| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 LAccepted-AOC | ₹3.2 L | 1 | Accepted-AOC LOW RATE |
| 2 | 2₹3.3 L+₹2,372.79 (0.73%)Rejected-Finance | ₹3.3 L+₹2,372.79 (0.73%) | 2 | Rejected-Finance HIGH RATE |
| 3 | 3₹3.3 L+₹5,074.29 (1.57%)Rejected-Finance | ₹3.3 L+₹5,074.29 (1.57%) | 3 | Rejected-Finance HIGH RATE |
| Sl No | Description | Qty | Unit | MANEESH.P.V L2 | RAJEEV E N L1 | Ajith E P L3 |
|---|---|---|---|---|---|---|
| 1.00IMPROVEMENT WORKS | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 0.11 | cum | 231.31 ₹24.98 | 229.63 ₹24.8 Lowest | 233.23 ₹25.19 |
| 1.00 | 9.48.2:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to openings/ wooden frames with rawl plugs screws etc | 600 | kg | 222.57 ₹1,33,542 | 220.95 ₹1,32,570 Lowest | 224.41 ₹1,34,646 |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 281.4 | kg | 167.95 ₹47,261.13 | 166.72 ₹46,915.01 Lowest | 169.34 ₹47,652.28 |
| 1.00 | OD537016/2025-2026:Providing and fixing Alu Zinc profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge)
0.40 mm (+0.05%), thickness . Sheet should have protective guard film of 25 microns minimum to avoid scratches
during transportation and should be supplied in single length up to 12 metre or as desired by Engineer-in-charge. The
sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete up to any pitch
in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size
and shape wherever required. (MOD 12.50 of DSR ) | 48.74 | sqm | 518.03 ₹25,250.34 | 514.26 ₹25,066.58 Lowest | 522.33 ₹25,459.93 |
| 1.00 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 0.11 | cum | 8,137.07 ₹878.8 | 8,077.86 ₹872.41 Lowest | 8,204.73 ₹886.11 |
| 1.01 | OD537019/2025-2026:Providing and fixing 150 mm UPVC square gutter pipe GI clamp of same profile @ 1 mtr C/C | 10.05 | metre | 314.59 ₹3,161.63 | 312.3 ₹3,138.62 Lowest | 317.2 ₹3,187.86 |
| 1.01 | 50.18.8.8.2:Providing and fixing PVC pipes, fittings, including fixing the pipe with clamps at 1.00 m spacing. this includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per the direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 75 mm pipe 4 kgf/cm2 | 7 | metre | 601.95 ₹4,213.65 | 597.57 ₹4,182.99 Lowest | 606.95 ₹4,248.65 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 360 | kg | 160.2 ₹57,672 | 159.04 ₹57,254.4 Lowest | 161.53 ₹58,150.8 |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 48 | sqm | 148.02 ₹7,104.96 | 146.95 ₹7,053.6 Lowest | 149.25 ₹7,164 |
Tender Value
₹3.4 Cr
EMD Value
₹8,473
Closing Date
13 Jun 2026, 5:00 pmClosed
ASSISTANT ENGINEER
KURUMATHUR GP
Annual Plan-KURUMATHUR GP - PROJ.NO.333/25-26-IMPROVEMENT WORKS OF MODERN GAS CREMATORIUM AT MANJAAL-General Civil Work (RETENDER)
2026_LSGD_850207_9
AE/KMTR/TN/01/2026-27
Open Tender
Civil Works - Buildings
Item Rate
180 days
KURUMATHUR GP
Please refer Tender documents.
9 documents required · 9 mandatory
₹750
Yes
₹8,473
Yes
21 Aug 2026
6 Jun 2026
15 Jun 2026
6 Jun 2026
13 Jun 2026
6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1IMPROVEMENT WORKS | |||||
| 1.001 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.002 | 9.48.2:Providing and fixing M.S. Grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete.Fixed to openings/ wooden frames with rawl plugs screws etc | - | kg | - | - |
| 1.003 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 1 | kg | - | - |
| 1.004 | OD537016/2025-2026:Providing and fixing Alu Zinc profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge)
0.40 mm (+0.05%), thickness . Sheet should have protective guard film of 25 microns minimum to avoid scratches
during transportation and should be supplied in single length up to 12 metre or as desired by Engineer-in-charge. The
sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete up to any pitch
in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size
and shape wherever required. (MOD 12.50 of DSR ) | - | sqm | - | - |
| 1.005 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.006 | OD537019/2025-2026:Providing and fixing 150 mm UPVC square gutter pipe GI clamp of same profile @ 1 mtr C/C | - | metre | - | - |
| 1.007 | 50.18.8.8.2:Providing and fixing PVC pipes, fittings, including fixing the pipe with clamps at 1.00 m spacing. this includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per the direction of Engineer-in-Charge. Concealed work, including cutting chases and making good the wall etc. 75 mm pipe 4 kgf/cm2 | - | metre | - | - |
| 1.008 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | kg | - | - |
| 1.009 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_1444486.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 1.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .