Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹26.9 LRejected-Finance | l1 | Rejected-Finance L1 - Tender rejected from SE office | |
| 2 | l2₹27.0 L+₹9,859.91 (0.37%)Rejected-Finance | l2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | J JUSTIN JOSE L1 | SAJIKUMAR P L2 |
|---|---|---|---|---|---|
| 1.00Building Maintenance | |||||
| 1.00 | 15.17.1:Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:R.S. Joists | 36 | kg | 3.2 ₹115.2 Lowest | 3.21 ₹115.56 |
| 1.00 | 15.52:Dismantling of flushing cistern of all types (C.I. / PVC/ Vitrous China) including stacking of useful materials near the site and disposal of unserviceable materials within 50 metres lead | 4 | each | 861.17 ₹3,444.68 Lowest | 864.32 ₹3,457.28 |
| 1.00 | 15.23.1:Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 metres lead.For thickness of tiles 10 mm to 25 mm | 8.76 | sqm | 70.7 ₹619.33 Lowest | 70.96 ₹621.61 |
| 1.00 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 4 | each | 353.77 ₹1,415.08 Lowest | 355.06 ₹1,420.24 |
| 1.00 | 14.4.1:Making the opening in brick masonry including dismantling in floor or walls by cutting masonry and making good the damages to walls, flooring and jambs complete, to match existing surface i/c disposal of mulba / rubbish to the nearest municipal dumping ground.For door / window / clerestory window | 3 | sqm | 1,201.86 ₹3,605.58 Lowest | 1,206.25 ₹3,618.75 |
| 1.01 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 2.13 | cum | 1,894.57 ₹4,044.91 Lowest | 1,901.49 ₹4,059.68 |
| 1.01 | 15.14.2:Dismantling wood work in frames, trusses, purlins and rafters up to 10 metres span and 5 metres height including stacking the material within 50 metres lead:Of sectional area below 40 square centimeters | 19.2 | metre | 17.26 ₹331.39 Lowest | 17.32 ₹332.54 |
| 1.01 | 15.1:Demolishing lime concrete manually / by mechanical means and disposal of material within 50 metres lead as per direction of Engineer - in- Charges. | 3.63 | cum | 783.02 ₹2,841.58 Lowest | 785.88 ₹2,851.96 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 395 | kg | 168.83 ₹66,687.85 Lowest | 169.44 ₹66,928.8 |
Tender Value
₹29 L
EMD Value
₹50,000
Closing Date
15 Mar 2025, 6:00 pmClosed
Assistant Engineer,LSGD Section,Kattakada GP
O/o the Assistant Engineer,LSGD Section,Kattakada GP
Kattakada GP - 2024-25 Proj No 86/25 Maintenance and Baby Friendly Painting of various Anganvadies
2025_LSGD_743434_1
62/ET/KTDA/24-25
Open Tender
Civil Works - Buildings
Item Rate
180 days
Kattakada Grama Panchayath
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,760
Yes
₹50,000
Yes
12 Nov 2025
4 Mar 2025
19 Mar 2025
4 Mar 2025
15 Mar 2025
4 Mar 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1197765.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .