mar 2023
23 Mar 2023
Amount
Erection of fixed staging/scaffolding in way of steel renewal work(Based on Volume Basis, LXBXH). Staging material to be provided by Contractor
Provision of fire sentries for minimum 10 hot work locations /day. Its to be noted that one hot work location means sentries including sentires in adjacent compartments also. Fire sentries are to have adequate knowledge of fire and safety procedures and the same would be checked by RMT prior deploying. Every sentry is to be properly dressed up in proper PPEs and in possession of required type of fire extinguishers in appropriate quantity (minimum one AFFF extinguisher, water bucket with mug, connected fire hose. Sentries posted in electrical compartments to have Co2 fire extinguishers in addition). All fire fighting equipment to have serviceability certificate/ pressure testing details. Fire safety to be ensured by sentries upon completion of job / shift in surrounding areas as well and sentry is required to remain in hot work place atleast 30 min after completion of hot work. Asbestos sheet / fire proofing blankets to be provided during hot work in vicinity of sensitive equipment / electrical systems or cabling, with vendor holding responsibility for damage and repairs in case of fire/incident. All types of materials are to be provided by vendor. Quote for service and material
Cleaning and Gas free certification i.a.w NO 09/12 of Fuel / Oil Tanks, Water Ballat Tanks, Fresh Water Tank, slop tanks and Void spaces/coffer dams. Quote for Service and Material.
Pressure Testing of Underwater tanks/void spaces/cofferdams. Including repairs/blanking of manhole covers (with new rubber gaskets/studs/bolts/as required) and defect rectification of all structural leaks i.a.w NO. 01/15. Material and spares to be provided by contractor. Ballast tanks -08, Fuel tanks- 14, Fresh water tanks- 03, Peak tanks- 02, Slop tanks - 02, Coffer dams - 02 and Void space - 02. Quote for Service, consumables, spares etc. Payment on actuals
Bollard, Bullring/ Mooring, Hawse Pipe and Fairlead - Carry out surface preparation by hydrojet blasting up to bare metal to WJ-2L Standard. Repairs/ renewal to be undertaken as per hull survey report of bollards / fairleads and stiffening members in the vicinity by NSRY survey team. Bollard (qty 13), Fairleads (qty 10), Hawse pipe (qty 02). Note:- After hydrojet blasting, primer application to be undertaken to prevent flash rusting and the same is to be put up for inspection prior to repair / renewal or painting to refit monitoring team. Inspection to be cleared post repairs by NSRY/ QC Team. All kinds of Material for repair or replacement (iaw NSRY survey report) and all associated serv ices to be provided by contractor.
Underwater Hull- (a) Remove marine fouling and loose paint using hydrojet cleaning and prepare the area for inspection within 72 hours of docking. Job also involves opening and cleaning of gratings. Defects to be rectified as per hull survey report by NSRY Survey team. (b) Remove complete old paint to bare metal from hull by vacuum blasting using chilled iron/grit shots of Gr 24 or Gr 17DS Cat no. 5350-000139 or 5350-000140 to achieve SA2.5 standard prior painting. The procedure should give a surface profile of 2-4 mils when measured by surface profile gauge. Mil scale, rust and other contaminants are to be cleaned with a vacuum cleaner or dry compressed air and clean brush. The surface should be applied with first coat of paint immediately. Paint scheme on full underwater hull and boot top including wind and water areas i.e. Area up to 500mm above boot top area is to be restored post SA 2.5 standard. Draught marks to be painted with underwater paint scheme and the top coat to be painted with white paint at (i) Forward (ii) Midship and (iii) Aft. Renew defective embossed draught marks. Note-: Navy approved paint schemeof M/s Jotun to be applied. Painting to be carried out as per NO 53/16 and extant policies of Indian Navy on paint scheme of M/s Jotun (c) Draught marks to be painted with underwater paint scheme and the top coat to be painted with white paint at three location each side. (i) Forward (ii) Midship, (iii) Aft. (d) Renew defective draught marks, if any. Note:- Painting to be undertaken with Navy approved paint scheme of M/s Jotun for underwater hull areas. Material and Service to be provided by contractor
Above Water and Weather Decks areas - Carry out surface preparation of weather deck and above water areas (Shipside, superstructure and deck fittings) by hydro jet blasting to WJ-2L standard and prepare areas for hull survey. All structural repairs/ renewal to be undertaken as per hull survey report of NSRY survey team. Restoration of complete paint scheme as per Navy approved paint scheme of M/s Jotun to be undertaken in accordance wth Navy Order 53/16:- (a) Above Water Areas (Shipside, Superstructure, deck fittings)- 840 SqM (i) One coat of primer (Dft 50 microns). (ii) Two coats (each 125 microns Dft) of anti corrosive paint . (iii) One PU Top Coat of DFT 60 microns - RAL 9011 Black for Shipside/Deck fittings, IS-5/358 buff colour for Superstructure, RAL 7040 Grey for deck machinery and miscellaneous fittings. (b) Weather Decks - 950 SqM (i) One coat of primer (Dft 50 microns). (ii) Two coats of anti corrosive intermediate coat (Dft 150 microns each) (iii) Two coats of non -slip epoxy paint D.A Grey NMRL approved (Dft 250 microns each) Material and service to be provided by contractor
Funnnel and Masts- Carry out complete surface preparation by hydro jet blasting to WJ-2L standards. Clean and restore paint of surroundings structure, funnel and Mast structure. Painting to be carried out as per NO 53/16 of M/s Jotun. (i) One coat of primer (Dft 50 microns). (ii) Two coats (each 125 microns Dft) of anti corrosive paint . (iii) One PU Top Coat of DFT 60 microns - RAL 9011 Black for funnel andIS-5/358 buff colour for Mast. Material and Service to be provided by contractor.
Machinery Spaces (Engine room-450 SqM, Steering Gear Compt - 130 SqM, Pump/ Emergency Pump room - 370 SqM) Following works to be undertaken:- (a) Clean all bilges, machinery foundations, limber holes and drain holes. Carry out surface preparation as per ST-3 standard and painting of the entire area to be undertaken as per Navy approved paint scheme of M/s Jotun iaw NO 53/16. (i) One coat of primer (Dft 50 microns). (ii) Two top coats of anticorrosive paint (each 150 microns Dft) . (b) Machinery pipelines painting to be undertaken as per colour coding post surface preparation to ST 3 standard. (c) All equipment/ machinery to be painted as per existing paint scheme. (d) Painting of bulkheads, deck head of machinery compartments to be undertaken as per existing paint scheme post surface preparation to ST 3 standard. (e) Examine structures not covered by lagging, paying particular attention to position where water is likely to accumulate, longitudinal junctions with side plating and machinery bearers with bottom plating, horizontal surfaces such as tank tops, horizontal stiffeners and structure obscured by cable plating. (f) Portable fittings that obscure structure are to be removed for examination of structure behind. Paint to be restored as per existing paint scheme. Paints to be provided by Firm. Material and Service to be provided by contractor.
Lagging Replace damaged / perished lagging at various places including lagging removed for degutting works using pin method. Renew / restore paint scheme in hot work affected areas prior fitment of new lagging. Material - MWMB Grade Insulation Material, Thickness - 75 mm. Paint as per location. Material and Service to be provided by contractor.
Cathodic Protection Sacrificial Anodes - Replacement of all existing sacrificial anodes with indium free aluminium alloy sacrificial anodes fitted to underwater hull, inlets and outlets and sea chest iaw NCD 3908 issue 1, Aug 19. Sacrificial anodes to be procured from IHQ MoD(N) nominated firms only. Quality certificate to be provided for new anodes and anodes are to be offered for inspection to NSRY QC team prior fitment. Material and Service to be provided by contractor.
Steel Renewal- (a) Renew steel plates along with stiffeners at following locations: - (i) Underwater Hull (ii) Underwater compartments (iii) Fuel, Fresh Water, Ballast and Misc tanks (iv) Shipside and Superstructure (v) Masts and Funnel (vi) Foxle deck, Main deck, Poop deck, bridge deck, Bridge top deck and deck fittings (vii) Internal compartments. (b) Job also involves degutting and re-gutting works like lagging, deck covering, machinery equipment , paneling, system pipelines/ valves, electrical cables/ conduits/ junction boxes, foundations/ brackets and wooden fittings etc in way of steel renewal to be undertaken. (c) Paint scheme on renewed plates (including all affected aras and stiffeners) to be undertaken post surface preparation iaw NO 53/16. (d) Record section wise report of steel renewal and forward final report in 03 sets of hard copy and 01 set of soft copy to ship staff. Note:- Quote for Service and consumables. Payment on actuals.
Steel Renewal- Supply of Mild steel conforming to IS-2062 specifications of 2011 for steel renewal. Steel is to be procured through M/s SAIL or M/s ESSAR or M/s JIndal only and all relevant supply and material specifications certificates and test reports are to be submitted while delivering the item at NSRY (Kar). Steel details are as follows: Steel thikness 08 MM - 12 tons Steel thikness 10 MM - 02 tons Steel thikness 12 MM - 01 tons Quote for Service and material separately. Payment on actuals.
Repair & refitment of panelling including regutting of lagging, clamps and fasteners. Mat-SS. Material and Service to be provided by contractor
Fabrication & fitment of new panelling including regutting of lagging, clamps and fasteners. Mat-SS. Material and Service to be provided by contractor. Payment on actuals.
Anchor, Chain Cable and Cable Locker - (a) Remove and lay out Anchor, chain cables and accessories. Dismantle anchor, chain cables and accessories. Carry out surface preparation up to bare metal to WJ-2 standard for survey of anchor, chain cable along with accessories , naval pipe for survey . (Qty:- Anchor - 02 nos, cable dia-24mm, chain cable length-330 mtr, Swivel Piece - 02 nos, Lugless Joining shackles - 12 nos, Lugged Shackles - 02 nos). (b) Carry out surface preparation of cable locker (Area- 57 Sqm) to ST-3 standard and restore paint scheme of M/s Jotun iaw NO 53/16. (i) One coat of primer (Dft 50 microns) (ii) Two intermediate coat (Dft 150 microns each) (iii) One Top coat (Dft 50 microns) (c) Anchor cleaning sea water line to be repaired/ renewed and make functional. Repairs to be under taken as per Survey report of NSRY survey team. (d) Clean and grease all joining shackles. Strip and grease slip in cable locker. Re-arrange cable length to ensure equality of wear. Re-mark cable length. Overhauling hull associated fittings including deck rollers and renew as required. (e) Clean and grease trunion pin and housing. Grease to be used:- LG-280 .The machined surface of the joints of lugless joining shackles are to be examined for corrosion. All Anchor, chain cables and accessories are to be stripped, greased and re-assembled. (f) Painting of anchor, chain cables and accessories to be painted with two coats of Bituminous paint (Black) and restore onboard. Note- Quote for services and consumbales.
Anchor, Chain Cable and Cable Locker - Supply of anchor chain cables and accessories (dia 24 mm) in accordacne with survery report by survey team of NSRY (Kar). Following items to be supplied only if declared BER during survey. Qty:- (a) Chain shackles - 06 nos (b) Lugless Joining shackles - 06 nos (c) Lugged Shackles - 02 nos. Note- Item to be procured from Indian Navy approved supplier M/s Indian Chain Pvt Ltd, Kolkata alongwith relevant test certficates. Services for the same including use of any consumable etc are also to be provided by vendor.
Overhauling- Capstan (Mfd- Hemant Eng. Works) - Following work to be carried out:- (a) Overhauling of capstan along with motor assembly and changing of oil. Equipment to be proved for satisfactory operation. Undertake weather proofing of motor terminal box. (b) Replace all high speed bearings. (c) Blow out all motor windings thoroughly with clean dry air. (d) Clean and thereafter varnish dirty and oily windings. (e) Motor to be overhauled, with both bearings renewed & tested onboard on load (subject to QC checks). (f) Overhauling of brake mechanism to be carried out. (f) Inspect and overhaul the control panel and renew defective components and cabling. (g) System to be proved for designed operation and load trials to be offered. (h) Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). Clean and restore paint scheme post surface preparation. Material and Service to be provided by Contractor
Overhauling- Anchor Winlass (Mfd- Hemant Eng. Works) - Following work to be carried out:- (a) Overhauling of anchor windlass along with motor assembly, rollers associated with windlass and other accessories. Replacement of gear box oil to be carried out. Insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box (IP67). (b) Replace all high speed bearings with new bearings (specification as per existing bearings) (c) Blow out all motor windings thoroughly with clean dry air. (d) Clean and varnish dirty and oily windings and replacement with new copper winding if defective. (e) Motor to be overhauled, both bearing to be replaced with new bearing post QC checks by NSRY QC team. (f) Overhaul brake mechanism. Replacement of defective components if required. Greasing of lubrication points to be undertaken (g) Overhaul the control panel, and replacement of defective components and cabling. (h) Replace all safety pins along with SS chain used for locking arrangement. (j) Carry out surface preparation of foundation and structure by hydrojet blasting to achieve WJ-2 standard for undertaking survey. Structural repairs/ renewal to be undertaken as per survey report of NSRY survey team. (k) Replacement of all fasteners on foundation to be undertaken. Replacement of all grease nipples to be undertaken and grease to be charged. (l) System to be proved for designed operation and load trials to be offered. Clean and restore paint scheme post surface preparation to WJ 2 standard and offered to NSRY QC prior painting. Reference:- OEM Manual Note:- Vendor to cater for all consumables, including POLs topup required for energising the equipment post repairs. Material and Service to be provided by Contractor.
Mushroom Heads Overhauling of entire mushroom heads alongwith quick shut off assembly to be carried out. Job involves opening of mushroom heads and replacement of wire mesh, rubber beading, fasteners, flaps etc. Replace spindle assembly with wheel, if defective. Chalk test to be carried out post repairs and proved in the presence of NSRY QC team. Structural repairs/ renewal to be carried out, if required. Material and Service to be provided by contractor.
Overhauling-Sewage Treatment Plant (Mfd - Hamworthy, England, Model-ST 3 A-C) - Undertake following :- (a) Carry out de-sludging of sewage tanks. Undertake surface preparation of tanks to ST-3 standard by mechanical cleaning. Paint scheme to be restored with- (i) Two coats of anticorrosive paint (Dft 150 microns each) of M/s Jotun. (b) Carry out functional checks of tank level switches. Replace defective component if required. (c) Dismantle and clean all system pipelines. Surface preparation and painting to be carried out as per existing paint scheme. Renew defective pipelines if required. Pressure testing of renewed lines to be carried out. (d) Dismantle all system valves and undertake overhauling of valves. Replace defective valves and valve components if required. (e) Carry out following on Macerator pump:- (i) Carry out overhauling of pump. Replace defective components. Replace drive end bearing and seals if required. (ii) Ensure impeller is free for rotation with no vibration. (iii) Ensure overload units are operating correctly. (f) Carry out overhauling of blower. Replace all defective components/ parts, if required. (g) Carry out overhauling of dosing pumps (02 nos). Replace all defective components if required. (h) Carry out replacement of aerator air diffuser elements. Replace all chemical solutions with requisite quantity, used for operation of STP. (j) Post repairs/ overhauling work, STP is to be proved for operation as per designed parameters. (k) Undertake Effluent test from NABL accredited lab and check compliance to MARPOL norms. (l) Sewage pollution prevention certificate valid for duration of five years from a state authorised accredited agencies as specified in MEPC 115(51) and 227(64) as per annex iv of MARPOL 73/78. (m) Carry out calibration of fixed H2S sensor. Certificate of calibration to be obtained from the OEM. Date of calibration and next due date should be clearly indicated on the certificate. Reference:- (a) OEM Manual (b) NCD 3930 Issue 3 Material and Service to be provided by Contractor
Ventilation Trunking - (a) Mechanical cleaning of Ventilation trunkings to be undertaken. Replace with new all perished / damaged trunkings as fitted onboard including wire mesh / louvers, rubber beadings, gaskets, fasteners, ventilation flaps and earthing strips on upper deck and mess. Paint to be restored post repairs as per existing paint scheme. (Job involves removal and re-fitment of all light fittings, pipe lines, valves, electrical cables, junction boxes, lagging, panelling, obstructions, protrusions, foundation etc as required). (b) All wire mesh of different sizes to be replaced (approx. - 20 nos). Material and Service to be provided by contractor.
Grease filters inside exhaust trunking are initial fit in galleys and are to be replaced, Qty- 02. Material SS and wire mesh. Material and Service to be provided by contractor.
Airvent Pipe (Goose neck)- (a) Carry out replacement of wiremesh, fasteners and rubber beading of flaps. Qty-22 nos. (b) Undertake structural repairs/ renewal , if required. (c) Chalk testing to be proved post completion of repair work. Material and Service to be provided by contractor.
Life raft - (a) Replace Hydrostatic Release Gears by NABL accredited agency. (Qty 02) Quote for material. (b) Life raft stowing brackets (Qty 02) along with life raft securing straps, slips, hooks and shackles to be renewed. Quote for services and material.
Ladders - Carry out mechanical surface preparation of all ladders up to bare metal. Repairs to be under taken as per hull survey report of ladders with associated footsteps and handrails. Paint to be restored as per existing paint scheme. Material/spares/consumables etc and Service to be provided by contractor
Overhauling- Single Arm Boat Davit (Mfd - Aquarius Fiberglass Pvt. Ltd): - (a) Overhauling of boat davit, manual release hook, gear box along with motor assembly to be carried out. Insulation checks of the motor to be undertaken. Undertake weather proofing of motor terminal box(IP67). During trials motor parameters are to recorded and same to be cleared by NSRY QC. (b) Renewal of boat fall and release mechanism wire rope along with end fittings , securing arrangement, hooking arrangement and other associated lifting gears to be undertaken. (c) Operation of manual hand release mechanism to be proved. (d) Replacement of gear box oil to be carried out. (e) Replacement of all limit switches to be carried out with specifications as existing and proving of limit switch operation to be undertaken. (f) Replacement of all grease nipples and grease to be charged. (g) Carry out surface preparation of foundation and structure by hydrojet blasting to achieve WJ-2 standards for undertaking survey. Structural repairs/ renewal to be undertaken as per survey report of NSRY QC team. Clean and restore paint post surface preparation and inspection to be offered to NSRY QC. (h) Load test to be carried out post completion of repairs and equipment should withstand load trials. (SWL 01T, Running load 1.5T and statIc load 2T). Defects observed during load testing to be liquidated. (j) System to be proved for designed operation and load trials to be cleared. Load test certificate to be provided post successful completion of load testing. Reference:- OEM Manual Note:- Vendor to cater for all consumables, including POLs required for energising the equipment post repairs. Material and Service to be provided by contractor.
Overhauling Rescue Boat - Operationalise rescue boat. Carry out following:- (a) Repair of GRP hull structure and serviceability checks of boat to be carried out. (b) Renew all rubbing strips, hand hold , life lines, grab handles and reflective tape. (c) Carry out overhauling/ serviceability checks of hook mechanism. Replace defective components, if required. (d) OBM Engine is to be completely overhauled (e) Boat chocks to be repaired and cushion to be replaced. Renewal of all seating arrangements of boat. (f) Boat securing strap (gripes) to be renewed along with end fittings. Mat - polyester. (g) 02 in nos oars and 01 no. boat hook for rescue boat damaged / broken. To be replaced. (h) Replace polyester webbing boat sling for lowering and hoisting purpose. SWL 3.5 ton. Load test certificate to be provided. (j) Painting of boat to be carried out as per existing scheme post repairs (k) Trials to be carried out alongwith weighing of boat with accessories post repairs and proved for satisfactory performance. Test certificate to be provided. All types of Materials/ spares/ consumables/ accessories etc and Services are to be provided by Contractor
Overhauling - Sanitary System - Operationlise complete sanitary system. (a) Strip, clean and overhaul WC and urinal flushing valves, reducing valves and reducer (Qty 08). (b) Strip and clean sanitary system drain pipes. Re-galvanize where required (Length - 50 m). (c) Following accessories in the WC and bathroom to be replaced:- (i) Hand Shower - 04, (ii) Wash basin tap - 04, (iii) Commode seat cover - 03, (iv) Commode flush knobs - 04, (v) Wash Basin drain pipe - 06 (vi) Shower curtains - 05 (vii) Tiling work - 30 Sqm. Material/spares/consumables etc and Service to be provided by Contractor. All the items used are of high quality (minimum ISI or equivalent standard) and items are to be approved by RMT proir fitment
Overhauling- Domestic Fresh Water System - (a) Strip, clean and overhaul domestic fresh water system valves. Stop cock (qty 08), basin beep cock (pillar) (qty 04), sink beep cock (pillar) (qty 01). Material - Brass (chrome plated). (b) Strip and clean domestic fresh water system pipes and deck drains. Re-galvanize where required (Length - 40 m). Repairs/ renewal of pipe line to be carried out, if required. Material/spares/consumables etc and Service to be provided by Contractor. All the items to be used are of high quality (minimum ISI or equivalent standard) and items are to be approved by RMT prior fitment
WT Doors -Following work to be undertaken:- (i) Carry out surface preparation of door structure to ST 3 standard by manual chipping/ buffing up . (ii) Overhauling of clips and hinges to be caried out. Replacement of defective clips, hinges and associated fittings . Examine washers, sealing rings and rubber sealing. Replace all worn out parts of doors. Replace rubber beading with high performance silicone rubber beading iaw NCD 5910 issue 1, Feb 18. (iii) Carry out chalk test of all W/T doors post completion of work and to be proved in presence of NSRY QC team. (iv) Paint to be restored as per existing navy approved paint scheme of M/s Jotun iaw NO 53/16. Material (including all spares and consumables) and Service to be provided by contractor.
NWT Doors - Following work to be undertaken:- (i) Repair/ replacement of defective door hinges, deformed structure (including replacement of door locking mechanism with spares, hinges, handles, stoppers, latches, locking arrangement hydraulic door closing mechanism and beading. (ii) Replacement of sunmica/ CRCA (white colour) to be undertaken on all NWT doors. (iii) Renew hydraulic doors closer for NWT doors. Curtain to be provided made of fire retardant cloth. Qty -08 (Size 7X3 feet each) . Payment on actuals. Material and Service to be provided by contractor.
WT Hatch and Manhole - (a) WT Hatch (16 nos) -(i) Carry out surface preparation of foundation and structure by manual chipping/ buffing up to bare metal (ST 3). (ii) Repairs and overhauling of hatch clips, hinges assembly and locking mechanism. Rectify structural defects if required. Replace defective parts/ components, if required. (iii) Carry out replacement of existing rubber beading with High performance silicone rubber beading iaw NCD 5910 issue 1, Feb 18. Chalk test to be undertaken post repairs and proved in presence of NSRY/ QC team. (Qty -16) (b) Manholes- Renewal of rubber gaskets and fastners of manholes. (Qty - 28 nos). Material and Service to be provided by contractor
Scuttles & Windows - Repair hinge fittings, toughened glass and glass rails for looseness and sign of wear / damage. Renew worn out or damaged parts and rubber beadings. Chalk testing to be carried out post repairs. Curtain to be provided made by fire retardant cloth. Scuttles- 07 nos , Windows- 18 nos, toughned glass(04). Payment on actuals. Material and Service to be provided by contractor
Guardrails and Stanchions - (a) Replace guardrail stanchions and securing foundations. Paint scheme of the stanchions to be restored as per paint scheme. Length - 60 Rmtr (b) Safety chain for guardrail damaged/ broken along with bottle screw (Mat -SS). To be replaCed. Mat - SS, Dia - 10 mm, Length - 30 mtr, Bottle screw - 30. Material and Service to be provided by contractor. Payment on actuals
Towing Hook with quick release mechanism - (a) Carry out overhauling and repairs of towing hook assembly (Qty - 02 nos). Job involves renewal of release line and other associated accessories. (b) Carry out serviceability checks of pneumatic cylinder , air line, solenoid and push button mechanism and Replace all defective components, if required. (c) Operation of towing hook to be proved for satisfactory performance post repairs. Material and service to be provided by contractor
Paint Scheme Renewal Water Ballast Tank, Fresh Water Tank, Void Space and Cofferdam- Carry out complete surface preparation to SA 2.5 standard by using abrasive blasting. All Structural repairs/ renewal to be carried out as per hull survey report of NSRY survey team. Thereafter, complete Paint Scheme to be restored as per Navy approved paint scheme of M/s Jotun iaw NO 53/16 for the following tanks:- (a) Ballast Tanks (10 nos) - 3020 SqM (b) Fresh Water Tanks (03 nos) - 218 SqM (c) Void Space (02 nos)- 210 SqM (d) Cofferdam (02 nos)- 190 SqM Note:- Paint to be supplied by contractor. Performance guarantee certificates of paint OEM to be provided post completion of work. Material and Service to be provided by contractor. Payment on actuals
Paint Scheme Renewal Fuel Tanks - Carry out complete surface preparation to SA 2.5 standard by using abrasive blasting. All Structural repairs/ renewal to be carried out as per hull survey report of NSRY survey team. Thereafter, application of Heavy Filtered Mineral Oil (OM -750 ) to be carried out iaw NO 53/16 / extant policy in the following tanks:- (a) Fuel Tanks (02 nos) - 200 SqM (b) Cargo Tanks (10 nos) - 1315 SqM (c) Slop Tank (02 nos)- 150 SqM (d) Bilge Tank (01 no) & Sludge Tank (01 no)- 30 SqM Note:- OM 750 to be supplied by contractor. Performance guarantee certificates of paint OEM to be provided post completion of work.Material and Service to be provided by contractor.
Painting of Internal compartments - Paint damaged areas of all internal compartments are to be prepared up to bare metal by ST3 standard, carry out repairs of plating, structures and fittings of various compartments as per hull survey report and undertake painting as per existing paint scheme. Material and Service to be provided by contractor.
Rubbing Stake - Rubber fenders (rubbing stake) all around the fuel barge found damaged / perished. Fenders to be replaced as per sample. Length- 100 mtr, dimension - 6.5 " X 6", Thickness - 2". Material - EBDM/NBR/Natural rubber. Job involves degutting of lagging / panelling / equipment / cabling and regutting in affected compartments inside along with replacement of nut/ bolts etc. Material and Service to be provided by contractor
Pneumatic side fenders (size- L- 1160 MM, Dia - 660 MM) to be replaced. (Qty - 08, Mat-Neoprene Blended Rubber having 65 % min Neoprene Content , , Colour-White/ Black, Tensile strength- 180 Kgf/CM2, Elongation at break- 400 % min, Hardness- 700 max, Tear Strength- Min 40 Kgf/CM2, Compression set- 30 % Max, Abrasion resistance- 0.5 CC Max). Material and Service to be provided by contractor
Fenders -Tyre fenders of barge defective to be replaced (Qty- 45, Aircraft tyres with outer dia 90 cm) with new fenders. Note:- (a) Job involves fabrication of three hook brackets along with securing plate for securing tyre with chain in three dimensions, renewal of eye pads associated with rubber fenders, 20 mm galvanised chain and D shackle 20 mm. (b) Cutting and welding assistance for removal of existing damaged pad eyes and removal and fitment of Tyre fenders. (c) Degutting / regutting works like lagging, underlay, panelling, electrical wires minor equipment. Brackets if required for welding of eye pads. (Note : Vendor to clear QC checks from RMT prior fitment). Material and Service to be provided by contractor
Life Saving Appliance. Renewal of following:- (a) Lifebuoy with self igniting light and smoke signal (MOB marker) quick release type to be replaced on bridge deck (qty 02), (b) Lifebuoy with life line (30m long) on 01 deck (qty 02), (c) Ordinary lifebuoy damaged. on main deck (qty 02), (d) Lifebuoy with self igniting light and 30m buoyant life line on 01 deck (qty 02). (e) Renewal of reflective tape on all lifebouys. Material and Service to be provided by contractor
9 Mtr aluminum gangways damaged / broken. To be replaced with new gangway as per sample/ drawing of existing gangways. Mat - Al, length - 09 mtr.
Renewal of Wooden Furniture - Repair of wooden furniture (dining table top in crew and officer's dinning hall - 02 nos, wooden locker in dinning hall-01, wooden locker in provision store - 02. Mat - Wood. Material and Service to be provided by contractor.
Renewal of locking arrangement and channels of all lockers and cupboards in all cabins and wheel house. Material and spares to be provided by contractor.
Plywood/ Sunmica of lockers, cupboards , other wooden furniture in various offices and accommodations and wooden frames of WT doors found broken / perished. The same is to be repaired with new plywood/ sunmica sheets. Material and Service to be provided by contractor. Payment on actuals
Replacement of Bunk lockers (Qty 20), galley locker (Mat - SS, Qty - 02) and hot plate locker (Qty - 01) to be undertaken as per sample. Material and Sevice to be provided by contractor
Replacement of Sofa with table (qty 01) (5 men sofa) as per sample. Material and Service to be provided by contractor. Sample is required to be cleared from RMT prior to the supply of the item.
Replacement of mattress with cover and their securing arrangements. Single type mattress (Qty 14). Thickness - 6" as per sample provided by RMT. Material and Service to be provided by contractor
Following chairs to be replaced : - (a) Cabin chairs in mess decks - 04 (b) Dining Chairs - 06 (c) Executive Chairs (Revolving) - 04. (Note : Vendor to clear quality checks from RMT prior delivery). Material to be provided by contractor
Replacement of Name Board Ships illumination name box on mast damaged/ defective. To be Replaced. Job involves securing arrangement and electrical fittings. Mat - MS (qty 01) Box dimensions - 770 mm X 470 mm, Font Size - 150 mm. Material and Service to be provided by Contractor
Ships name board on Port and Stbd side to be Replaced. Mat - Wood (qty 02) with name engraved by steel electroplating. Size - 1090 mm X 780 mm, Font Size - 230 mm (Hindi and English Fonts). Material and Service to be provided by Contractor
Airvent pipe and valve - Overhauling of 36 in nos ball type check valves of Airvent pipe to be undertaken. Repair structural defects. Air vent valves of all ballast tanks to be overhauled and mesh to be replaced. Material and service to be provided by Contractor
Fire Hose boxes and hoses (a) Fire hose box and securing brackets corroded at multiple locations. To be Replaced. Job involves welding, cutting and replacement of securing brackets. Qty - 05, Mat-MS (b) Renewal of fire hoses with coupling 70 mm X 18 Mtr. Qty – 20. Material and service to be provided by contractor
Foundation of Port and Stbd search light found deteriorated. Replacement to be undertaken. Mat - MS, (Qty - 02) Material and Service to be provided by contractor.
Rotating mechanism of Port and Stbd search lights jammed. Overhauling of mechanism to be undertaken. (Qty - 02). Material and service to be provided by contractor
Metallic canopy on Main deck to be replaced (Corrugated metallic sheet, Mat-GI) . Job involves complete replacement of stanchions, stanchion shoes, securing strips and installation with new canopy (50 sqm). Material and service to be provided by Contractor
Chair fitted in Wheel House (Qty - 01) and engine room (Qty - 01) found damaged/ broken. Chair to be replaced as per sample. Job involves fitment of chair and replacement of securing brackets. Material and service to be provided by Contractor
Fixed wooden chair to be fitted in Wheel House for operator. Job involves fitment of chair and replacement of securing brackets. Mat - Wood. Material and service to be provided by Contractor
MOB marker brackets in bridge wing (port & stbd) damaged/ broken. To be replaced Job involves welding and cutting assistance. Mat - MS, Qty - 02. Material and service to be provided by contractor
Curtains in dining hall to be renewed with fittings as per sample. Material- Fire retardant cloth. Dimensions - 4 Feet X 6 Feet, Qty - 03. Material and service to be provided by contractor
Sounding cap of various tanks threads worn out on both end. To be replaced. Sounding cap to be modified to prevent contamination of water. Mat - Brass. Material and service to be provided by Contractor
Box for storing life buoy found damaged. Boxes to be replaced with new box and fitment in place. Mat- Plywood. Qty - 02. Material and service to be provided by contractor
Deck Covering Scheme. Removal of defective deck covering to be undertaken. Surface preparation to be carried out for hull survey. Structural repairs/ renewal including dado areas to be carried out as per survey report of NSRY. Application of new deck covering on deck and dado casting to be carried out post completion of repairs/ renewal. Reference NCD 3717, Issue 4. Material and Service to be provided by contractor
Following to be supplied:- (a) IMO stickers to be Replaced all around ship.(Qty - 120). (b) Replaced of Canvas covers of following deck equipment -Windlass and control stand (02 Nos), rescue boat (02 Nos), search light (02 Nos), magnetic compass (02 Nos), capstan and capstan control (02 Nos), boat motor (02 Nos). Material and service to be provided by contractor
Securing brackets:- (a) Fire extinguisher securing brackets to be replaced including associated degutting of lagging / panelling / equipment / cabling and regutting. Job involves cutting and welding work. Qty - 10. (b) Securing brackets of various equipment, firemain line, fittings damaged/ corroded on weather deck. To be Replaced and equipment to be fitted back. Qty - 30, Mat - MS. Material and service to be provided by contractor
(a) 05 in nos marine wall clock to be Replaced Material to be provided by contractor. (b) Electroplating job to be undertaken on stainless steel fittings in galley and ships bell. Material and service to be provided by contractor.
Portable Aluminum ladder broken / damaged. To be replaced as per sample. Quote for material
Port and Stbd Main Engine (M/s Cummins India Ltd, Model- KTA-19-M4)(Running Hours - Port : 1523, Stbd - 1654) :- Carry out following 6000 hourly routines / work:- (a) Change engine oil, oil filter and by-pass filter (b) Clean pre-cleaner dust pan of air system (c) Change air cleaner element (d) Change coolant (e) Clean fuel filter / water separator (f) Change marine gear oil (g) Adjust throttle linkage, rectify defect if any (h) Cleaning and calibration of fuel pump, rectify defects if any. Also, change fuel filters, (j) Clean fuel tank breather, (k) Clean crankcase breather (l) Replace heat exchanger Zinc plugs (m) Replace engine driven pumps belts (n) Calibrate injectors and adjust valves, retify defects if any (p) Replace rocker cover gaskets, (q) Overhaul starting motor and dynamo of both main engines (r) Port main engine starting panel indicator light not working, to be replaced (s) Stbd main engine digital RPM indicator in LCP not working, to be replaced (t) Overhaul turbochargers of both engines, rectify defects if any (u) Leakage observed from Port Main engine lub oil hand pump. Defect to be rectified, (v) Replace all instrumentation gauges and fittings (RPM, lub oil pressure, lub oil temp, water temp, voltmeter, hour counter) (w) Remove, dismantle, chemically clean, assemble and pressure test upto required pressure of Fresh water and lub oil heat exchangers of both Main engine. Rectify defects if any (x) Replacement of all flexible hoses, durrets and fittings. (y) Undertake tappet setting for all cylinders. (z) Carry out SDC checks of both Main engine, rectify defects if any. Note:- Coolant - fleetguard CC2505 (10 litre), lub oil - volvoline 15W40 (150 Litre) and Marine gear oil - SAE40 (10 litre) to be provided by Vendor. Quote for services and supply of POL as per Engine specifications
Kit for 6000 hourly routines of both Main engines. Make - M/s Cummins. Quote for Material, Payemnt on actuals
Exhaust leakage observed from Both Main engine and DA Exhaust compensator, to be Replaced with new. Quote for Service and Material
Port Main engine lub oil cooler sea water discharge pipe corroded. Pipe to be Replaced Mat-GI, Dia-65 mm. Length- 01 meter, Quote for Service and Material
Fuel float tank of both Main engine damaged, to be Replaced Quote for Service and Material
Carry out checks of both Main engines local control panel and wheel house control panel, rectify all defects. Replace all Instrumentation gauges. Quote for Service and Material
Carry out SDC checks (Both Hot & Cold) of both Main engine, rectify all defects. Quote for Service and Material
Stbd Main engine RPM not increasing beyond 1400. RPM dropping at idle condition below rated RPM. Defect to be rectified. Quote for Service and Material
Carry out overhauling of both Main engine Sea water pump. Zinc anode to be Replaced Quote for Service and Material
ME Spares (3512C) :- (a) Electronic controller Unit, Qty-02 nos (b) Thermostat, Qty -12 (C) ECS Switch, qty - 04, (d) Secondary Speed sensor, Qty - 04 (e Primary Throttle & Secondary throttle, Qty - 04. Quote for Material
Lub oil cooler of both Main engines to be dismantled, chemically cleaned and boxed back with new gaskets. Defective tubes/ cooler to be replaced.System to be pressure tested (1.5 times working pressure) and proved for operation post fitment of coolers. Quote for Service and Material, Payment on actuals
Both Main engine RPM indicator at Wheel house to be Replaced Quote for Service and Material
Fresh water pump suction pipe of both Main engine damaged, to be Replaced Quote for Service and Material
Port and Stbd Diesel Alternator (M/s Cummins India Ltd.) (Running Hours - Port: 4302; Stbd: 3825) - Carry out following 6000 hourly routines on both DA :- (a) Remove intake and exhaust manifold. Clean & pressure test, (b) Remove turbocharger. Clean, inspect & repair with new spares (c) Remove fuel injection pump. Clean, inspect, calibrate & repair with new spares (d) Remove rocker levers & shaft. Clean, inspect & repair with new spares (e) Remove injectors, clean, inspect, repair & calibrate with new spares (f) Remove fuel connections (high pressure pipe lines). Clean, inspect & repair with new spares (g) Remove push rods. Clean, inspect. Replace if required (h) Dismantle cylinder head. Clean, inspect & repair with new spare parts (j) Dismantle one piston & one connecting rod assembly. Replace if required. Based on inspection, undertake inspection of balance piston / connecting rods accordingly (k) Dismantle one liner for inspection of liner outer surface pitting. Replace if required (l) Remove and Replace fresh water Pump, (m) Check vibration damper, rectify all defects. (n) Remove belt tensioner. Clean, inspect & repair with new spare parts (p) Remove & replace fuel feed Pump (q) Replace sea water pump (r) Remove starter motor. Clean, inspect, & repair with new spare parts (s) Replace all hoses of cooling system, air system, lub oil and fuel systems (t) Replace all zinc plugs (u) Tighten all foundation bolts (v) Clean all dismantled parts and cylinder block top position. Assemble engine with all new gaskets / 'o' rings, seals and above dismantle sub-assemblies, (w) Carry out tappet setting. (x) Undertake inspection and cleaning of charge air cooler followed by pressure testing. (y) Remove Heat exchanger, clean & pressure test. (z) Re-flush cooling and lub oil system with fresh coolant and lub oil. (aa) Check all cut-out & safety controls. rectify all defects. (ab) Post completion of routines, Start the engine, check for any oil/ water leakage, exhaust leakage, stop the engine and re-check engine oil level, top up if require. (ac) checks of Local control panel to be carried out, defective components to be replaced. (ad) Insulation checks of alternators to be carried out. (ae) Carry out calibration of AVR, after calibration of AVR undertakes the voltage control test. (af) Carry out load trials with load bank and observe parameters. Note:- Post completion of routines, prove both DA for satisfactory performance. Coolant - fleetguard CC2505 (10 litre), Lub oil - Volvoline 15W40 (100 litre) to be provided by vendor.
Kit for 6000 hourly routines of both DA. Quote for Material
Fuel filter casing body of both DA damaged, to be Replaced Quote for Service and Material
Expansion tanks gauge glass of both DAs to be replaced as per existing model. New gauge glass on both Main engines to be fabricated for expansion tanks. Quote for Service and Material
Both DA expansion tank gauge glass to be renewed as per existing fitted onboard. Quote for Service and Material.
Replace DA Expansion tank. Quote for Material
Port and Stbd Gear Box (Make - Twin Disc, Model- MGX5222DC):- Carry out following 6000 hourly routines:- Carry out following routines:- (a) Change lub oil and lub filter, (b) Overhaul control valve, (c) Clean suction strainer, (d) Overhaul lub oil manifold, (e) Inspect primary and secondary shaft assemblies, (f) Replace primary and secondary clutch plate, (g) Grease the oil seal on the output end of the output shaft through the grease filling with water pump, (h) Check shaft oil seal for leakage, renew if defective, (j) Renew all zinc rods, (k) Lub oil coolers to be removed, chemically cleaned, pressure tested and refitting, (l) Sea water leakage observed from gear box lub oil cooler, leakage to be rectified. (m) Carry out overhauling of Control panels. (n) Carry out SDC checks of both Gear box assembly, rectify defects if any. (m) Replace temperature and pressure guages of both Gear box. (p) Renewal of all flexible hoses, durrets and clamps and fittings for both Main Gearboxes. System to be proved for satisfactory performance. Quote for service. Note:- Lub oil - Servopremium 20W40 (80 litres) to be provided by vendor
Kit for 6000 hourly routines of both Gear boxes. Quote for Material, Payment on actuals
Fuel and Lub Oil Centrifuge (Make- GEA Westfalia, Model-OTC2-02-137):- Carry out complete overhauling (Major overhauling) of both centrifuges and Replace all worn out parts including instrumentation guages. Change lub oil of both centrifuges. Post completion of routines, trials to be undertaken and system performance to be proved for Satisfactory operation. Quote for Service. Note:- Lub oil - ServoPremium 150 to be provided by vendor
Fuel/ Lub oil Purifier - Major service kit Quote for Material, Payment on actuals
Service kit for pump Quote for Material
Carry out overhauling of Starting control panels of Fuel/ Lub oil Centrifuge. Quote for Service and Material
OWS (Make-Victor Marine Model-CS 500):- Carry out following routines / work on Oily water separator: - (a) Undertake full servicing of the equipment including pump overhauling (b) Replace the first stage coalescer pack (c) Replace the advanced Granular media (d) Restore interior coating. (e) Overhauling of pneumatic 1st and 2nd stage oil dump valve. (f) Overhauling and pressure testing of water valve (20 psi) and pressure relief valve (50psi) to be carried out. (g) Recalibration of 15 ppm monitor to be carried out. Prove system for satisfactory operation. Quote for Service.
5 yearly Kit for Major overhauling of OWS. Quote for Material, Payment on actuals
Carry out overhauling of Starting control panel. Quote for Service and Material
Reciprocating Air Compressor (Make - Elgi, Model- LG 02 100 (MD Comp) :- Carry out following routines:- (a) Replace all pressure gauges (Qty 04), (b) Carry out complete major overhauling of compressor including motor. (c) All cut-outs to be Replaced and proved for operation. (e) Renew lub oil (d) Performance trials to be conducted and system to be proved for satisfactory. Quote for Service. Note:- Lub oil - Servo prime 150 (10 litre) to be provided by vendor.
Reciprocating air Compressors, Make- Elgi (Model LG 02 100) - Kit, Complete overhaul Quote for Material, Payment on actuals
Unloader valve of Air compressors defective / malfunctioning. To be replaced. Quote for Service and Material
CO2 Fire Fighting System - Carry out following routine/works :- (a) Replace all flexible hoses. (b) Overhaul non-return valves and safety stop valves. (c) Remove and inspect cylinder operating heads, test for correct functioning. Rectify all defects. (d) Carry out weight test of all CO2 cylinders, refill gas if required. (07 Main cylinders and 03 pilot cylinders). (e) CO2 control panels malfunctioning, to be Replaced. (g) CO2 fire fighting system bottles to be pressure tested at 1.5 times of working pressure (07 Main cylinders and 03 pilot cylinders). (h) Blow out all distributing piping with LP air to make sure that it is not blocked. (j) Calibrate pressure gauges fitted in the system. (K) Check Audio Visual Alarm Function of CO2 system, Limit Switches In Control Panel for Operation, Replaced if defective. (l) CO2 fire fighting system to be proved for satisfactory performance. Quote for Service and Material separately
Shafting: - Carry out following works/ routines on both Shafts and propellers:- (a) Clean, polish and grease both propellers and Shaft line. (b) Examine both shaft and propeller for any damage, cracks and wear down, repair as necessary. (c) Locking mechanism of both shaft to be overhauled. (d) Undertake sample inspection of one Plummer block bearings on each shaft line for scoring/corrosion. In case any abnormality is observed, carry out inspection of balance Plummer bearings on the both shaft line. Rectify all defects. (e) Rope guards to be removed and examine ‘A’ bracket bushes/ bearing clearance for wear down. Replace defective bushes/ bearings if wear down not within limit. (f) Dismantle and replace deep sea seal with new (Make & Model - Wartsila PSE145) (g) Examine the shaft bearings clearances for wear down of both ‘A’ bracket and Stern tube, replace with new bearings if not within limit. (h) Replace Lub oil of all Plummer blocks. (j) Both Shaft RPM indicator at Wheel house Non-ops, to be Replaced. (k) Shaft cooling system for both Stern gland defective. Suspect blockage in cooling line, defect to be rectified. (l) Post completion of routines, Trials of shafting to be undertaken. System to be proved for satisfactory operation. Quote for Service and Material separately
AVCAT Striping Pump (Make:- Tushaco Pumps, Model:- T3ST-45 /46, 6 TPH (Type- Screw pump), Qty-02):- Following works to be carried out:- (a) Remove suction and discharge pipe flange fasteners, coupling bolt of motor coupling. (b) Remove pump foundation bolts and take out pump from motor. (c) Motor drive end and driven end bearings to be replaced. (d) Motor load trials to be undertaken prior assembly, followed by SPM checks. (e) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (f) Motor windings to be fabricated with high temperature cut out. (g) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Relays, MCBs, single phase preventer, timers and any control components defective to be replaced. (h) Remove both side covers of pump and remove driver screw and drive screw with bearing and mechanical seal. (j) Replace mechanical seal, bearings and seals of pump. (k) Inspect screws and casing of pump for wear down, replace if required. (l) Clean all parts post inspection and assemble. (m) Replace suction and discharge pressure gauge (-2 to 7) kg/cm2 & (0 to 10) kg/cm2 along with fittings. (n) Removal, overhauling and pressure testing of relief valve to 1.5 times of discharge pressure (p) Re-fitment of pump and motor on foundation and alignment to be carried out. System to be proved for satisfactory performance i.e discharge pressure and flowrate of pump post overhauling should be 3 Kg/cm2 and 6.0 M3/Hr . Quote for Service and Material Separately
Cargo LSHSD Pump No.1 & 2 (Make:- Tushaco Pumps, Model:- TDSH-118/064, type- Screw Pump):- Following works to be carried out:- (a) Remove suction and discharge pipe flange fasteners, coupling bolt of motor coupling. (b) Remove pump foundation bolts and take out pump from motor. (c) Motor drive end and driven end bearings to be replaced. (d) Motor load trials to be undertaken prior assembly, followed by SPM checks. (e) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (f) Motor windings to be fabricated with high temperature cut out. (g) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Relays, MCBs, single phase preventer, timers and any control components defective to be replaced. (h) Remove both side covers of pump and remove driver screw and drive screw with bearing and mechanical seal. (j) Replace mechanical seal, bearings and seals of pump. (k) Inspect screws and casing of pump for wear down, replace if required. (l) Clean all parts post inspection and assemble. (m) Replace suction and discharge pressure gauge (-2 to 7) kg/cm2 & (0 to 10) kg/cm2 alongwith fittings. (n) Removal, overhauling and pressure testing of relief valve to 1.5 times of discharge pressure (p) Re-fitment of pump and motor on foundation and alignment to be carried out. System to be proved for satisfactory performance i.e discharge pressure and flowrate of pump post overhauling should be 4 Kg/cm2 and 60 M3/Hr. Quote for Service and Material Separately
Cargo Avcat Pump No.1 & 2 (Make:- Tushaco Pumps, Model:- TDSH-105/058, Type- Screw Pump):- Following works to be carried out:- (a) Remove suction and discharge pipe flange fasteners, coupling bolt of motor coupling. (b) Remove pump foundation bolts and take out pump from motor. (c) Motor drive end and driven end bearings to be replaced. (d) Motor load trials to be undertaken prior assembly, followed by SPM checks. (e) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (f) Motor windings to be fabricated with high temperature cut out. (g) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Relays, MCBs, single phase preventor, timers and any control components defective to be replaced. (h) Remove both side covers of pump and remove driver screw and drive screw with bearing and mechanical seal. (j) Replace mechanical seal, bearings and seals of pump. (k) Inspect screws and casing of pump for wear down, replace if required. (l) Clean all parts post inspection and assemble. (m) Replace suction and discharge pressure gauge (-2 to 7) kg/cm2 & (0 to 10) kg/cm2 alongwith fittings . (n) Removal, overhauling and pressure testing of relief valve to 1.5 times of discharge pressure (p) Re-fitment of pump and motor on foundation and alignment to be carried out. System to be proved for satisfactory performance i.e discharge pressure and flowrate of pump post overhauling should be 4 Kg/cm2 and 40 M3/Hr. Quote for Service and Material Separately
Steering Gear (Make - Geeta Engineering, Model-TR2C-2 x 2.1.35) :- Carry out following routine/works on Steering gear: - (a) Replace filter cartridge of hydraulic oil system. (b) Replace Suction filter element. (c) Lubricate steering gear assembly. (d) Check hydraulic system pressure, rectify defect if not within limit. (e) Clean hydraulic oil tanks, refill with fresh hydraulic oil (Qty- 03) (f) Rectify leakages in hydraulic system. (g) Overhaul both steering hydraulic cylinders. (h) Overhaul the steering pump motor, replace defective components. (j) Clean, check helm indicator unit, steering operating switch indicating rudder angle feed back unit. (k) Check and test alarm indicating unit for correct operation, replace defective components. (l) Replace all hydraulic hoses in the system. (m) Replace all pressure and temperature gauges in the system. (n) Check coupling between pump and motor, change if necessary. (p) Rudder angle indicator at wheel house to be Replaced. (q) Carry out overhauling of Starting control panels. (r) Overhaul both Main pumps. System to be proved for satisfactory performance as per designed output. Note:- Hydraulic oil - Servo premium HYD 68 (80 Litres) to be supplied by vendor Quote for Service and material separately.
Steering gear-During movement of the vessel hydraulic oil of RU Tanks shifts from port tank to stbd tank and vice versa. An isolation valve may be provided for the same. System to be proved for satisfactory operation. Quote for Service and Material
Steering gear-Oil leakage observed on both RAM cylinders of steering gear. Gaskets to be replaced and prove for satisfactory operation. Quote for Service and Material
Kit for 5 yearly routines of Steering gear. Quote for Material
Rudder angle indicator back light not working and sluggish response at wheel house. Defect is to be rectified. Quote for Service and Material
Steering gear follow-up mode not working from wheel house. Defect to be rectified. Quote for Service and Material
Carry out checks of Steering gear control Panel in both wheel house and steering gear compartment. Rectify defect, if any. Quote for Service and Material
Rudder:- Carry out following works on both Rudders (a) Surface preparation to be undertaken for survey of both Rudder structure including hull plating in the vicinity of rudders, fitting upto the rudder head, for signs of corrosion, defects and damage. Defects to be rectified as per survey report. (b) Check clearances of lower and upper bearings. Replace bearings if not found in limit (Make - feroform T14, Max clearance limit - 1.2 mm) (c) Rudder pintle bearings to be fully lubricated before undocking. (d) Paint to be restored on rudder and hull plating in the vicinity of rudder shaft and brackets, Rudder fittings up to rudder head and keel as per existing paint scheme. (e) Replace all packings of both Rudders. Note: Payment to be made on actuals. Quote for Service and Material separately
Bilge / Ballast Pump (Make:- Jhonsons, Model:- CV-65-160):- Following works to be carried out:- (a) Remove suction and discharge pipe flange fasteners, coupling bolt of motor coupling. (b) Remove pump foundation bolts and take out pump from motor. (c) Motor drive end and driven end bearings to be replaced. (d) Motor load trials to be undertaken prior assembly, followed by SPM checks. (e) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (f) Motor windings to be fabricated with high temperature cut out. (g) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Relays, MCBs, single phase preventor, timers and any control components defective to be replaced. (h) Remove impeller lock nut and take out the impeller. (j) Remove mechanical seal. (k) Remove bearing cover from other side and take out shaft. (l) Replace mechanical seal and bearings. (m) Clean all parts post inspection and assemble. (n) Replace suction and discharge pressure gauge (-2 to 7) kg/cm2 & (0 to 10) kg/cm2 alongwith fittings . (p) Re-fitment of pump and motor on foundation and alignment to be carried out. (q) pump casing and impeller to be replaced. System to be proved for satisfactory performance i.e discharge pressure and flowrate of pump post overhauling should be 3.5 Kg/cm2 and 60 M3/Hr. Quote for Service and Material separately
Fuel Oil/ Lub oil Transfer Pump (Make- Tushaco Pumps. Model:- T3ST-45/46, Type- Screw Pump) - Following works to be carried out:- (a) Remove suction and discharge pipe flange fasteners, coupling bolt of motor coupling. (b) Remove pump foundation bolts and take out pump from motor. (c) Motor drive end and driven end bearings to be replaced. (d) Motor load trials to be undertaken prior assembly, followed by SPM checks. (e) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (f) Motor windings to be fabricated with high temperature cut out. (g) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Relays, MCBs, single phase preventor, timers and any control components defective to be replaced. (h) Remove both side covers of pump and remove driver screw and drive screw with bearing and mechanical seal. (j) Renew mechanical seal, bearings and seals of pump. (k) Inspect screws and casing of pump for wear down, replace if required. (l) Clean all parts post inspection and assemble. (m) Replace suction and discharge pressure gauge (-2 to 7) kg/cm2 & (0 to 10) kg/cm2 alongwith fittings . (n) Re-fitment of pump and motor on foundation and alignment to be carried out. System to be proved for satisfactory performance i.e discharge pressure and flowrate of pump post overhauling should be 2 Kg/cm2 and 6.0 M3/Hr. Quote for Service and Material separately
Emergency Fire Pump (Make:-Jhonsons, Model:- CH-80-400) - (a) Following works to be carried out:- (a) Remove suction and discharge pipe flange fasteners. (b) Remove pump foundation bolts and take out pump. (c) Overhauling of prime mover (engine part) to be carried out. (d) Injectors to be calibrated. (e) Renew fuel filter, lub oil filter and lub oil. (f) Renew air cleaner element. (g) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Relays, MCBs, single phase preventer, timers and any control components defective to be replaced. (h) Dismantle pump and carry out overhauling. (j) Renew mechanical seal, bearings and seals of pump. (k) Clean all parts post inspection and assemble. (l) Replace suction and discharge pressure gauge (-2 to 7) kg/cm2 & (0 to 10) kg/cm2 alongwith fittings. (m) Re-fitment of pump and on foundation and alignment to be carried out with engine. (n) Removal, overhauling and pressure testing of relief valve to 1.5 times of discharge pressure. System to be proved for satisfactory performance i.e discharge pressure and flowrate of pump post overhauling should be 8 Kg/cm2 and 30 M3/Hr. Quote for Service and Material separately
GS/Fire Pump (Make:- Jhonsons, Model:- CV-40-250, 30 TPH) - Following works to be carried out:- (a) Remove suction and discharge pipe flange fasteners, coupling bolt of motor coupling. (b) Remove pump foundation bolts and take out pump from motor. (c) Motor drive end and driven end bearings to be replaced. (d) Motor load trials to be undertaken prior assembly, followed by SPM checks. (e) Insulation checks to be undertaken and rewinding of the motor to be undertaken if low insulation. (f) Motor windings to be fabricated with high temperature cut out. (g) Continuity and insulation checks of Starting panel of the PUMP to be carried out. Relays, MCBs, single phase preventor, timers and any control components defective to be replaced. (h) Remove impeller lock nut and take out the impeller. (j) Remove mechanical seal. (k) Remove bearing cover from other side and take out shaft. (l) Renew mechanical seal and bearings. (m) Clean all parts post inspection and assemble. (n) Replace suction and discharge pressure gauge (-1 to 3) kg/cm2 & (0 to 6) kg/cm2 alongwith fittings . (p) Re-fitment of pump and motor on foundation and alignment to be carried out. (q) Removal, overhauling and pressure testing of relief valve to 1.5 times of discharge pressure. (r) pump casing and impeller to be replaced. System to be proved for satisfactory performance i.e discharge pressure and flowrate of pump post overhauling should be 8 Kg/cm2 and 30 M3/Hr. Quote for Service and Material separately
Fresh water Hydrophore Pump to be replaced with DESMI pump (Model - DESMI DPV2-50, PN -16) Quote for Service and Material separately
Hinges to be provided/fabricated on chequred plates of engine room for operating system valves. Quote for Service and Material
Fresh water Hydrphore tank (Cap- 500 ltr) :- Carry out cleaning of tank followed by complete surface preparation to SA 2.5 standards. Thereafter, complete renewal of paint scheme of M/s jotun i.e pengaurd HB White/ grey/ white (3 no. coat x 100 DFT ) Renew pressure gauges. Range - (0 to 7) kg/cm2. Minor air leakage observed in system, to be rectified. Quote for Service and Material separately
Lub oil Service tank (Cap- 250 ltr) :- Carry out cleaning of tank followed by complete surface preparation to SA 2.5 standards. Thereafter, complete renewal of paint scheme of M/s jotun i.e tank gaurd HB Light grey and greyish green (2 no. coat x 150 DFT ). Renew pressure gauges. Range - (0 to 7) kg/cm2. Minor air leakage observed in system, to be rectified. Quote for Service and Material separately
Portable Gensets (Make- Birla Ecogen, Model- EG3000AS Petrol engine, 1.6 KVA) - Overhaul Emergency generator set including calibration of instrumentation. Proved for satisfactory operation. Carry out overhauling of Starting control panel. Quote for Service and Material separately
DD pump (Make- Perfect, 40 TPH):- Overhaul pump including calibration of instrumentation gauges. Fuel feed pump suspected defective, to be Replaced. Suction and discharge hoses damaged, to be renewed. Quote for Service and Material separately
Analog flow meters in cargo system defective, to be Replaced (100 NB @ 80-100 CU.M/HR). (Qty 10). Quote for Service and Material separately
Various system valves wheel corroded / damaged. Valve wheels to be Replaced as per sample. Quote for Service and Material
Remote operation of fuel shut off valves observed to be sub-optimal. The same is to be overhauled including associated fittings. Trials of system to be undertaken for optimal performance. Quote for Service and Material
Split ACs fitted in Wheel House to be Replaced. New Split AC to be installed/ fabricated in Master and ED cabin. Cap- 2 TR). Quote for Service and Material
Forward pump room bilge pump(Make-BE Pump 8510KKL0S2316) along with motor to be overhauled. System to be proved for satisfactory performance i.e discharge pressure and flowrate of pump post overhauling should be 3.5 Kg/cm2 and 60 M3/Hr.Quote for Service and Material separately
Forward DD fire pump (Make- Jhonsons, Model- CV 40-250) not working, pump to be overhauled including engine part. System to be proved for satisfactory performance i.e discharge pressure and flowrate of pump post overhauling should be 8 Kg/cm2 and 30 M3/Hr. Quote for Service and Material separately
System Pipelines :- Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(4 kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanised Steel - 150mm). Note:- paint scheme of pipeline(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
System Pipelines:- Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(4 kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanised Steel - 80mm). Note:- paint scheme of pipeline(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
System Pipelines:- Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(4 kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanised Steel - 65mm). Note:- paint scheme of pipeline(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
System Pipelines:- Removal, chemical clean and repair system pipelines to be undertaken, followed by pressure testing to 1.5 times working pressure(4 kg/cm2). Thereafter undertake fitment onboard and prove for designed performance (Galvanised Steel - 50mm). Note:- paint scheme of pipeline(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
System Pipelines:- Renew with end fittings of Air Vent & Filling System (150mm) (Carbon Steel), pressure test to 1.5 times working pressure(4kg/cm2), fit onboard and prove. Note:- paint scheme of pipeline(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
System Pipelines:- Renew with end fittings of Air Vent & Filling System (100mm) (Carbon Steel), pressure test to 1.5 times working pressure(4kg/cm2), fit onboard and prove. Note:- paint scheme of pipeline(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Sea Water Pipeline:- Replace with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (150mm) (C-Ni), pressure test to 1.5 times working pressure(8 kg/cm2), fit onboard and prove. Note:- paint scheme of pipeline(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (125mm) (C-Ni), pressure test to 1.5 times working pressure(8 kg/cm2), fit onboard and prove. Note:- paint scheme of pipeline(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (100mm) (C-Ni), pressure test to 1.5 times working pressure(8 kg/cm2), fit onboard and prove. Note:- paint scheme of pipeline(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (80mm) (C-Ni), pressure test to 1.5 times working pressure(3.5kg/cm2), fit onboard and prove. Note:- paint scheme of pipeline(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (65mm) (C-Ni), pressure test to 1.5 times working pressure (3.5 kg/cm2), fit onboard and prove. Note:- paint scheme of pipeline(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Sea Water Pipeline:- Renew with end fittings of Fire Fighting, Bilge, Fuel Oil, Ballast , Sea Water Cooling system (45mm) (C-Ni), pressure test to 1.5 times working pressure(3.5kg/cm2), fit onboard and prove. Note:- paint scheme of pipeline(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(8Kg/cm2) and fitment of 100mm SDNR valves with pinion drive assembly. Note:- paint scheme of valves (outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(8Kg/cm2) and fitment of 100mm SDNR valves.Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(8Kg/cm2) and fitment of 150mm SDNR valves with pinion drive assembly. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(8Kg/cm2) and fitment of 150mm SDNR valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(3.5Kg/cm2) and fitment of 40mm SDNR valves with pinion drive assembly. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(3.5Kg/cm2) and fitment of 65mm SDNR valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(3.5Kg/cm2) and fitment of 65mm SD valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(3.5Kg/cm2) and fitment of 80mm Butterfly valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(3.5Kg/cm2) and fitment of 80mm SDR valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(8Kg/cm2) and fitment of 125 mm Gate valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(8Kg/cm2) and fitment of 150 mm Butterfly valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(8Kg/cm2) and fitment of 125 mm Butterfly valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(3.5Kg/cm2)and fitment of 65 mm Butterfly valve valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(3.5Kg/cm2) and fitment of 100 mm Butterfly valve valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(8Kg/cm2) and fitment of 125 mm SDNR valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(8Kg/cm2) and fitment of 100 mm Gate valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(2Kg/cm2) and fitment of 45 mm Butterfly valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Valves:- Removal, overhauling, pressure test to 1.5 times of working pressure(6Kg/cm2) and fitment of 80 mm NR valves. Note:- paint scheme of valves(outer surface) to be renewed prior fitment as per existing paint scheme. Quote for Service and Material
Supporting clamps for Cargo system valves deteriorated, to be Replaced. Quote for Service and Material
Replace of hot lagging with metallic cladding for DA and Main Engine exhaust system pipeline. Material- MWMB. Quote for Service and Material.
Suction and discharge pressure gauges of various system lines to be Replaced:- (a) Range:- 1 to 2 kg/cm2 (Qty 06) (Vertical mounted), (b) Range: 1 to 6 kg/cm2 (Qty 08) (Vertical mounted), (c) Range: 1 to 10 kg/cm2 (Qty-06) (Back mounted), (d) Range 1 to 40 kg/cm2 (Qty 04) (Back mounted) Quote for Service and Material
Pressure gauges line of various system perished. Pipeline to be replaced. Dia-5 mm. Mat-copper. Quote for Service and Material
Rubber bellow and durites of both Main Engines, DAs and all auxiliaries are to be Replaced as per sample:- (a) Sea water bellow- Dia-65 mm, Qty-06, Length-0.5 mtr. (b) Sea water Durites- Dia-45 mm, Qty-08, Length-0.25 mtr. (c) Sea water durites- Dia-65 mm, Qty-04, Length-0.25 mtr. (e) Sea water bellow- Dia-80 mm, Qty-04, Length-0.5 mtr. Quote for Service and Material
Lub oil hand pumps of both Main engine and DA to be overhauled. Quote for Service and Material
Complete Remote operation of LSHSD and AVCAT cargo system valves using rod gearing (from upper deck to tank compartment) hard to turn. Valves along with valve wheels, rod gearings arrangement (knuckle joints, gear boxes ) to be overhauled. (Size- 100 mm, Type- Butterfly, Qty- 16 and Size- 40 mm, Type- Screw down, Qty- 10). Quote for Service and Material separately Note:- Corroded knuckle joints and gear boxes to be replaced.
AVCAT filter housing alongwith filter element to be replaced view heavy deterioration and cracks. Make- M/s Delta. Quote for Service and Material
Spare AVCAT filter elements to be provided. Make- M/s Delta. Quote for Material
Zinc plugs of system lines, coolers and auxiliary equipment to be Replaced as per the sample. Quote for Service and Material
Both bilge pump self priming unit line adaptor corroded. Adaptor to be manufacture as per sample. Quote for Service and Material
Following Hand bilge pumps not working, to be overhauled:- (a) Steering room hand bilge pump- 01 (b) Dirty lub oil tank hand bilge pump- 02. Quote for Service and Material
Following valves are highly detoriarated/ damaged, to be replaced:- (a) 20mm SDNR, Mat- GM, Qty- 09 (b) 15mm SD, Mat- GM, Qty- 12. Quote for Service and Material
Following valves are highly detoriarated/ damaged, to be replaced:- (a) 200mm SDNR, Mat- GM, Qty- 02 (b) 150mm SD, Mat- GM, Qty- 02. Quote for Service and Material
Funnel Cover- Canvas funnel cover for DA and Main Engine to be supplied as per design. Quote for Material
Both Main engine Throttle lever at wheel house defective, to be overhauled. System to be proved for correct functioning. Quote for Service and Material
Fasteners (Nut & Bolt) of various System pipelines and Valves to be replaced with Stainless Steel (SS). Size- M8 to M32, Qty- 600. Quote for Service and Material Note :- payment to be made on actual
Loctite/ Sealants for Maintenance of Main engine/ DAs:- (a) Loctite 243 thread locker 50 ml, Qty- 15 (b) Loctite 542 thread sealant 50 ml, Qty- 15 (c) Loctite 577 thread Sealant 50 ml, Qty- 15 (d) Loctite 574 flange Sealant 50 ml, Qty-15 (e) Loctite 638 New retainer 50 ml, Qty- 15. (f) Loctite 406 Instant adhesive 20 gm, Qty- 15. (g) Loctite SF7840 natural blue 5 ltr, Qty- 05. (h) Loctite freeze and release LB 8040 310 gm, Qty- 20. (j) Loctite 8008 C5-A-LB, Qty- 10. Quote for Material
Main Switch board and Group Starter Panel 1&2:- Following works to be carried out: - (a) Undertake calibration of instrument panel/ meters fitted on MSB (Qty- 13), Defective meters to be renewed. (b) Replace bus bar insulators (Qty 06). (c) Carryout calibration of all breakers, RPR/ UVR relay, CT, PT and other protection circuit, replace defective relays/ components. (d) Replace defective lugs, connector and wiring. (e) Earth fault parameter with hooter to be checked and proved. (f) Synchronising panel to be overhauled and proved. (g) Transformer changing breaker to be proved. All defects to be rectified subject to QC checks. (h) 03 in no. SWBD panel light (230V, 25W tubelight) defective to be Replaced. (j) Panel door to be replaced including locking arrangement of the same. (k) Earthing cable and earthing point to be replaced. Quote for Service and Material separately
Echo Sounder (Model - GDS 101, Raytheon Anschutz GMBH, Germany) - (a)Undertake calibration of main recorder, repeater and prove system as per designed performance. Replace defective components with new or upgraded version, as per feasibility. (b) Examine the transducer and casings. Preserve the transducer surface during dry-docking. Carry out visual examination of the transducer cables, check continuity and insulation. Replace defective components. All defects to be rectified subject to QC checks (c) Transducer, display panel and cabling to be replaced. (d) Transducer gasket to be repaced. Quote for Service and Material separately
VHF-DSC, Sailor 6222 (Thrane & Thrane), Denmark - (a)Undertake calibration of the system and prove system as per designed performance. All defects to be rectified subject to QC checks. (b) Microphone including microphone cable to be replaced. (c) Antenna and cabling to be replaced. Quote for Service and Material separately
Search & Rescue Transponder, (Make-Thrane & Thrane, Model- SART II), Denmark - SART to be replaced, Qty- 02. Quote for Material.
Inverter cum battery charger for emergency back up supply unit not working, to be replaced. Channel modules and invertor system to be proved. Control panel push buttons and keys to be replaced. Digital meter to be replaced. All defects to be rectified subject to QC checks. Quote for Service and Material
Talk back system- Speaker (08 nos)and microphone (08 nos) not working. To be replaced. System to be checked for satisfactory performance. All defects to be rectified subject to QC checks. Quote for Service and Material
Air Whistle-Air Whistle and Electric Horn not working. To be Replaced to latest version along with panel and prove system for both electrical and pneumatic mode. Quote for Service and Material
(a) Trans Rectifier Unit to be Overhauled. System to be proved for satisfactory performance. (b) Ventilation arrangement for panel to be carried out. © Ammeter and Voltmeter to be replaced. (d) 05 nos MCB's defective. To be replaced. (e) 01 nos 415V 63A MCCB defective. to be replaced. (f) 20 nos connector defective to be replaced. All defects to be rectified subject to QC checks. Quote for Service and Material separately
Navigation light control panel-Carry out repair of the panel and prove system for both (230V AC & 24V DC) operation. PCBs, switches and indicator lamps to be proved. All defects to be rectified subject to QC checks.. Replace defective Navigation lights including (230V AC and 24V DC, 60W 12 in no. each). Quote for Service and Material
Following work on Window wiper to be carried out: - (a) 02 nos Motor not getting start, to be replaced. (c) 02 nos rotary switch defective, to be replaced. (d) Window wiper along with rubber beading to be Replaced. (e) Wiper control panel to be overhauled. Replace all defective lamps and switches. Complete system to be proved for satisfactory operation. Quote for Service and Material
Magnetic compass- Magnetic compas to be calibrated and all defects to be rectified. Compass to be proved for satisfactory performance of QC checks. Quote for Service and Material
Sound power telephone at various locations are not working. To be replaced with new telephones of equivalent standard and proved for satisfactory operation. Quote for Service and Material
Clear view screen in wheel house not working, to be Replaced. Quote for Service and Material
BNWAS- BNWAS system not working, to be repaired. Quote for Service and Material
Both EOT(ET 44-00A) at engine room and wheel house are not working, to be replaced with new or upgraded version. Quote for Service and Material
Battery charger- (a) Carry out overhauling of the battery charger (b) Replace defective components and cooling devices (c) Provision for interconnection of battery charger to be provided (d) 02 nos ammeter and 02 nos voltmeter defective, to be replaced with same specifications. (e) 14 nos push buttons defective, to be replaced. (f) 04 MCB defective, yo be replaced. (g) System to be proved for satisfactory performance. (h) All defects to be rectified subject to QC checks. Quote for Service and Material
Emergency light-Emergency light fittings (24V DC, 40W) at various locations not working, to be replaced. Job also involves renewal of fitting at 40 locations. Additionally, change over contactor, control wiring and cables to be checked and proved for satisfactory operation. Quote for Service and Material
Search light- 02 no. search light (1000W) not working. To be replaced and rotating mechanism of both search lights defective, to be repaired. Job involves replacement of securing brackets and fitment. Cable conduit to be replaced. Quote for Service and Material
Calibration of AFDS sensors/system(Make - Autoonica) to be undertaken and defective sensors to be replaced. Operator panel BS -210 to be replaced, if panel found obsolete then same to replaced with upgraded version. Serviceability checks of AFDS system to be undertaken. System to be proved for satisfactory performance. All defects rectified are subjected to QC checks. Quote for Service and Material
Tank content gauges control panel (Nivo system) (Qty 03 Panels) observed to be defective. Functional checks of all gauges to be carried out. Check wiring connections at terminals of sensor, JB, termination Box, tank content indicator, Central Display unit, alarm annunciator panel and bilge level swtich for physical tightness. Check mechanical mounting and fitting of sensor JB, termination Box, tank content indicator, Central Display unit, alarm annunciator panel and bilge level swtich. Defective components and sensors to be replaced. Tank level calibration to be undertaken. Serviceability checks and calibration of display module to be undertaken. All defects to be rectified subject to QC checks. Quote for Service and Material
40 TPH submersible pump- switch (415V, 18A) observed to be faulty. To be Replaced. Quote for Service and Material
Engine room lighting system- Tube light fitted in engine room defective. All lights to be replaced with LED (18W) tube light. Job also involves replacement of securing brackets at 72 locations. Quote for Service and Material
Flood lights (200W Bulb, 230V) fitted on upper deck (including canopy lights) and Engine Room not working, to be replaced as per sample. Quote for Service and Material
Deck lights (230V, 60W) and Deck lights guard / fitting are broken. To be replaced as per sample. Job involves replacement of securing arrangement and fitment. Quote for Service and Material
Switches 12 in no. switches (230V, 6A) at various location defective. To be Replaced. Quote for Service and Material
Water tight rotary switch- 15 in no. rotary switch(230V, 5A) at various location defective. To be Replaced. Quote for Service and Material
Sockets- 15 in no. sockets(230V, 6A) at various location defective. To be Replaced. Quote for Service and Material
Tubelight (20W) fitted onboard at various locations to be replaced with LED (18W) tube lights. Job also involves Replacement of securing brackets at 60 locations. Quote for Service and Material
GPS (Simrad-MX 512), Navico, Australia - Display of the unit blurred, display to be replaced with new. undertake calibration of the system and prove system as per designed performance. All defects to be rectified subject to QC checks. Quote for Service and Material
Radar (Koden-MDC 2910P/2920 P)-Undertake calibration of the system and prove system as per designed performance. 16 nos relays to be replaced. All defects to be rectified subject to QC checks. Quote for Service and Material
Following domestic equipment to be Replaced:- (a) Hot Water Boiler (210trs), (b) Microwave Oven (23 ltrs), (c) RO Purifier (20 ltrs), (d) Deep Freezer (300 ltrs), (e) Refrigerator (300 ltrs). Quote for Service and Material
PA system (Make-M/s Ahuja) -Following work on PA system to be carried out:- (a) Amplifier unit to be replaced with same or upgraded version. (b) 05 nos. microphone and 05 nos speakers to be Replaced. (c) Remote panel of PA system to be overhauled, all defective components to be Replaced and system to be proved for satisfactory performance. Quote for Service and Material
Exhaust fan & blowers:- Carry out overhauling of following Ventilation motors along with starters:- (a) E/R ventilation blower, 5.2 KW, Qty- 02 (b) Galley ventilation blower, 0.37 KW, Qty- 02 (c) Pump room ventilation blower, 0.56 KW, Qty- 02 (d) Engg/ Elect store blower, 0.1 KW, Qty- 02. Quote for Service and Material
Engine room ventilation motor with impeller (7.5HP) to be replaced. Quote for Service and Material
Accommodation space ventillation blowers (0.37 KW) and Bathroom blower( 0.14 KW) non-ops, overhauling of ventillation blowers motor including Starter to be carried out. Quote for Service and Material
Fire fighting spray jet nozzles observed to be defective. The same need to be replaced as per sample. Quote for Material.
Sea water suction and Fuel system Strainers to be manufactured as per sample. Paint with epoxy coating. Mat- SS. Quote for Material.
Fuel hoses are to be replaced with new fuel hose with end fittings as per Navy standards (as per sample), length - 20m, Dia- 4 inches. Quote for Material.
Fuel hoses are to be replaced with new fuel hose with end fittings as per Navy standards (as per sample), length - 10m, Dia- 4 inches. Quote for Material.
Fuel hoses are to be replaced with new fuel hose with end fittings as per Navy standards (as per sample), length - 10m, Dia- 2 inches. Quote for Material.
EPIRB - System calibration to be undertaken. Certificate to be provided. Battery to be replaced. Quote for Material.
Wall mounted fans defective in accommodation area and wheel house. To be replaced as per sample. Make -Orient, Size- 12'' Quote for Material
Pesto flash(Insect killer) in dining area to be renewed. Quote for Material.
Nicole lacquer. Quote for Material
Personnel protection gear kit- Helmet. Quote for Material
Personnel protection gear kit- Gloves. Quote for Material
Personnel protection gear kit- Goggles. Quote for Material
Personnel protection gear kit- Ear defender. Quote for Material
Personnel protection gear kit- Mask. Quote for Material
Engineering and Electrical log books with covers as per sample to be printed. Quote for Material
Shore supply Cable (50 Sq mm,3 Core) defective. To be supplied as per sample. Quote for Material
Cotton rags (for cleanship). Quote for Material
DA breaker with EOM (400A/ 3 pole), Make- L& T. Quote for Material
Shore supply breaker (125A/ 3 pole), Make- L&T defective. To be supplied. Quote for Material
Supply breaker- (a) 125A, 415V, Qty-02 (b) 160A,415V, Qty-02. Quote for Material
Antiflash lamps with fittings to be fitted in pump room. Quote for Service and Material
Rubber mat for electrical equipments to be Replaced. Thickness- 10mm. Quote for Service and Material
Starter for 40TPH and 20TPH Submersible pump. Qty- 03 each. Quote for Material
Forward pump room portable battery charger(1 KW) to be overahuled. Quote for Service and Material
Submersible pump socket to be Replaced. (415V, 18A). Quote for Service and Material
Digital Multimeter, Make- FLUKE 115. Quote for Material
EMC 38 Digital Motor Checker, Make- FLUKE. Quote for Material
Sounding tube caps/ covers of all LSHSD and AVCAT cargo tanks deteriorated, to be Replaced as per sample. Quote for Material
Man hole cover handles of all LSHSD and AVCAT cargo tanks damaged, to be Replaced. Quote for Service and Material
Portable Submersible Pump(Make-Mody Pumps, 20TPH) - (a) Overhauling of portable submersible pump to carried out alongwith startor and motor part. (b) Male-female brass coupling of pump and starter to be renewed. System to be proved for satisfactory performance i.e capacity of the pump to be proved to 20 TPH and flow certification may be provided for the same. Quote for Service and Material
Portable Submersible Pump(Make-Mody Pumps, 40TPH) - (a) Overhauling of portable submersible pump to carried out alongwith startor and motor part. (b) Male-female brass coupling of pump and starter to be renewed. System to be proved for satisfactory performance i.e capacity of the pump to be proved to 20 TPH and flow certification may be provided for the same.Quote for Service and Material
Ammeter- 0-150A, 96x96mm- To be replaced as per sample. Quote for Material
Volt meter- 0-550V, 96x96mm -To be replaced as per sample. Quote for Material
Frequency meter- 45-50-55 Hz -To be replaced as per sample. Quote for Material
KW-meter-0.75KW-96x96mm -To be replaced as per sample. Quote for Material
Portable PA system as per sample to be Replaced. Quote for Material.
Portable GPS to be provisioned. Quote for Material
Magnetic Pickup (MPU) of Cummins DA (80Kw). Quote for material
Portable Battery charger, Input Rating - 415V/16A/50Hz AC Output Rating - 24V DV/50A. Quote for material
Following Miscellaneous items:- (a) Tool Box with open and ring spanner (6-32 mm) (b) Allen Key set (c ) Screw driver set (d) Box spanner . Quote for Material.
Following tools to be provided for onboard maintenance:- (a) Self-centring mechanical easy puller (2/3 arm)- 01, Cap- 5T, Make- Powerjac(PM105) (b) Hydraulic puller (2/3 arm)- 01, Cap-6T, Make- Powerjac(PM600) (c ) Power & hand tool kit(92 tools)- 01, Make- Bosch(GSB500RE) (d) Hydraulic wedge spreader(HWS series)- 01, Cap- 8T, Make- Powerjac(HWS8) (e) Bench Vice 300mm (Heavy duty)- 02 (f) Surface plate (630X400mm)- 01, Mat- Cast iron, Garde 1 (g) Anvil 100Kg- 01 (h) Universal V block(100x63x100mm)- 02 (j) Cordless Impact wrench- 01, Make- Bosch(GDS250LI). (k) Bearing puller. (l) Electrical tool kit (m) Rachet box (n) Pointed Soldering iron. (p) Allen key set (q) Socket set (r) combination pliar, Qty-10 (s) Nose pliar, Qty-10 (t) Water pump Pliar, Qty-10 (u) Heavey duty Screw driver set, Qty-05 (v) Flip Heavey duty Screw driver set, Qty-05 (w) T-spanner set, Qty-05. Quote for Material
Indication panel in wheel house for Anemometer not showing reading. Undertake calibration of the system and prove system as per designed performance. Quote for Service and Material
Portable Shore Supply Connection Box with Industrial sockets and plug (125 Amps) alongwith following fitted instrumentation (i) Ammeter (0- 100 Amps), (ii) Voltmeter (0- 600 Volts), (iii) Phase sequence meter (iv) Current Transformer and other miscellaneous fittings. Note: - Shore Supply Connection box to be of IP 67 rating. Quote for Material.
Overhauling of fire hydrants to be carried out, brass coupling to be renewed. Respective 'O' ring and plastic cap to be Replaced. Quote for Service and Material.
Temperature thermometers of various system lines to be Replaced as per sample. Quote for Service and Material.
Cable gland- 10 no. cable gland damged, gland packing to be carried out on the same. Quote for Service and Material
Ventillation blower with 10 mtr exhaust trunking. Rating- 80W/220V, 2800 RPM. Quote for Material
Portable DD pump (Make- Mody, 37 TPH):- Overhauling to be carried out on 04 in no's 37 TPH Portable DD Pump. Quote for Service and Material , Payment on actuals
Heavy Duty Flexible hoses: Heavy Duty Flexible hoses (04 inch). Length-15 mtr, Mat: plastic, qty- 05. Quote for material, Payment on actuals.
09 Ltr AFFF Extingusher: Pressure testing to be carried out on 10 in nos 09 ltr AFFF Extinguishers. Extinguishers to be replaced if pressure testing failed. Quote for Service and Material, Payment on actuals
2 KG CO2 Extinguisher: Pressure testing to be carried out on 05 in nos 2 kg CO2 Extinguisher. Quote for Service and Material , Payment on actuals
Fire Hoses : New fire hoses fire hoses/ water hose. Qty- 05 Quote for Material , Payment on actuals.
Ballast tank knuckle joints and gear box to be replaced. Quote for Service and Material
Pipe clamps in ballast tanks to be renewed. Quote for Service and Material
Following spares of Main Engine to be provided. (a) Cylinder Liner, Qty-12. (b) Ready wash, 500 Ltrs. (c) Coolant,500 Ltrs. (d) Kit Engine Piston (KIT3802657) (e) Solenoid, Qty-04. Quote for material
Exhaust compensator of Main Engine and DA to be replaced. Quote for Service and Material
Chemical cleaning and pressure testing of Both Main Engines and Both DA exhaust trunkings to be carried out. Quote for Service and Material
Services for hiring of Crane/ genie/ Forklift/ pickup truck etc. as required to facilitate refit ativities being undertaken by vendor. Quote for Service
Class certified Quality Control (QC) inspector for Hull, Engineering and Electrical be deputed for QC checks and material authorisation. Payment on actuals. Quote for Service
Complete renewal of engine harness for Both Main Engines including ECM and safety devices view damaged.
Overhauling of dynamo of both Diesel Alternators view faulty. Sea water pump discharge gauge to be installed for both DAs.
Fwd Pump Room supply fan mesh to be renewed view highly damaged.
Fwd DD Fire Pump exhaust pipe and lagging(12 m2) (deck to bottom) (20 rmt) to be replaced view completely perished.
All cargo and ballast tanks filling valve tallies to be renewed as per sample. Qty - 60, Mat - Brass.
Cargo pump room lights protective covering to be renewed view damaged.
SOlas Marine Services Pvt. Ltd.
WINTECH ENGINEERING WORKS
YEOMAN MARINE SERVICES PVT. LTD.
CARE MARINE AND ALLIED SERVICES
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .